Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
1001 01‐0A011 HUM 101 83.4 $65.00
In Humboldt County on Route 101 at the Bracut Maintenance Station (Location Code 5708)
Bracut Septic System Upgrade
UPGRADE SEPTIC SYSTEM 9/5/2014
SHOPP MINOR B
1002 01‐0A150 HUM 211 74.4 $2,197.00
IN HUMBOLDT COUNTY NEAR FERNDALE FROM 0.2 MILE SOUTH OF SALT RIVER OVERFLOW TO ROUTE 101
Ferndale Hot Mix Asphalt
RUBBERIZED HOT MIX ASPHALT 7/1/2015
MAINTENANCE
1003 01‐0A320 HUM 299 30.25 $1,386.00
IN HUMBOLDT COUNTY ABOUT 9 MI WEST OF WILLOW CREEK FROM 0.3 MI WEST TO 0.1 MI EAST OF CEDAR CREEK ROAD
Cedar Gap Curve
Curve Improvement 4/1/2015
SHOPP MAJOR
1004 01‐0A460 59V01 001 11.3 $376,000.00IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS
Bridge Repair Scour
BRIDGE REHAB ‐ SCOUR
2/15/2015MAINTENANCE
1005 01‐0A470 59V01 101 2.5 $0.00IN MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS
Bridge Repair Scour
BRIDGE REHAB ‐ SCOUR
11/1/2014MAINTENANCE
1006 01‐0A490 HUM 299 25 $4,071.00
IN HUMBOLDT COUNTY ABOUT 13 MILES WEST OF WILLOW CREEK FROM 0.4 MILES EAST TO 1.1 MILES EAST OF CHEZEM ROAD
Circle Point Curve
CURVE IMPROVEMENT 8/1/2015
SHOPP MAJOR
12 Month Look Ahead Projects as of July 2014
1
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1007 01‐0A510 LAK 20 28.2 $0.00
IN LAKE COUNTY IN CLEARLAKE OAKS FROM KEYS BOULEVARD TO FOOTHILL BOULEVARD
Clearlake SRTS / CT Oversite 7/3/2015
STIP Local Delivery
1008 01‐0A520 HUM 299 21.1 $2,774.00
IN HUMBOLDT COUNTY ABOUT 16 MILES EAST OF BLUE LAKE FROM 0.5 TO 0.9 MILE EAST OF CHEZEM ROAD Lupton Curve
CURVE IMPROVEMENT 6/15/2015
SHOPP MAJOR
1009 01‐0A540 MEN 101 64.7 $0.00
IN MENDOCINO COUNTY NEAR LAYTONVILLE FROM LONG VALLEY CREEK BRIDGE TO DAVIDSON ROAD
Laytonville Rumble Strips 8/4/2014
SHOPP MINOR B
1010 01‐0A600 HUM 96 29.5 $0.00
IN HUMBOLDT COUNTY NEAR ORLEANS AT 0.6 MI EAST OF BLUFF CREEK BRIDGE #4‐225 Repair Slide 12/16/2014
Director's Order Project
1011 01‐0A680 59V01 029 $372,000.00IN HUMBOLDT AND LAKE COUNTIES AT VARIOUS LOCATIONS
HUM‐LAK‐29, 53‐VAR
REPLACE TRAFFIC SIGNAL HEADS
2/1/2015MAINTENANCE
1012 01‐0A700 MEN 101 81.4 $1,304.00
IN MENDOCINO COUNTY NEAR LEGGETT FROM 0.1 MI SOUTH OF RATTLESNAKE CREEK BRIDGE #10‐0027 TO CUMMINGS ROAD UNDERCROSSING
OG Bonded Wearing Course
OPEN GRADED BONDED WEARING COURSE 1/15/2015
MAINTENANCE
2
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1013 01‐0A760 MEN 101 23.5 $0.00
IN MENDOCINO COUNTY IN UKIAH AT TALMAGE ROAD
Talmage Road Interchange 10/15/2014
Local Capital Outlay
1014 01‐0A800 MEN 128 26.8 $1,428.00
IN MENDOCINO COUNTY AT BOONVILLE FROM 0.2 MILE EAST OF PEACHLAND ROAD TO ROBINSON CREEK BRIDGE
Robinson Creek Rubberized Gap
RUBBERIZED GAP GRADED 12/1/2014
MAINTENANCE
1015 01‐0B000 LAK 20 13.57 $22,000.00
IN LAKE COUNTY IN & NEAR LUCERNE FROM 0.1 MI WEST OF SAYRE AVE TO 0.2 MI WEST OF JUNCTION ROUTE 53 LAK‐20 CAPM
REPLACE HOT MIX ASPHALT, APPLY GAP GRADED RUBBERIZED HOT MIX ASPHALT 9/15/2014
SHOPP MAJOR
1016 01‐0B020 MEN 20 28.85 $0.00
IN LAKE COUNTY NEAR CLEARLAKE OAKS FROM KEYS BLVD TO ORCHARD SHORES DR
Clearlake oaks Rumble Strips 8/4/2014
SHOPP MINOR B
1017 01‐0B030 HUM 96 8.3 $2,500.00
IN HUMBOLDT COUNTY FROM 8.3 MILES EAST OF WILLOW CREEK TO 0.3 MILES WEST OF SHOEMAKER ROAD
Hoopa Vista Point Curve Improvement
CURVE IMPROVEMENT 3/1/2015
SHOPP MAJOR
3
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1018 01‐0B080 DN 101 4 $3,360.00
IN DEL NORTE COUNTY NEAR KLAMATH FROM 0.4 MILES NORTH OF KLAMATH RIVER BRIDGE TOHIGH PRAIRIE CREEK BRIDGE
KLAMATH CAPM AC OVERLAY 12/1/2014
SHOPP MAJOR
1019 01‐0B180 DN 199 8.15 $0.00
IN DEL NORTE COUNTY NEAR HIOUCHI FROM 1.0 TO 1.2 MILES EAST OF SOUTH FORK ROAD Hiouchi HFST 10/20/2014
1021 01‐0B300 DN 101 22 $1,500.00
IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.6 MI SOUTH OF HAMILTON ROAD #8070
South Hamilton Slipout
STABILIZE ROADWAY 8/26/2015
Storm Damage
1022 01‐0B310 DN 199 8.7 $1,250.00
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 2.3 MILES SOUTH OF HARDSCRABBLE CR BR #1‐8 AND AT 0.3 MI SOUTH OF PATRICKS CR CAMPGROUND
Patrick Creek Slipout
CONSTRUCT BUTTRESSES 4/1/2015
Storm Damage
1023 01‐0B320 DN 199 24.6 $3,000.00
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.6 MI NORTH OF MID FK SMITH RIVER BR #1‐15
Middle Fork Wall
CONSTRUCT SOLDIER PILE WALL 7/1/2015
Storm Damage
4
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1024 01‐0B340 HUM 36 22.8 $1,410.00
IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT VARIOUS LOCATIONS FROM 1.1 MILES WEST TO 3.7 MILES EAST OF VAN DUZEN RIVER BRIDGE #04‐0293
Larabee 3 Slip Repair
RECONSTRUCT ROADWAY & DRAINAGE 3/2/2015
Storm Damage
1025 01‐0B350 HUM 36 30.2 $1,350.00
IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT 0.1 MI WEST OF MCCLELLAN MTN RD #7F010
Maple Stablization
STABILIZE ROADWAY 5/6/2015
Storm Damage
1026 01‐0B360 HUM 36 35.5 $4,630.00
IN HUMBOLDT COUNTY NEAR DINSMORE FROM 0.1 MI EAST OF SFK VAN DUZEN RIVER BR#4‐119 TO 0.1 MI EAST OF VAN DUZEN RIVER BR#4‐129
Dinsmore Slipouts/Sinks
RECONSTRUCT ROADWAY & DRAINAGE 4/1/2015
Storm Damage
1027 01‐0B370 HUM 36 44.4 $1,600.00
IN HUMBOLDT COUNTY NEAR DINSMORE AT 1.2 MILES WEST OF THE HUMBOLDT‐ TRINITY COUNTY LINE Cobb Slide SLIDE REPAIR 3/10/2015
Storm Damage
1028 01‐0B380 HUM 96 4.1 $1,600.00
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AND HOOPA AT 2.5 MILES WEST OF SUGAR BOWL ROAD Pipeline Slide SLIDE REPAIR 8/25/2014
Storm Damage
5
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1029 01‐0B390 HUM 96 8.5 $8,000.00
IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.2 TO 0.4 MI EAST OF END SIDEHILL VIADUCT2 #4‐289
Hoopa Vista Point Slide
STABILIZE ROADWAY 8/26/2015
Storm Damage
1030 01‐0B400 HUM 101 15 $2,180.00
IN HUMBOLDT COUNTY NEAR REDWAY AT 1.5 MILES SOUTH OF HURLBUTT UC# 4‐213 AND AT 1.1 MILES SOUTH OF WILLIFORD RD UC# 4‐117
So. Hum Storm Repairs
RECONSTRUCT ROADWAY & DRAINAGE 1/30/2015
Storm Damage
1031 01‐0B410 HUM 101 40.9 $1,450.00
IN HUMBOLDT COUNTY NEAR REDCREST AT 1.1 MILES NORTH OF REDCREST NB ONRAMP Redcrest Slide
RECONSTRUCT ROADWAY & DEWATER 5/6/2015
Storm Damage
1032 01‐0B450 HUM 299 10.7 $2,560.00
IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.3 MI WEST OF N FORK MAD RIVER BR#4‐194 TO 1.3 MILES WEST OF OLD THREE CR RD#6L250
299 Slip / Slides
REPAIR SLIDES & SLIPOUTS 7/22/2015
Storm Damage
1033 01‐0B460 HUM 299 32 $1,350.00
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BR#4‐115
Willow Creek Wall
STABILIZE ROADWAY 9/1/2014
Storm Damage
6
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1034 01‐0B470 MEN 1 35.7 $450.00
IN MENDOCINO COUNTY NEAR ELK AT 1.8 MILES NORTH OF PHILO GREENWOOD RD‐ 132
Satori Gulch Slip REPAIR SLIPOUT 8/1/2015
Storm Damage
1035 01‐0B570 MEN 253 6.8 $2,500.00
IN MENDOCINO COUNTY NEAR BOONVILLE AT 3.4 MILES EAST OF SODA CREEK BR# 10‐229 253 Slip Wall
STABILIZE ROADWAY 3/1/2015
Storm Damage
1036 01‐0B590 HUM 101 123.8 $190.00
IN HUMBOLDT COUNTY NEAR ORICK FROM DAVIDSON ROAD TO 0.2 MI NORTH OF DAVIDSON ROAD
Davidson road HFST
PLACE HIGH FRICTION COURSE 10/24/2014
SHOPP MINOR B
1037 01‐0B610 HUM 101 86.5 $150.00
IN HUMBOLDT COUNTY IN ARCATA AT THE 14 STREET OVERCROSSING
Construct Left Turn lane
CONSTRUCT TURN LANE 10/27/2014
SHOPP MINOR B
1038 01‐0B720 DN 101 39.3 $0.00
IN DEL NORTE COUNTY NEAR SMITH RIVER FROM RD TO SIMONSON LMBR CO TO 0.1 MI SOUTH OF ENT PANORAMIC TLR PK
US 101 Multimodal 8/1/2014
1039 01‐0B760 DN 199 1.4 $0.00
IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 1.4 MILES EAST OF THE JUNCTION OF US 101
Install High Friction Surface Treatment 12/1/2014
SHOPP MINOR B
7
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1040 01‐0B770 HUM 96 23.1 $600.00
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM KLAMATH RIVER BRIDGE #4‐144 TO SLATE CREEK BRIDGE
Weitchpec Seal Coat
PLACE SEAL COAT 4/1/2015
MAINTENANCE
1041 01‐0B800 MEN 1 40.9 $1,020.00
IN MENDOCINO COUNTY NEAR ALBION FROM 0.6 MILE NORTH OF NAVARRO RIVER BRIDGE TO ALBION RIVER BRIDGE
MEN‐1 RHMA Overlay RHMA OVERLAY 3/1/2015
MAINTENANCE
1042 01‐0B810 MEN 101 1 $1,300.00
IN MENDOCINO COUNTY NEAR LEGGETT FROM CUMMINGS ROAD UNDERCROSSING TO 0.6 MILE SOUTH OF JITNEY GULCH BRIDGE
Leggett OG Bonded Wearing Course
OPEN GRADED BONDED WEARING COURSE 3/1/2015
MAINTENANCE
1043 01‐0B840 DN 199 1 $1,500.00
IN DEL NORTE COUNTY ON ROUTE 199 FROM 101 TO SMITH RIVER BRIDGE DN‐199 BWC
BONDED WEARING COURSE 11/1/2014
MAINTENANCE
1044 01‐0B860 HUM 211 73.2 $236.00
IN HUMBOLDT COUNTY IN FERNDALE FROM OCEAN AVENUE TO TENNYSON AVENUE
Ferndale Sidewalk Repair Sidewalk 1/1/2015
MAINTENANCE
1045 01‐0C120 MEN 1 81.1 $460.00
IN MENDOCINO COUNTY NEAR HARDY AT 0.5 MILE NORTH OF HOWARD CREEK BRIDGE
Union Landing Vista Point Repair Slipout 8/1/2015
Storm Damage
8
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1046 01‐0C350 LAK 29 34.4 $4,161.00
IN LAKE COUNTY NEAR LAKEPORT FROM 5.7 MILES SOUTH OF JUNCTION ROUTE 175 TO 0.1 MILE SOUTH OF JUNCTION ROUTE 175 Lak 29 CAPM
PAVEMENT REHAB 9/1/2014
SHOPP MAJOR
1047 01‐0C400 MEN 101 93.06 $0.00
IN MENDOCINO COUNTY NEAR LEGGETT FROM JITNEY GULCH BRIDGE TO 1.8 MILES NORTH OF THE JUNCTION OF RTE 101 AND STATE ROUTE 1
Jitney Gulch‐MBGR 9/1/2014
SHOPP MINOR B
1048 01‐0C460 HUM 299 5.5 $5,200.00
IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM BLUE LAKE UNDERCROSSING #4‐193 TO NORTH FORK MAD RIVER BRIDGE #4‐194
HUM 299 CAPM
PAVEMENT REHAB 9/1/2014
SHOPP MAJOR
1049 01‐0C490 MEN 1 17.6 $107.00
IN MENDOCINO COUNTY NEAR POINT ARENA AT THE GARCIA RIVER OVERFLOW BRIDGE
Garcia River Overflow Bridge REPAIR BRIDGE 4/10/2015
MAINTENANCE
1050 01‐0C610 MEN 1 40 $926.00
IN MENDOCINO COUNTY NEAR MENDOCINO AT NAVARRO RIVER BRIDGE
Clean and Paint NaVARro River Br
Clean & Paint Bridge 12/20/2014
MAINTENANCE
9
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1051 01‐0C680 HUM 101 77.9 $0.00
IN HUMBOLDT COUNTY IN EUREKA FROM NORTHBOUND COMMERCIAL STREET TO 4TH STREET AND FROM 5TH STREET TO E STREET
Broadway/Fifth 5/1/2015
SHOPP MINOR B
1052 01‐0C690 59V01 101 103.7 $0.00
IN HUMBOLDT, LAKE, MENDOCINO AND TRINITY COUNTIES AT VARIOUS LOCATIONS
Roadside Radio Stations
9/1/2014MAINTENANCE
1053 01‐0C820 MEN 162 1.72 $850.00
IN MENDOCINO COUNTY NEAR DOS RIOS AT 1 MILE NORTH OF OUTLET CREEK BRIDGE Road Washout 12/1/2014
Director's Order Project
1054 01‐0C830 LAK 29 48.4 $2,025.00
IN LAKE COUNTY NEAR UPPER LAKE FROM 0.5 MILE NORTH OF LUCERNE UC TO 0.2 MILE NORTH OF SCOTTS CREEK BRIDGE
Cold In Place Recycle
Cold In‐Place Recycling 3/1/2015
MAINTENANCE
1055 01‐0C850 MEN 1 61.3 $0.00
IN MENDOCINO COUNTY IN FORT BRAGG FROM OAK STREET TO PINE STREET
Fort Bragg Merge 11/1/2014
STIP Local Delivery
1056 01‐0C860 MEN 1 37.33 $1,500.00
IN MENDOCINO COUNTY NEAR ELK AT 1.5 MILES SOUTH OF NAVARRO BRIDGE RD 517A Slipout 1/22/2015
Director's Order Project
10
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1057 01‐0C890 HUM 211 73.97 $0.00
IN HUMBOLDT COUNTY IN FERNDALE FROM TENNYSON AVENUE INTERSECTION TO 0.1 MI NORTH OF TENNYSON AVENUE
Ferndale Sidewalk Replacement 10/9/2014
SHOPP MINOR B
1058 01‐0C900 MEN 101 50.7 $763.00
IN MENDOCINO COUNTY NEAR WILLITS FROM 0.05 MI SOUTH OF THE REYNOLDS HIGHWAY TO 0.53 MILES SOUTH OF RYAN CREEK ROAD
Men 101 OGAC Overlay near Willits
OPEN GRADE AC OVERLAY 11/1/2014
SHOPP MAJOR
1059 01‐0C910 LAK 20 1 $150.00
IN LAKE COUNTY NEAR BLUE LAKES FROM 1.0 MILES EAST OF THE LAKE COUNTY LINE TO 1.3 MILES WEST OF SCOTT VALLEY ROAD
Blue Lakes "Radar Signs"
INSTALL RADAR FEEDBACK SIGNS 4/27/2015
SHOPP MINOR B
1060 01‐0C920 MEN 1 55 $230.00
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM 0.16 MILES NORTH OF THE END OF CASPAR CREEK BRIDGE #10‐153 TO 0.14 MILES NORTH OF CASPAR STREET INTERSECTION
Caspar "Flashing Beacons" 10/7/2014
SHOPP MINOR B
11
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1061 01‐0C940 HUM 96 3.7 $660.00
IN HUMBOLDT COUNTY NEAR HOOPA FROM 4.3 MILES WEST OF TISH TANG CAMPGROUND TO SUPPLY CREEK BRIDGE AR Chip Seal AR Chip Seal 10/1/2014
MAINTENANCE
1062 01‐0C990 DN 101 27.2 $180.00
IN DEL NORTE COUNTY NEAR CRESCENT CITY BETWEEN BURTCHELL ROAD AND WASHINGTON BLVD OVERCROSSING
Crescent City "Hawk System"
PEDESTRIAN HYBRID SYSTEM 2/22/2015
SHOPP MINOR B
1063 01‐0E020 HUM 299 29.2 $0.00
IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.1 MILE EAST OF TITLOW HILL ROAD TO 0.2 MILE WEST OF ROUTE 96
Hot Mix Asphalt 11/1/2014
MAINTENANCE
1064 01‐0E060 HUM 101 70.94 $260.00
IN HUMBOLDT COUNTY NEAR EUREKA ALONG THE SB EXIT RAMP OF COLLEGE OF THE REDWOODS (EXIT 698) TO THE END OF THE SB RAMP AT THE INTERSECTION OF TOMPKINS HILL ROAD
TOMPKINS HILL WIDEN SHOULDER
WIDEN SHOULDER 2/24/2015
SHOPP MINOR B
1065 01‐0E130 MEN 101 10.8 $125.00 IN MENDOCINO COUNTY AT VARIOUS LOCATIONS
Roadside Radio Repeaters
Roadside Radio Repeaters 6/1/2015
MAINTENANCE
12
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1066 01‐0E140 DN 199 33.1 $0.00
IN DEL NORTE COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF COLLIER TUNNEL TO 0.2 MILE SOUTH OF THE OREGON STATE LINE
Restore Collier Tunnel Communication
RESTORE COLLIER TUNNEL COMMUNICATION 8/1/2014
MAINTENANCE
1067 01‐0E180 MEN 101 58.9 $0.00
IN MENDOCINO COUNTY ABOUT 7 MILES SOUTH OF LAYTONVILLE FROM 0.4 MILE SOUTH TO 2.5 MILES NORTH OF ROUTE 101/162
HMA Overlay Rest Areas HMA Overlay 2/20/2015
MAINTENANCE
1068 01‐0E200 MEN 1 43.6 $1,740.00
IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM ALBION RIVER BRIDGE TO TEN MILE RIVER BRIDGE
Men‐1 3‐Bridges REHAB BRIDGES 1/16/2015
MAINTENANCE
1070 01‐0E230 HUM 101 48.6 $2,310.00
IN HUMBOLDT COUNTY NEAR SCOTIA AT EEL RIVER OVERHEAD BRIDGE No. 04‐0014 Eel River BOH
REHABILITATE BRIDGE DECK 3/1/2015
SHOPP MAJOR
1071 01‐0E250 HUM 101 74.24 $80.00
IN HUMBOLDT COUNTY NEAR EUREKA AT 0.36 MILE SOUTH OF ELK RIVER BB #4‐21
EO Repair Culvert
REPAIR CULVERT 6/1/2015
Director's Order Project
13
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1072 01‐0E280 59V01 101 34 $1,263,000.00
IN MENDOCINO & HUMBOLDT COUNTIES AT VARIOUS LOCATIONS FROM 0.8 MI NORTH OF WILLITS TO RATTLESNAKE CREEK BRIDGE & FROM THE HUMBOLDT CO LINE TO 0.4 MI SO OF NEWTON B DRURY
MEN/HUM 101 Rumble Strip
INSTALL CENTERLINE & SHOULDER RUMBLE STRIPS
8/1/2015SHOPP MAJOR
1073 01‐0E310 HUM 101 15.47 $1,000.00
IN HUMBOLDT COUNTY SOUTH OF HURLBUTT UNDERCROSSING Repair Culvert
REPLACE UNDER DRAIN PIPES 10/2/2014
Director's Order Project
1074 01‐0E390 59V01 101 0 $0.00IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS
Finch Creek Digouts
Replace AC Surfacing
7/6/2015MAINTENANCE
1075 01‐0E430 MEN 1 92.85 $1,500.00
IN MENDOCINO COUNTY NEAR ROCKPORT ON ROUTE 1 AT 0.05 MILE NORTH OF DUNN CREEK BRIDGE
Rockport Slipout REPAIR SLIPOUT 6/19/2015
Director's Order Project
1076 01‐0E450 DN 101 17.5 $0.00
IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 2.8 MILES SOUTH OF MILL CREEK PARK ENTRANCE ROAD #8068 Repair Sink REPAIR SLIPOUT 3/9/2015
Director's Order Project
14
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1077 01‐0E520 59V01 299 0 $900,000.00
IN HUMBOLDT AND TRINITY COUNTIES NEAR WILLOW CREEK FROM 0.2 MILES WEST OF ROUTE 96 TO 0.5 MILES EAST OF SOUTH FORK TRINITY RIVER BRIDGE
SOUTH FORK OVERLAY
OVERLAY 1/12/2015MAINTENANCE
1078 01‐26202 MEN 101 43.5 $26,290.00
IN MENDOCINO COUNTY NEAR WILLITS FROM HAEHL OVERHEAD TO REYNOLDS HWY
Wetland & Riparian Mitigation
WETLAND / RIPARIAN MITIGTATION ‐ WILLITS BYPASS COMPANION 8/1/2015
STIP FULLY FUNDED
1079 01‐29200 MEN 20 0.3 $0.00
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM 0.4 KM TO 3.9 KM EAST OF STATE ROUTE 1
Construct 2‐Way Left Turn Lane 7/3/2015
SHOPP MAJOR
1080 01‐29313 VAR 101 0 $4,941.00
IN DEL NORTE COUNTY NORTH OF CRESCENT CITY AT SMITH RIVER OVERFLOW BRIDGE AND AT GILBERT CREEK BRIDGE
Gilbert Creek & Smith River Overflow Bridges
WIDEN ROADWAY AND BRIDGES 7/3/2015
SHOPP MAJOR
15
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1081 01‐29314 DN 199 10.9 $2,561.00
IN DEL NORTE COUNTY NEAR GASQUET FROM 0.3 KM SOUTH HARDSCRABBLE CREEK BRIDGE TO 0.2 KM NORTH OF HARDSCRABBLE CREEK BRIDGE
Replace Hardscrabble Creek Bridge
REPLACE BRIDGE 7/3/2015
SHOPP MAJOR
1082 01‐3116U MEN 162 0.5 $4,765.00
IN MENDOCINO COUNTY ON ROUTE 162 AT OUTLET CREEK BRIDGE AND ON ROUTE 253 AT ANDERSON CREEK BRIDGE AND SODA CREEK BRIDGE
Outlet/Soda/Anderson CrB
WIDEN BRIDGES AND UPGRADE RAIL 7/1/2015
SHOPP MAJOR
1083 01‐34540 DN 101 43.6 $6,995.00
IN DEL NORTE COUNTY NEAR SMITH RIVER FROM 6.4 KM NORTH OF ROWDY CREEK BRIDGE TO 1.0 KM SOUTH OF OREGON STATE LINE
Smith River Safety
SHOULDER WIDENING AND LEFT TURN 7/3/2015
SHOPP MAJOR
1084 01‐36291 MEN 101 9.6 $12,456.00
NEAR HOPLAND FROM HOPLAND OVERHEAD BRIDGE TO FELIZ CREEK BRIDGE AND FROM 0.1 MILE NORTH OF FIRST STREET TO ROBINSON CREEK BRIDGE Hopland CAPM
RUBBERIZED HMA OVERLAY 9/1/2014
SHOPP MAJOR
16
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1085 01‐3637U MEN 128 31 $8,437.00
IN MENDOCINO COUNTY NEAR YORKVILLE FROM 0.3 MILE EAST OF ROBINSON CREEK BRIDGE TO THE SONOMA COUNTY LINE
MEN‐128 CAPM
RUBBERIZED HMA OVERLAY 7/10/2015
SHOPP MAJOR
1086 01‐37813 MEN 128 30.1 $1,000.00
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 MILE EAST OF THE ROUTE 253 /128 JUNCTION TO MOUNTAIN HOUSE RD
22 Culverts ‐ Men 128 Minor A Split Project
CULVERT REHABILITATION 2/1/2015
SHOPP MINOR A
1087 01‐37814 MEN 128 10.6 $950.00 IN MENDOCINO COUNTY AT VARIOUS LOCATIONS
21 Culverts ‐ Men 128 Minor A Split Project
CULVERT REHABILITATION 2/1/2015
SHOPP MINOR A
1088 01‐37817 MEN 128 0.2 $3,388.00
NEAR NAVARRO FROM EAST TO ROUTE 1 TO WEST OF FLYNN CREEK BRIDGE REHAB CULVERTS
76 Culverts ‐ Lower NaVARro River Split Project
CULVERT REHABILITATION 3/15/2015
SHOPP MAJOR
1089 01‐38560 LAK 29 0.1 $300.00
IN LAKE COUNTY NEAR MIDDLETOWN AT ST HELENA CREEK BRIDGE #14‐0052
Lak‐29‐St. Helena Creek Bridge
SCOUR MITIGATION 7/1/2015
SHOPP MAJOR
17
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1090 01‐39910 HUM 36 1.7 $9,431.00
IN HUMBOLDT COUNTY NEAR ALTON FROM RIVER BAR ROAD TO 0.2 MILE EAST OF VAN DUZEN BRIDGE NO. 04‐0094 AND NEAR BRIDGEVILLE FROM VAN DUZEN BRIDGE NO. 04‐0098 TO 1.7 MI EAST OF LITTLE LARABEE 36 CAPM
HMA OVERLAY AND RUMBLE STRIP 7/3/2015
SHOPP MAJOR
1091 01‐3994U 59V01 175 4.9 $17,854,000.00
IN LAKE & MENDOCINO COUNTIES ON ROUTES 175 AND 29 AT 4 LOCATIONS
LAK‐175 CAPMHMA OVERLAY RECONSTRUCT MBGR
7/3/2015SHOPP MAJOR
1092 01‐41540 MEN 101 74.8 $6,340.00
IN MENDOCINO CO NEAR LAYTONVILLE FROM 5.3 MILES NORTH OF BRANSCOMB ROAD TO RATTLESNAKE CREEK BR#10‐27
LAYTONVILLE NORTH CAPM
PAVEMENT REHAB 9/1/2014
SHOPP MAJOR
1093 01‐42280 HUM 101 102.1 $0.00
NEAR TRINIDAD AT 1.8 KM S OF SEAWOOD DR UC BR #4‐209 (KP 164.3) Stabilize Slide 8/1/2015
SHOPP MINOR B
1094 01‐42510 MEN 128 28 $0.00
IN MENDOCINO COUNTY NEAR BOONVILLE AT THE BOONVILLE MAINTENANCE STATION (KP R45.2) Replace Fence 9/2/2014
SHOPP MINOR B
18
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1095 01‐42630 DN 199 28.2 $0.00
IN DEL NORTE COUNTY NEAR GASQUET AT THE IDLEWILD MAINTENANCE STATION (KP 45.1)
Install Portable Hoist 9/24/2014
SHOPP MINOR B
1096 01‐43060 HUM 254 0.8 $5,500.00
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM OHMAN CREEK BRIDGE #4‐7 TO BEAR CREEK BRIDGE #4‐12
Avenue of the Giants‐Four Bridges Project
REPLACE BRIDGE RAILS AND WIDEN (FOUR BRIDGES) 8/1/2015
SHOPP MAJOR
1097 01‐43170 59V01 254 0 $378,000.00IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS
9 LOCATIONS (101=6; 254=3)
CULVERT REHABILITATION
8/3/2015SHOPP MINOR A
1098 01‐43840 HUM 101 58.8 $16,360.00
IN HUMBOLDT COUNTY IN AND NEAR FORTUNA AT VARIOUS LOCATIONS
Loleta Median Barrier
INSTALL MEDIAN BARRIER 7/3/2015
SHOPP MAJOR
1099 01‐44650 MEN 1 4.5 $0.00
IN MENDOCINO COUNTY IN ANCHOR BAY AT THE INTERSECTION OF OCEAN VIEW DRIVE AND ROUTE 1 (KP 7.2) Downdrain 2/1/2015
SHOPP MINOR B
1100 01‐4500U DN 199 22.7 $4,500.00
IN DEL NORTE COUNTY NEAR PATRICKS CREEK FROM 0.6 MI NORTH OF PATRICK CR RD #316 TO 1.1 MILES NORTH OF SISKIYOU FORK RD
Washington‐Narrows STAA WIDENING 7/15/2015
SHOPP MAJOR
19
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1101 01‐45240 HUM 96 16 $2,442.00
IN HUMBOLDT COUNTY NEAR HOOPA FROM 0.8 MILE SOUTH OF ROCK CHUTE VIADUCT TO 1.9 MILES NORTH OF SIDEHILL VIADUCT Hoopa Bluffs
PLACE HOT MIX ASPHALT OVERLAY 7/3/2015
SHOPP MAJOR
1102 01‐45490 DN 197 3.2 $910.00
IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 MI TO 0.5 MI SOUTH OF RUBY VANDEVENTER COUNTY PARK (PM 3.2/4.0) Ruby 2 WIDENING 8/1/2015
SHOPP MINOR A
1103 01‐45930 MEN 101 64.7 $3,478.00
IN MENDOCINO COUNTY NEAR LAYTONVILLE FROM LONG VALLEY CREEK BRIDGE #10‐0099 TO RAMSEY ROAD
Laytonville Pavement
PAVEMENT REHAB 8/1/2014
SHOPP MAJOR
1104 01‐45940 HUM 96 0 $2,298.00
IN HUMBOLDT COUNTY AT AND NEAR WILLOW CREEK FROM 0.1 MILE NORTH OF BRANNAN MOUNTAIN ROAD TO 4.5 MILES SOUTH OF TISH TANG VIADUCT Hum 96 2R
REHABILITATE PAVEMENT 7/3/2015
SHOPP MAJOR
1105 01‐46290 LAK 29 15 $1,201.00
IN LAKE COUNTY NEAR LOWER LAKE FROM HOFACKER LANE TO 0.4 MILE NORTH OF HOFACKER LANE Rock‐out
WIDEN SHOULDERS 7/3/2015
SHOPP MAJOR
20
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1106 01‐46330 HUM 96 0.6 $672.00
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT THE WILLOW CREEK MAINTENANCE STATION 0.6 MILE NORTH OF THE 96/299 INTERSECTION Grade to Drain
GRADE TO DRAIN AT THE WILLOW CREEK MAINTENANCE STATION 7/3/2015
SHOPP MINOR A
1108 01‐46400 HUM 101 0.2 $4,816.00 IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS MBGR US 101
RECONSTRUCT METAL BEAM GUARD RAIL 7/3/2015
SHOPP MAJOR
1109 01‐46410 DN 101 0 $2,780.00 IN DEL NORTE COUNTY AT VARIOUS LOCATIONS DN MBGR 7/3/2015
SHOPP MAJOR
1110 01‐46440 LAK 20 6.3 $2,874.00 IN LAKE COUNTY AT VARIOUS LOCATIONS
VARious Location MBGR (015 Prog)
METAL BEAM GUARD RAIL 7/3/2015
SHOPP MAJOR
1111 01‐46480 HUM 101 1.1 $6,739.00
IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC
STAA at the Grove
STAA OPERATIONAL IMPROVEMENT PROJECT 4/15/2015
SHOPP MAJOR
1112 01‐46530 DN 101 2.7 $326.00
IN DEL NORTE COUNTY AT KLAMATH FROM 2.4 MILES NORTH OF NB ON NEWTON B DRURY PARKWAY TO NEW HUNTER CREEK ROAD. Klamath TE
CONSTRUCT ROADSIDE PARK 7/1/2015 STIP TE
21
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1113 01‐46580 MEN 1 14.7 $0.00
IN MENDOCINO COUNTY IN AND NEAR POINT ARENA AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MILL STREET TO 0.3 MILE NORTH OF KINNEY ROAD
Pac Coast Bike Trail
PACIFIC COAST BIKE TRAIL 7/3/2015
STIP FULLY FUNDED
1114 01‐46680 LAK 20 10.4 $125.00
IN LAKE COUNTY NEAR NICE FROM 0.1 MI WEST OF UPPER LAKE LUCERNE ROAD TO 0.1 MI RAST OF RECLAMATION ROAD#308 Bloody Island
CONSTRUCT HISTORIC INTERPRETIVE CENTER 7/3/2015 STIP TE
1115 01‐47280 MEN 1 95.2 $676.00
IN MENDOCINO COUNTY NEAR LEGGETT AT VARIOUS LOCATIONS
4 Location ‐ RSP
REPAIR STORM DAMAGE 7/3/2015
Storm Damage
1116 01‐47400 MEN 101 36 $0.00
IN MENDOCINO COUNTY ABOUT 13 KM SOUTH OF WILLITS FROM 0.6 KM NORTH OF BAKERS CREEK ROAD TO 3.6 KM NORTH OF RIDGEWOOD RANCH ROAD
Repair Storm Damage 7/3/2015
Storm Damage
22
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1117 01‐47430 HUM 96 21.8 $622.00
IN HUMBOLDT COUNTY NEAR WEITCHPEC AT 1.2 MI WEST OF KLAMATH RIVER BRIDGE
Hum‐096 ‐ Drainage Failure
CONSTRUCT SOLDIER PILE WALL 7/3/2015
Storm Damage
1118 01‐47490 MEN 1 70.3 $5,474.00
IN MENDOCINO COUNTY NEAR WESTPORT FROM 0.8 MI NORTH OF TEN MILE RIVER BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE Seaside Beach
REPAIR STORM DAMAGE 8/1/2014
Storm Damage
1119 01‐47501 HUM 254 5.8 $1,651.00
IN HUMBOLDT COUNTY NEAR MIRANDA AT 0.5 MILE SOUTH OF POST OFFICE
HUM‐254 Slipouts
CONST SOLDIER PILE RETAINING WALL 8/3/2015
Storm Damage
1120 01‐47502 HUM 254 11 $742.00
IN HUMBOLDT COUNTY NEAR MIRANDA AT 0.2 MILE NORTH OF BRIDGE CREEK
HUM‐254 Slipouts
REPAIR STORM DAMAGE 8/3/2015
Storm Damage
1121 01‐47530 HUM 254 1.1 $350.00
IN HUMBOLDT COUNTY NEAR MIRANDA AT 0.3 MILE SOUTH OF MIRANDA BRIDGE ROAD AND AT 0.4 MILE NORTH OF BRIDGE CREEK BRIDGE
2 Location ‐ Slipouts
RESURFACE ROADWAY 7/1/2015
Storm Damage
23
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1122 01‐47550 HUM 36 23.3 $1,219.00
IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT VARIOUS LOCATIONS FROM 0.6 MILE WEST OF ALDERPOINT ROAD TO 2.9 MILES EAST OF LITTLE LARABE CREEK BRIDGE Hum‐036 Slips
REPAIR STORM DAMAGE 7/3/2015
Storm Damage
1123 01‐47580 HUM 36 39.5 $980.00
IN HUMBOLDT COUNTY NEAR DINSMORE 1.0 MILE WEST OF VAN DUZEN RIVER BRIDGE Matterhorn
CONSTRUCT TIEBACK RETAINING WALL 7/3/2015
Storm Damage
1124 01‐47600 MEN 253 7.7 $0.00
IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 4.2 MILES EAST OF SODA CREEK BRIDGE TO 4.1 MILES WEST OF ROBINSON CREEK BRIDGE
Repair Storm Damage 7/3/2015
Storm Damage
1125 01‐47710 59V01 175 0 $924,000.00
IN MENDOCINO AND LAKE COUNTIES NEAR HOPLAND AT VARIOUS LOCATIONS FROM 4.0 MILES WEST OF THE MEN/LAKE COUNTY LINE TO 0.8 MILE EAST OF THE MEN/LAKE COUNTY LINE
Rt. 175 Storm Repair
RECONSTRUCT HIGHWAY EMBANKMENT REPLACE CULVERTS AND PLACE HMA
7/3/2015Storm Damage
24
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1126 01‐47730 MEN 20 9.4 $0.00
IN MENDOCINO COUNTY NEAR DUNLAP AT 4.5 MILES WEST OF THREE CHOP ROAD AND AT 1.3 MILES EAST OF THREE CHOP ROAD
Repair Storm Damage 7/3/2015
Storm Damage
1127 01‐47770 MEN 101 82 $0.00
IN MENDOCINO COUNTY NEAR LEGGETT AT VARIOUS LOCATIONS FROM 0.5 MI SO OF EMPIRE CAMP REST AREA TO RATTLESNAKE BRIDGE #10‐29.
MEN‐101 Soldier Pile Retaining Wall 7/3/2015
Storm Damage
1128 01‐47780 MEN 101 34.5 $1,512.00
IN MENDOCINO COUNTY NEAR CALPELLA AT 1.9 MILES NORTH OF WEST ROAD OVERCROSSING AND NEAR WILLITS AT 0.2 MILES SOUTH OF HAEHL OC
Reeves Canyon Culvert
REPAIR AND REPLACE CULVERTS 7/3/2015
Storm Damage
1129 01‐47880 HUM 101 75.2 $5,028.00
IN HUMBOLDT COUNTY IN EUREKA ON BROADWAY FROM 0.4 MILE NORTH OF HERRICK AVENUE TO 5TH STREET AND ON 5TH STREET FROM BROADWAY TO "O" ST
Eureka AC Surfacing
GRIND AND REPAVE ASPHALT SURFACING 7/3/2015
SHOPP MAJOR
25
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1130 01‐47920 LAK 29 20.1 $5,072.00
IN LAKE COUNTY ON ROUTE 29 FROM 0.2 MI SOUTH OF JUNCTION ROUTE 53 TO 0.1 MI NORTH OF ROUTE 53 ON ROUTE 53 FROM ROUTE 29 TO 0.1 M SOUTH OF 40TH AVENUE LAK‐29 CAPM
REPLACE OGAC RUMBLE STRIP & RECONSTRUCT MBGR 7/3/2015
SHOPP MAJOR
1131 01‐48050 LAK 20 11.9 $2,933.00
IN LAKE COUNTY NEAR NICE FROM 0.3 MILE WEST TO 0.2 MILE EAST OF LUCERNE CUTOFF
Lak 20 Nice/Lucerne Roundabout
CONSTRUCT ROUNDABOUT 7/3/2015
SHOPP MAJOR
1132 01‐48071 HUM 101 32 $0.00
IN HUMBOLDT COUNTY NEAR WEOTT AT VARIOUS LOCATIONS
Restore Roadway 6/1/2015
Director's Order Project
1133 01‐48210 MEN 20 4.7 $691.00
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM 7.7 MILES TO 4.9 MILES EAST OF ROUTE 1
Gravel Pit Widening ‐ 201.010
CONSTRUCT TIMBER RETAINING WALL 7/3/2015
SHOPP MAJOR
1134 01‐48270 DN 199 18.3 $1,621.00
IN DEL NORTE COUNTY NEAR GASQUET FROM 0.7 MILE SOUTH TO 0.3 MILE SOUTH OF GRASSY FLAT CAMPGROUND
DN 199 Cable Mesh Drape ‐ 201.015
CONSTRUCT CABLE MESH DRAPERY SYSTEM 7/3/2015
SHOPP MAJOR
1135 01‐48590 MEN 1 104.9 $0.00
IN MENDOCINO COUNTY NEAR LEGGETT AT SOUTH FORK EEL RIVER BRIDGE
MEN‐1 Clean & Paint 12/2/2014
MAINTENANCE
26
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1136 01‐48620 59V01 101 0 $1,253,000.00IN MENDOCINO COUNTY ON ROUTE 101 AT VARIOUS LOCATIONS
MEN‐Co Clean & Paint Bridges
CLEAN AND PAINT BRIDGES
6/5/2015MAINTENANCE
1137 01‐48740 HUM 299 29.2 $8,415.00
IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM TITLOW HILL ROAD TO WILLOW CREEK
Hum 299 CAPM
PAVEMENT REHABILITATION 7/1/2015
SHOPP MAJOR
1138 01‐48860 LAK 20 8.1 $3,900.00
IN LAKE COUNTY NEAR UPPER LAKE ON ROUTE 20 FROM 0.3 MILE WEST TO 0.3 MILE EAST OF ROUTE 29 JUNCTION AND ON ROUTE 29 FROM 0.2 MILE SOUTH TO 0.0 MILE SOUTH OF ROUTE 20 JUNCTION
20/29 Roundabout
Improve Intersection 9/15/2014
SHOPP MAJOR
1139 01‐49040 HUM 299 7.2 $370.00 IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS 299 Rumble
PLACE RUMBLE STRIPS 7/3/2015
SHOPP MAJOR
1140 01‐49080 MEN 101 51.9 $321.00
IN MENDOCINO COUNTY NEAR WILLITS FROM .9 MILE NORTH OF OUTLET CREEK BRIDGE T0 1.7 MILES SOUTH OF ARNOLD BRIDGE OVERHEAD
Ryan Creek Safety Project
WIDEN SHOULDER INSTALL RUMBLE STRIP 7/3/2015
SHOPP MAJOR
27
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1141 01‐49121 LAK 29 11.8 $1,496.00
IN LAKE COUNTY ON ROUTE 29 FROM COYOTE CREEK BRIDGE TO 1.2 MILES SOUTH OF JUNCTION ROUTE 53
Bonded Wearing Course
BONDED WEARING COURSE 4/1/2015
MAINTENANCE
1142 01‐49370 HUM 96 11.05 $2,586.00
IN HUMBOLDT COUNTY IN HOOPA FROM LOOP ROAD TO 0.1 MILES WEST OF HOSTLER CREEK BRIDGE #4‐294 Hoopa Safety
SHOULDER WIDENING/LIGHT GUARD CROSSWALK 3/1/2015
SHOPP MAJOR
1143 01‐4939U MEN VAR 8 $2,877.00
IN MENDOCINO COUNTY ON ROUTES 20 & 162 AT VARIOUS LOCATIONS
MEN CO TURNOUTS
CONSTRUCT TURNOUTS 7/1/2015
SHOPP MAJOR
1144 01‐49520 HUM 96 12.4 $0.00
IN HUMBOLDT COUNTY IN HOOPA FROM 0.1 TO 0.4 MILE NORTH OF THE TRINITY RIVER BRIDGE #04‐137
Install Vehicle Speed Feedback Signs 9/1/2014
SHOPP MINOR B
1145 01‐49580 59V01 VAR 0 $500,000.00IN LAKE AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS
Blue Lakes/Longvale Rumble Strips
INSTALL RUMBLE STRIPS
7/3/2015SHOPP MAJOR
1146 01‐49600 HUM 101 121.8 $237.00
IN HUMBOLDT COUNTY NEAR ORICK FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF BALD HILLS ROAD
Bald Hills MBGR
INSTALL METAL BEAM GUARD RAIL 7/3/2015
SHOPP MINOR A
28
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
1147 01‐49660 59V01 VAR 0 $884,000.00IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS
HUM Bridge Deck Repair
BRIDGE DECK REPAIR
11/15/2014MAINTENANCE
1148 01‐49771 MEN 1 2.4 $1,830.00
IN MENDOCINO COUNTY NEAR GUALALA FROM 0.1 TO 2.5 MI NORTH OF BIG GULCH ROAD RD# 543 Big Gulch
PERMANENT RESTORATION 4/1/2015
Storm Damage
1149 01‐49840 HUM 254 12.7 $1,360.00
IN HUMBOLDT COUNTY NEAR MYERS FLAT FROM 0.2 MILE NORTH OF MYERS FLAT ROAD TO SOUTH FORK EEL RIVER BRIDGE Myers Road
HOT MIX ASPHAL OVERLAY 4/15/2015
MAINTENANCE
1150 01‐49870 DN 101 15.5 $2,163.00
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 2.8 MI NORTH OF WILSON CREEK ROAD TO 0.2 MI NORTH OF MILL CREEK PARK ENTRANCE ROAD
Crescent Hill Safety
BONDED WEARING COURSE, REPLACE ASPHALT CONCRETE SURFACING 7/3/2015
SHOPP MAJOR
1151 01‐49880 HUM 101 45.9 $955.00
IN HUMBOLDT COUNTY NEAR STAFFORD FROM JORDAN ROAD UNDERCROSSING TO 0.3 MILE SOUTH OF STAFFORD ROAD UNDERCROSSING SO HUM OGAC
HMA OVERLAY AND RUMBLE STRIP 7/2/2015
Storm Damage
$25,007,094.00 Sum of District 1
29
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2001 02‐0E020 TRI 299 68 $147.00
IN TRINITY COUNTY ABOUT 10 MILES EAST OF DOUGLAS CITY FROM 0.6 TO 0.8 MILE EAST OF TRINITY DAM BOULEVARD
Little Grass Valley Creek
CONSTRUCT FISH LADDER IRDAP #2205 8/5/2014
SHOPP MINOR B
2002 02‐0E090 SHA 5 29.5 $22,961.00
In Shasta County about 8 miles north of Shasta Lake City and near Lakehead at Sidehill Viaduct and at Dog Creek Bridge.
Sidehill & Dog Creek Seismic Retrofit
Bridge replacement and seismic retrofit 8/3/2015
SHOPP MAJOR
2003 02‐0E300 SHA 5 56.7 $0.00
IN SHASTA COUNTY ABOUT 15 MILES NORTH OF LAKEHEAD AT 3.4 MILES NORTH OF GIBSON ROAD OVERCROSSING
Sims Permanent Restoration 7/30/2015
SHOPP MAJOR 480
2004 02‐0E360 TEH 5 10.5 $5,910.00
IN TEHAMA COUNTY NEAR CORNING AT CORNING SAFETY ROADSIDE REST AREA
Corning NB & SB SRRAs
REBUILD N/B & S/B FACILITIES AT CORNING SRRA'S 8/11/2014
SHOPP MAJOR
2005 02‐0E530 TEH 99 12.5 $11,200.00
IN TEHAMA COUNTY AT AND NEAR LOS MOLINOS FROM LOS MOLINOS CREEK BRIDGE TO SALT CREEK BRIDGE Teh‐99 CAPM
PAVEMENT REHABILITATION 12/10/2014
SHOPP MAJOR
30
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2006 02‐0H010 SIS 89 0 $0.00
In Siskiyou County near Bartle from Shasta County Line to 1.0 mile south of Harris Spring Road.
Dead Horse Overlay
Replace AC surfacing 12/3/2014
MAINTENANCE
2007 02‐0H210 59V02 VAR $2,000,000.00
In Lassen, Shasta, Sierra, Siskiyou, and Tehama Counties at various locations.
Highly Reflective Signs
Upgrade signs to retro‐reflective
7/28/2015SHOPP MAJOR
2008 02‐0H220 59V02 005 $0.00
In Shasta and Siskiyou Counties on Route 5 at Lakehead Safetey Roadside Rest Area and at Weed Safety Roadside Rest Area.
Lakehead and Weed SRRA Pavement
Pavement Restoration
10/30/2014MAINTENANCE
2009 02‐1E240 PLU VAR $658,000.00IN PLUMAS COUNTY AT VARIOUS LOCATIONS
PLU 36 & 89 SuperHAR, HAR Flasher, CCTVs
INSTALL FLASHING BEACON, HAR & CCTV
6/1/2015SHOPP MINOR A
60
2010 02‐1E520 VAR VAR $190,000.00
IN SISKIYOU COUNTY NEAR HAMBURG AT VARIOUS LOCATIONS FROM 1.4 MILES WEST OF O'NEIL CREEK CAMPGROUND TO 1.6 MILES EAST OF SCOTT RIVER ROAD
Hamburg Culverts
REPLACE CULVERTS
4/1/2015SHOPP MINOR B
2011 02‐1E610 59V02 299 0 $1,425,000.00IN SHASTA COUNTY AT VARIOUS LOCATIONS.
Shasta Many Bridges
PLACE METHACRYLATE OVERLAY
12/5/2014SHOPP MAJOR
31
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2012 02‐29971 MOD 299 39.3 $2,483.00
IN MODOC COUNTY IN AND NEAR ALTURAS FROM 0.2 MILE WEST OF MILL STREET TO ROUTE 299/395 SEPARATION
Alturas 299 Improvements
Widen shoulders, improve drainage, and install radar feed back signs. 11/21/2014
STIP FULLY FUNDED
2013 02‐2C580 SHA 299 6.9 $3,286.00
IN SHASTA COUNTY ABOUT 8.6 MILES WEST OF WHISKEYTOWN FROM 1.0 MILE TO 0.4 MILE WEST OF CRYSTAL CREEK ROAD
Yankee Gulch Curve Realign REALIGN CURVE 11/6/2014
SHOPP MAJOR 120
2014 02‐2C710 SIS 5 22.3 $3,100.00
IN SISKIYOU COUNTY NEAR WEED FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF SHASTA RIVER BRIDGES
Shasta River Bridges
REPLACE BRIDGE DECK 11/6/2014
SHOPP MAJOR
2015 02‐2E74U SHA 299 83 $0.00
In Shasta County near Burney from 1.0 mile west of Hat Creek Bridge to Hat Creek Bridge.
Hat Creek Curve Combine
Curve Improvement and Truck Lane 9/15/2014
SHOPP MAJOR
2016 02‐2E74U SHA 299 83 $0.00
In Shasta County near Burney from 1.0 mile west of Hat Creek Bridge to Hat Creek Bridge.
Hat Creek Curve Combine
Curve Improvement and Truck Lane 10/16/2014
SHOPP MAJOR 70
32
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2017 02‐2E800 SIS 5 7.2 $5,000.00
IN SISKIYOU COUNTY NEAR DUNSMUIR AT DUNSMUIR GRADE COMMERCIAL VEHICLE ENFORCEMENT FACILTY Dunsmuir CVEF
IMPROVE TRUCK INSPECTION FACILITY 1/16/2015
SHOPP MAJOR 70
2018 02‐2E870 SHA 5 31.1 $319.00
IN SHASTA COUNTY ABOUT 9 MILES NORTH OF SHASTA LAKE CITY AT O'BRIEN SAFETY ROADSIDE REST AREA.
O'Brien SRRA Updated
UPGRADE REST AREA 6/1/2015
SHOPP MINOR A 250
2019 02‐30170 TEH 5 35.1 $5,100.00
IN TEHAMA COUNTY ABOUT 11 KM NORTH OF RED BLUFF FROM 2.0 KM SOUTH TO 1.3 KM NORTH OF NINE MILE OVERCROSSING
Nine Mile Hill Median Lane
CONSTRUCT NORTHBOUND MEDIAN LANE 7/30/2015
SHOPP MAJOR
2020 02‐37100 SHA 5 0.9 $19,543.00
IN SHASTA COUNTY IN AND NEAR ANDERSON FROM FOURTH STREET OVERCROSSING TO DESCHUTES ROAD UNDERCROSSING
Cottonwood Hills Truck Climbing Lanes
ADD NORTHBOUND AND SOUTHBOUND TRUCK CLIMBING LANES 6/10/2015 CMIA
2021 02‐37781 PLU 70 79.1 $3,200.00
IN PLUMAS COUNTY NEAR BECKWOURTH AT THE LESTER T DAVIS SAFETY ROADSIDE REST AREA LT Davis SRRA
REPLACE SAFETY ROADSIDE REST AREA 11/6/2014
SHOPP MAJOR
33
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2022 02‐3E410 SHA 299 0.3 $25,000.00
IN SHASTA COUNTY ABOUT 20 MILES WEST OF REDDING FROM 0.3 MILE EAST OF TRINITY COUNTY LINE TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. BGI Capstone
HIGHWAY REALIGNMENT 9/15/2014
SHOPP MAJOR
2023 02‐3E600 SHA 299 24 $901.00 IN SHASTA COUNTY AT VARIOUS LOCATIONS. RDI 2
WIDEN ROADWAY, OVERHEAD SIGNS 7/24/2015
SHOPP MINOR A 320
2024 02‐3E650 SHA 5 59.35 $3,305.00
IN SISKIYOU AND SHASTA COUNTIES AT VARIOUS LOCATIONS. REHABILITATE BRIDGE DECKS.
Beaucoup Bridges
BRIDGE MAINTENANCE 8/28/2015
SHOPP MAJOR
2025 02‐3E730 SIS 5 68.3 $4,830.00
In Siskiyou County about 19 miles north of Yreka at Hilt Road Overcrossing.
Hilt Rd OC Bridge Replacement Replace Bridge 1/16/2015
SHOPP MAJOR
2026 02‐3E770 TRI 299 36.9 $11,200.00
IN TRINITY COUNTY AT AND NEAR JUNCTION CITY AND WEAVERVILLE FROM NORTH FORK TRINITY RIVER BRIDGE TO 0.1 MILE EAST OF INDUSTRIAL PARKWAY.
West Weaverville CAPM CAPM 5/6/2015
SHOPP MAJOR
34
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2027 02‐3E790 TRI 299 12.3 $3,000.00
IN TRINITY COUNTY NEAR BURNT RANCH FROM 1.4 MILES TO 0.9 MILES WEST OF MILL CREEK ROAD.
Collins Bar Curve Improvement
CURVE IMPROVEMENT 10/1/2014
SHOPP MAJOR
2028 02‐3E800 SHA 273 0 $3,300.00
IN SHASTA COUNTY IN REDDING FROM 0.1 MILE SOUTH OF WYNDHAM LANE TO LINCOLN STREET. MODIFY
Route 273 ADA Project
CONSTRUCT & MODIFY ADA CURB RAMPS. 8/25/2015
SHOPP MAJOR
2029 02‐3E820 TRI 299 36.6 $1,000.00
IN TRINITY COUNTY NEAR HELENA FROM 0.3 MILE TO 0.1 MILE WEST OF NORTH FORK TRINITY RIVER BRIDGE
North Fork Curve
ROADWAY WIDENING, GUARDRAIL REHAB 1/9/2015
SHOPP MINOR A
2030 02‐4E310 TRI 299 45.9 $945.00
In Trinity County about 6 miles west of Weaverville from 1.6 miles to 1.3 miles west of Castle Road
Poison Pond Curve Improvement
Increase pavement width to meet STAA Requirements. 3/25/2015
SHOPP MINOR A
2031 02‐4E340 LAS 147 0.5 $1,000.00
IN LASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK DRIVE Clear Creek 3R
ROADWAY REHABILITATION 7/1/2015
SHOPP MINOR A
35
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2032 02‐4E430 SHA 44 4.2 $4,980.00
In Shasta County at and near Palo Cedro from 0.1 mile west of Stillwater Creek Bridge to 0.1 mile east of Bear Creek Bridge.
Palo Cedro CAPM
Pavement Rehabilitation. 8/25/2014
SHOPP MAJOR 35
2033 02‐4E440 MOD 139 10.7 $14,300.00
IN MODOC COUNTY ABOUT 17 MILES SOUTH OF NEWELL FROM 0.1 MILE NORTH OF BOLES ROAD TO 0.1 MILE SOUTH OF PEREZ ROAD.
Perez Pavement Rehab 2R
Pavement Rehabilation 6/19/2015
SHOPP MAJOR 45
2034 02‐4E520 SHA 44 21 $750.00
IN SHASTA COUNTY ABOUT 6 MILES WEST OF SHINGLETOWN FROM 0.2 MILE WEST TO 0.3 MILE EAST OF BLACK BUTTE ROAD.
Black Butte Rd LTL
INSTALL LEFT TURN LANE 10/1/2014
SHOPP MINOR A 65
2035 02‐4E600 TRI 3 30.86 $778.00
IN TRINITY COUNTY AT WEAVERVILLE FROM ROUTE 299 TO 0.1 MILE NORTH OF CENTER STREET.
Weaverville Elementary School Sidewalks
INSTALL SIDEWALKS 9/1/2014
SHOPP MINOR A
2036 02‐4E640 PLU 147 8.91 $5,690.00
In Plumas County about 9 miles north of Canyon Dam from 0.1 mile south to 0.4 mile north of Hamilton Branch Bridge.
Hamilton Branch Bridge Replacement
REPLACE BRIDGE 7/13/2015
SHOPP MAJOR
36
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2037 02‐4E670 SIS 5 58 $3,300.00
IN SISKIYOU COUNTY NEAR HORNBROOK AT COLLIER SAFETY ROADSIDE REST AREA. Collier SRRA 7/10/2015
SHOPP MAJOR
2038 02‐4E690 LAS 395 49.5 $2,300.00
IN LASSEN COUNTY NEAR JANESVILLE AT HONEY LAKE SAFETY ROADSIDE REST AREA.
Honey Lake SRRA Sewer/Water Restoration
REHABILITATE WATER AND SEWER SYSTEMS 3/15/2015
SHOPP MAJOR
2039 02‐4E790 SHA 5 10.7 $1,200.00
In Shasta County in and near Redding from 0.1 mile south of Smith Road Overcrossing to 0.1 mile north of East Redding Separation. I‐5 OH Signs
Replace overhead signs 12/1/2014
SHOPP MAJOR 180
2040 02‐4E811 59V02 VAR $2,640,000.00In Plumas, Siskiyou and Trinity Counties at various locations.
Phase 1 Worker Safety
Widen, pave and install lighting at chain control locations.
10/8/2014SHOPP MAJOR
2041 02‐4E812 59V02 VAR $3,300,000.00In Butte, Lassen, Plumans and Shasta Counties at various locations.
Phase 2 Workers Safety
Widen, pave and lighting at chain control locations
2/2/2015SHOPP MAJOR
2042 02‐4E870 TEH 36 82.2 $250.00
In Tehama county at the Mineral Maintenance Station.
Mineral Maint Station Water System
Upgrade water system 5/1/2015
SHOPP MINOR B
37
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2043 02‐4E890 SHA 299 47.5 $1,650.00
IN SHASTA COUNTY NEAR INGOT FROM 5.0 MILES TO 4.3 MILES WEST OF BUZZARD ROOST ROAD.
McCandless Gulch Curve Improv
CURVE IMPROVEMENT 5/1/2015
SHOPP MAJOR
2044 02‐4E90U TEH 32 5.1 $3,548.00
In Tehama County about 18 miles east of Forest Ranch from 1.6 to 2.9 miles east of Soda Springs Road.
Combined Smokey Creek
Curve Improvement and Truck Lane 8/7/2014
SHOPP MAJOR 20
2045 02‐4E940 TEH 99 17.6 $203.00
IN TEHAMA COUNTY NEAR DAIRYVILLE FROM 65TH AVENUE TO ANTELOPE CREEK BRIDGE.
Lassen View Sch Flashing Beacons
INSTALL FLASHING BEACONS. 8/14/2015
SHOPP MINOR B
2046 02‐4F290 SHA 44 59 $1,757.00
In Shasta County near Old Station from 0.6 mile west of Sugar Loaf Drive to Sugar Loaf Drive.
Big Springs Curve Improvement
Curve Improvement 6/19/2015
SHOPP MAJOR
2047 02‐4F390 PLU 147 7.5 $1,000.00
IN PLUMAS COUNTY ABOUT 7 MILES NORTH OF CANYON DAM FROM 0.1 MILE NORTH OF COUNTY ROAD A‐13 TO HAMILTON BRANCH BRIDGE.
Hamilton Branch Paving
Roadway Rehabilitation 10/1/2014
SHOPP MINOR A 60
2048 02‐4F420 LAS 36 26.6 $0.00 Skyline Extension 2/27/2015
Local Capital Outlay 35
38
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2049 02‐4F610 59V02 005 0 $4,400,000.00
In Shasta and Siskiyou Counties on Route 5 from Hartnell Avenue Overcrossing to Gibson Road Overcrossing and on Route 5 from Siskiyou Road Overcrossing to Bailey Hill Road Overcrossing.
Sha OCD Rehab
Remove existing AC, repair unsound concrete, place polyester concrete overlays and repair joint seals.
2/2/2015SHOPP MAJOR
105
2050 02‐4F630 TRI 3 26.15 $373.00
IN TRINITY COUNTY ABOUT 10 MILES SOUTH OF DOUGLAS CITY AT 0.1 MILE SOUTH OF BROWNS CREEK BRIDGE.
Trinity 3 slope repair Slope Repair 1/28/2015
SHOPP MINOR A
2051 02‐4F710 TEH 5 24.8 $1,154.00
IN TEHAMA COUNTY IN RED BLUFF FROM 0.6 MILE SOUTH TO 1.3 MILES NORTH OF SACRAMENTO RIVER BRIDGE 08‐0095.
Red Bluff Ramps 6/24/2015
SHOPP MINOR A
2052 02‐4F720 TRI 299 3.7 $500.00
IN TRINITY COUNTY NEAR SALYER FROM 0.1 MILE EAST TO 0.7 MILE EAST OF SALYER SAFETY ROADSIDE REST AREA.
Hennessy Ridge Shoulder Widening
Widen Shoulders 3/18/2015
SHOPP MINOR B
39
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2053 02‐4F740 TRI 299 19.2 $408.00
In Trinity County near Del Loma from 0.3 mile west of Swede Creek Road to Swede Creek Road. Swede Drapery
Construct Drapery 8/18/2014
SHOPP MINOR A
2054 02‐4G00U SIS 97 2.1 $0.00
In Siskiyou County near Weed from Angel Valley Road to Maple Avenue.
Angel Maple Combined
Widen Shoulders 11/26/2014
STIP FULLY FUNDED 30
2055 02‐4G120 TRI VAR $3,105,000.00
In Trinity County near Peanut on route 3 from Route 36 to 0.1 mile north of Route 36 and on Route 36 from 0.2 mile west of Route 3 to Shasta County Line.
WildwoodThin Blanket, SAMI and Digouts
12/17/2014MAINTENANCE
2056 02‐4G140 LAS 395 24.7 $2,114.00
In Lassen County near Doyle from Willow Ranch Creek Bridge to 2.9 miles south of Milford Grade Road.
Milford Place HMA
Place HMA, replace AC surfacing 4/6/2015
MAINTENANCE
2057 02‐4G300 SIS 5 58 $175.00
In Siskiyou County about 8 miles north of Yreka at 0.1 mile south of Klamath River Road Undercrossing.
Collier SRRA Break Room
Construct Break Room 7/3/2015
SHOPP MINOR B
2058 02‐4G310 SHA 5 5.9 $90.00
In Shasta County in and near Anderson Tormey Drain Bridge to 0.1 mile south of Riverside Avenue Overcrossing.
Tormey Drain to Riverside Fence
Right of Way fence repair and replacement 12/1/2014
MAINTENANCE
40
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2059 02‐4G330 TEH 32 21.5 $1,000.00
In Tehama County about 15 miles east of Froest Ranch from Deer Creek Bridge to Route 36.
Deer Creek CAPM CAPM 7/15/2015
SHOPP MINOR A 10
2060 02‐4G340 MOD 299 14.7 $2,975.00
In Modoc County near Canby from 3.3 miles west to 2.1 miles east of Pit River Bridge.
Adin Pass Phase 2
Cold In‐Place Recycle 12/10/2014
MAINTENANCE 40
2061 02‐4G360 TRI 299 56.9 $270.00
In Trinity County near Douglas City at Moon Lim Lee Safety Roadside Rest Area.
Moon Lim Lee Rehab
Rebabiliate restroom interior, upgrade electrical lighting, install pre‐fab auxillary restrooms and sidewalks. 9/30/2014
SHOPP MINOR B
2062 02‐4G450 BUT 70 42.1 $0.00
In Butte County near Pulga at Pulga Maintenance Station.
Pulga Material Bins
Construct concrete material storage bins. 10/15/2014
MAINTENANCE 30
2063 02‐4G460 SIS 5 45.7 $0.00 Storage covers 9/1/2014MAINTENANCE
2064 02‐4G470 59V02 VAR $0.00In Lassen, Siskiyou and Trinity Counties at various locations.
Guardrail Replacement
Replace guardrail
2/10/2015MAINTENANCE
41
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2065 02‐4G480 SHA 299 18.4 $1,750.00
In Shasta County at Shasta from 0.1 mile west of French Alley to Red Bluff Road. Shasta ADA
Construct Sidewalks 11/5/2014
SHOPP MAJOR
2066 02‐4G490 SHA 44 45.1 $1,550.00
In Shasta County near Viola from 1.5 miles to 1.1 miles west of North Battle Creek Reservior Road.
Lower Manzanita
Curve Improvement 8/24/2015
SHOPP MAJOR 80
2068 02‐4G730 59V02 VAR $0.00In Shasta and Tehama Counties at various locations.
Bridge Maintenance SHA TEH
Bridge Maintenance
5/6/2015MAINTENANCE
2069 02‐4G820 SIS 5 11.4 $34,838.00
In Siskiyou County in and near Weed from 0.7 mile south of Mount Shasta Underpass to 0.1 mile north of Route 97.
South Weed 2R
Roadway Rehabilitation 6/19/2015
SHOPP MAJOR
2070 02‐4G960 PLU 89 16.4 $0.00
In Plumas County near Cresent Mills from 0.2 mile south of Stampfi Lane to 0.1 mile north of south Greenville Overhead.
Place AC surfacing
Place HMA, replace AC surfacing 10/8/2014
MAINTENANCE
2071 02‐4G970 SIS 3 7 $0.00
In Siskiyou County in and near Etna from 0.1 mile south of Gazelle‐Gallagan road to 0.6 mile south of Holzhauser Lane.
Seal coat, replace AC surfacing
Seal Coat, replace AC surfacing 3/2/2015
MAINTENANCE
42
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
2072 02‐4G980 SIS 97 17 $0.00
In Siskiyou County about 17 miles north of Weed from 0.4 mile north of Deer Mountain Raod to 2.2 miles north of Grass Lake Safety Roadside Rest Area
Grass Lake Gap Overlay
Cold Plane and place HMA 10/29/2014
MAINTENANCE
2073 02‐4G990 LAS 395 133 $0.00
In Lassen County near Madeline from 3.8 miles north of Ash Valley Road to Modoc County Line.
Replace AC surfacing
Place HMA, replace AC surfacing 3/30/2015
MAINTENANCE
$17,943,633.00
3001 03‐0A360 SAC 5 22.6 $55,358.00
IN SACRAMENTO COUNTY IN SACRAMENTO FROM 0.6 KM SOUTH OF ROUTE 5/50 SEPARATION TO RICHARDS BOULEVARD UNDERCROSSING Boat Section
REHABILITATE STRUCTURE 8/1/2014
SHOPP MAJOR
3002 03‐0A410 PLA 49 3.2 $5,820.00
IN PLACER COUNTY IN AUBURN FROM FULWEILER AVENUE TO WILLOW CREEK AVENUE
PLA‐049 WIDEN ROADWAY
WIDEN ROADWAY 7/2/2015
STIP FULLY FUNDED
3003 03‐0A600 PLA 80 14.3 $45,620.00
IN PLACER COUNTY IN AND NEAR AUBURN AT VARIOUS LOCATIONS
AUBURN REHAB
ROADWAY REHABILITATION 7/1/2015
SHOPP MAJOR
Sum of Disrtrict 2
43
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3004 03‐0A650 BUT 70 28.8 $6,500.00
IN BUTTE COUNTY AT AND NEAR JARBO GAP FROM WEST BRANCH SIDEHILL VIADUCT TO NORTH FORK FEATHER RIVER BRIDGE OVERLAY
HMA OVERLAY, COLD PLANE, MBGR 8/3/2015
SHOPP MAJOR
3005 03‐0A710 YUB 70 16.4 $5,000.00
IN YUBA COUNTY FROM 0.1 MI NORTH OF SIMMERLY SLOUGH BRIDGE TO 0.1 MI S OF NOBLE ROAD AND FROM NORTH OF WOODRUFF LANE TO YUBA/BUTTE CO LINE
Yub‐70 Cold Foam
ASPHALT CONCRETE OVERLAY 8/1/2014
SHOPP MAJOR
3006 03‐0A800 SAC 50 2.6 $11,900.00
IN SACRAMENTO COUNTY FROM 65TH ST UNDERCROSSING TO 0.1 MILE EAST OF WATT AVE OVERCROSSING AND 0.2 MILES WEST OF SUNRISE BOULEVARD
65th St to Sunrise CAPM
GRIND PAVEMENT AND REPLACE SLAB 8/15/2015
SHOPP MAJOR
3007 03‐0C720 NEV 80 17.3 $721.00
IN NEVADA COUNTY FROM 1 MILE EAST OF THE ROUTE 80/89 SEPARATION TO UNION MILLS BRIDGE OVERHEAD
Nev‐80 W Boca Water Qty 0C7203 [03*17]
STORM WATER MANAGEMENT 8/1/2015
SHOPP MAJOR
44
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3008 03‐0E080 YUB 70 13.6 $1,437.00
IN YUBA COUNTY IN AND NEAR MARYSVILLE FROM 0.4 MILE NORTH OF SOUTH MARYSVILLE UNDERCROSSING TO 0.1 MILE SOUTH OF 3RD STREET
E Street Bridge Rehab
REHABILITATE BRIDGE DECK 11/2/2014
SHOPP MAJOR
3009 03‐0E960 ED 49 11.7 $3,000.00
NEAR PLACERVILLE FROM PLEASANT VALLEY ROAD TO BRADLEY DRIVE (KP 18.8/20.0)
Diamond Springs Parkway
REALIGN AND REDESIGNATE ROADWAY 4/1/2015
STIP Local Delivery
3010 03‐0F210 BUT 99 0 $1,200.00
AT VARIOUS LOCATIONS IN SUTTER, BUTTE, COLUSA, YUBA, PLACER AND EL DORADO COUNTIES
Upgrade MBGR
UPGRADE MBGR END TREATMENTS AND BRIDGE APPROACH RAIL 7/2/2015
SHOPP MAJOR
3011 03‐0F270 YUB 65 2.2 $2,963.00 NEAR WHEATLAND AT DRY CREEK BRIDGE 16‐2
Scour Structure Rehab
BRIDGE SCOUR MITIGATION 10/15/2014
SHOPP MAJOR
3012 03‐0F370 GLE 5 24.82 $6,715.00
ABOUT 14 MILES NORTH OF WILLOWS AT COUNTY ROAD 16 OVERCROSSING, COUNTY ROAD 7 OVERCROSSING, AND COUNTY ROAD 3 OVERCROSSING
Glenn 5 ‐ Lower Roadway Profile
LOWER ROADWAY PROFILE TO IMPROVE VERTICAL CLEARANCE 8/1/2015
SHOPP MAJOR
45
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3013 03‐0F690 BUT 70 24 $3,418.00
ABOUT 9.5 MILES EAST OF OROVILLE AT FLAG CANYON CREEK BRIDGE 12‐140
Flag Canyon Bridge
REPLACE BRIDGE 8/13/2014
SHOPP MAJOR 150
3014 03‐0F710 SAC 275 0.1 $80.00 NEAR WEST SACRAMENTO AT THE TOWER BRIDGE No Nick
UPGRADE CCTV AND MONITORS 12/1/2014
SHOPP MINOR B
3015 03‐0G000 NEV 80 15.66 $1,500.00 In Truckee at Keiser Avenue TBD
Install equipment wash rack 1/1/2015
MAINTENANCE
3016 03‐0G010 ED 89 8.2 $1,500.00 Near South Lake Tahoe at Cornelian Drive TBD
Install equipment wash rack 6/1/2015
MAINTENANCE
3017 03‐0G030 59V03 VAR 0 $2,827,000.00In El Dorado and Placer Counties at various locations
Bridge Deck
Bridge deck rehabilitation work at 17 locations
1/8/2015SHOPP MAJOR
3018 03‐0G050 YOL VAR 0 $2,515,000.00In Yolo County at various locations
Yol 5/113 Br Deck Var 0G050 [0314*29]
Place bridge deck preventative maintenance polyester and methacrylate overlay deck treatments on 15 bridges
7/2/2015SHOPP MAJOR
95
3019 03‐0G090 YUB 49 0 $2,800.00
About 5.8 miles south of Nevada City from the Nevada County Line to the Sierra County line
Bonded wearing course
Bonded Wearing Course 2/1/2015
MAINTENANCE
46
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3020 03‐0G100 SIE 89 19.9 $1,800.00 Near Truckee from Route 49 to Plumas County line Digout Digouts 6/1/2015
MAINTENANCE
3021 03‐0G110 BUT 32 19 $2,800.00
About 8 miles east of Chico from LaCosanta Drive to Nopel Avenue Overlay CIR with overlay 2/1/2015
MAINTENANCE
3022 03‐0G130 ED 49 0 $2,900.00
Near Placerville from Amador County Line to Pleasant Valley Road Overlay
Bonded Wearing course overlay 6/1/2015
MAINTENANCE
3023 03‐0G140 YOL 16 0 $1,900.00
In Yolo County from Colusa County Line to County Road 78 Chip Seal PME chip seal 2/1/2015
MAINTENANCE
3024 03‐0G150 NEV 49 0 $3,800.00
IN AND NEAR GRASS VALLEY FROM THE PLACER COUNTY LINE TO ROUTE 20/49 SEPARATION BRIDGE 17‐0049 RAC overlay RAC OVERLAY 6/1/2015
MAINTENANCE
3025 03‐0G160 YOL 16 31.7 $2,200.00
NEAR WOODLAND FROM 0.1 MILE WEST OF 505/16 SEPARATION BRIDGE 22‐111 TO PEDRICK ROAD RAC Overlay RAC OVERLAY 12/1/2014
MAINTENANCE
3026 03‐0G170 PLA 28 0 $1,500.00
At and near Tahoe City from Route 89 to the Nevada State Line Microsurfacing Microsurfacing 6/1/2015
MAINTENANCE
47
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3027 03‐0G180 YOL 128 7.8 $1,600.00
IN WINTERS FROM TAYLOR STREET TO 3 MILES EAST OF ROUTE 505 SEPERATION BRIDGE 22‐110 Microsurfacing
MICROSURFACING 1/1/2015
MAINTENANCE
3028 03‐0G190 SAC 104 4.65 $1,600.00
IN SACRAMENTO COUNTY FROM 0.1 MILE WEST OF MARENGO ROAD TO AMADOR COUNTY LINE
chip seal SAC‐104
HOT APPLIED CHIP SEAL 6/1/2015
MAINTENANCE
3029 03‐0G210 SAC 99 16 $1,800.00
In Elk Grove from Calvine Road Overcrossing north to Elder Creek Road RC Overlay RAS overlay 2/1/2015
MAINTENANCE
3030 03‐0G250 SAC 50 0.43 $24.00 West Sacramento Maintenance Station
Nickname Required
Install powered controlled access security gate 1/2/2015
MAINTENANCE
3031 03‐0G260 BUT 162 0 $4,000.00
In Butte County from the Glenn County Line to Junction Route 99 BUT 162 CIR
Cold in‐place recycle 2/1/2015
MAINTENANCE
3032 03‐1A431 SUT 99 8.1 $11,400.00
IN SUTTER COUNTY NEAR NICOLAUS FROM 0.9 KM SOUTH OF STRIPLIN ROAD TO 0.3 KM SOUTH OF GARDEN HIGHWAY UNDERCROSSING
Sut 99 Segment 1
WIDEN HIGHWAY 11/1/2014
STIP FULLY FUNDED
48
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3033 03‐1A842 ED 89 8.6 $13,717.00
IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD
EIP ‐ Route 50 to Cascade Rd
STORM WATER QUALITY IMPROVEMENTS O/L, ADD DIKES AND RETENTION BASINS 9/30/2014
SHOPP MAJOR
3034 03‐1A843 ED 89 13.8 $13,328.00
NEAR SOUTH LAKE TAHOE FROM CASCADE ROAD TO UPPER EMERALD BAY ROAD Emerald Bay
STORM WATER QUALITY IMPROVEMENTS O/L, WIDEN, ADD DIKES & RET BASINS 1/15/2015
SHOPP MAJOR 220
3035 03‐1A845 ED 89 24.9 $8,400.00
NEAR TAHOMA FROM MEEKS CREEK BRIDGE TO WILSOM AVENUE. STORM WATER MITIGATION Tahoma
STORM WATER QUALITY IMPROVEMENTS 10/1/2014
SHOPP MAJOR
3036 03‐1A910 SUT 99 28.2 $14,729.00
IN SUTTER COUNTY IN AND NEAR YUBA CITY AT VARIOUS LOCATIONS
Sut‐99/Pavement Rehab.
PAVEMENT REHABILITATION 8/1/2015
SHOPP MAJOR
3037 03‐1C080 NEV 89 0.1 $5,300.00
IN TRUCKEE, AT DONNER CREEK UNDERPASS #17‐16 (AKA MOUSEHOLE PROJECT)
Mousehole ‐ Oversight
Construct pedestrian bike tunnel 8/1/2014
STIP Local Delivery
49
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3038 03‐1C210 SAC 5 23.2 $28,906.00
IN SACRAMENTO ON INTERSTATE 5 BETWEEN L STREET AND O STREET
River Front Reconnection 5/1/2015
Local Capital Outlay
3039 03‐1C211 SAC 5 23.25 $0.00 At Capitol Mall and Second Street
River Front Reconnection
new traffic signal on Capitol Mall. At Second Street, build new sidewalks and add class 2 bicycle paths 4/1/2015
Local Capital Outlay
3040 03‐1E041 59V03 050 0 $40,000,000.00
IN YOLO COUNTY ON ROUTE 80 FROM .01 MI WEST OF ENTERPRISE BOULEVARD TO 0.4 MI WEST OF 80/50 SEPARATION AND ON ROUTE 50 FROM 50/80 TO WATT AVENUE.
SAC 50 Concrete Median Barrier Rail Upgrade
CONCRETE MEDIAN BARRIER AND OVERHEAD SIGNS
10/1/2014SHOPP MAJOR
3041 03‐1E130 59V03 005 0 $2,927,000.00
IN COLUSA, GLENN AND YOLO COUNTIES ON ROUTES 5 AND 505 AT VARIOUS LOCATIONS
No nickUPGRADE METAL BEAM GUARD RAIL
7/1/2015SHOPP MAJOR
50
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3042 03‐1E491 BUT 32 10.1 $5,000.00
In Butte County, in Chico, on State Route 32 from 0.1 mile West of State Route 99 to 0.3 mile east of State Route 99
SR32 Widening Phase 2
WIDEN HIGHWAY, PHASE 2 4/1/2015
Local Capital Outlay
3043 03‐1F040 NEV 20 16.7 $270.00
IN NEVADA CITY FROM SACRAMENTO STREET OVERCROSSING TO UREN STREET AT JUNCTION ROUTE 49 NORTH No Nick
INSTALL PUMPHOUSE AND IRRIGATION CONTROLLERS 11/1/2014
SHOPP MINOR B
3044 03‐1F250 SAC 50 7 $250.00 IN SACRAMENTO COUNTY AT VARIOUS LOCATIONS
Install guardrail VARious locations SH 5,50,99,160
INSTALL OUTER GUARDRAIL 12/1/2014
SHOPP MINOR B
3045 03‐1F260 SIE 89 0 $2,055.00
IN SIERRA COUNTY NEAR SIERRAVILLE FROM 0.8 MILE NORTH OF NEVADA COUNTY LINE TO 1.4 MILES NORTH OF NEVADA COUNTY LINE
Two Wildlife Undercrossings
CONSTRUCT TWO WILDLIFE UNDERCROSSINGS AND WILDLIFE BARRIERS 10/1/2014
STIP FULLY FUNDED
3046 03‐1F280 GLE 5 0 $626.00
IN GLENN COUNTY ON ROUTE 5 AT VARIOUS INTERCHANGE LOCATIONS FROM COLUSA COUNTY LINE TO TEHEMA COUNTY LINE
GLEN‐5 Native Planting
NATIVE PLANTING 8/18/2014
STIP FULLY FUNDED
51
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3047 03‐1F290 COL 5 0 $626.00
IN COLUSA COUNTY ON ROUTE 5 FROM YOLO COUNTY LINE TO GLENN COUNTY LINE
COL‐5 Native Planting
NATIVE PLANTING 8/18/2014
STIP FULLY FUNDED
3048 03‐1F360 PLA 80 16.8 $6,000.00
IN PLACER COUNTY IN AND NEAR AUBURN FROM OPHIR ROAD UNDERCROSSING TO 0.1 MILE EAST OF RUSSELL ROAD OVERCROSSILNG
Downtown Auburn
PLACE HOT MIX ASPHALT 7/2/2015
SHOPP MAJOR
3049 03‐1F370 VAR 99 35.6 $9,800.00
IN BUTTE AND SUTTER COUNTIES AT VARIOUS LOCATIONS
SUT‐99 Pavement Rehab
PLACE HOT MIX ASPHALT 3/6/2015
SHOPP MAJOR
3050 03‐1F400 PLA 80 35.1 $35,900.00
NEAR COLFAX FROM LONG RAVINE UNDERPASS TO 0.2 MILE EAST OF MAGRA ROAD OVERCROSSING
I‐80 3 Mile Truck Climbing Lane
WIDENING EASTBOUND ROADWAY 6/16/2015
SHOPP MAJOR
3051 03‐1F420 BUT 99 40.6 $3,386.00 Near Chico at the Rock Creek Bridge #12‐27
Rock Creek Bridge ‐ Shoulder Widening (12‐27)
SHOULDER WIDENING ON STRUCTURE 10/17/2014
SHOPP MAJOR
52
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3052 03‐1F460 YUB 70 7 $15,000.00
IN YUBA COUNTY AT OLIVEHURST AND LINDA FROM 0.3 MILE WEST OF MCGOWAN PARKWAY OVERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD
YUB‐70 Rehab and Recycle Roadway
REHABILITATE ROADWAY 3/15/2015
SHOPP MAJOR
3053 03‐1F490 SIE 89 15.6 $130.00
NEAR SIERRAVILLE FROM 0.5 MILE NORTH OF JUNCTION STATE ROUTE 49 NORTH TO 0.1 MILE NORTH OF LOOKOUT ROAD No Nick
REPLACE CULVERTS 2/1/2015
SHOPP MINOR B
3054 03‐1F580 PLA 89 12.1 $1,350.00
ABOUT 9.3 MILES SOUTH OF TRUCKEE AT ALPINE MEADOWS ROAD
Pla 89, Alpine Meadows Intersection Traffic Signal (Minor A FCO)
CONSTRUCT SIGNALIZED INTERSECTION 7/1/2015
Local Capital Outlay
3055 03‐1F810 SUT 113 0 $16,400.00
IN SUTTER COUNTY NEAR KNIGHTS LANDING FROM CRANMORE/KNIGHTS ROAD 0.1 MILE NORTH OF RIGGINS ROAD TO SACRAMENTO VALLEY BLVD
SUT‐113 Pavement Overlay
PAVEMENT REHABILITATION AND OVERLAY 2/15/2015
SHOPP MAJOR
53
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3056 03‐1F820 YUB 20 3.5 $3,033.00
IN YUBA COUNTY NEAR MARYSVILLE FROM 0.1 MILE EAST OF LEVEE ROAD TO 0.1 MILE EAST OF LOMA RICA ROAD Yuba 20 CAP M
PAVEMENT REHABILITATION AND OVERLAY 1/15/2015
SHOPP MAJOR
3057 03‐1F920 59V03 020 12.3 $2,227,000.00
IN NEVADA, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS
Upgrade Guardrail and Crash Cushions
INSTALL CRASH CUSHIONS/GUARD RAILS
12/1/2014SHOPP MAJOR
3058 03‐1F940 ED 50 51 $0.00
NEAR KYBURZ FROM 0.5 MILE EAST OF 34 MILESTONE ROAD TO 0.4 MILE WEST OF 36 MILESTONE ROAD
drainage improvement 2/1/2015
SHOPP MINOR B
3059 03‐2E120 SAC 99 17.7 $5,900.00
IN SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM MACK ROAD OVERCROSSING TO 1.1 KM NORTH OF FLORIN ROAD OVERCROSSING
Go California Re‐Stripe SAC 99
WIDEN EXISTING HIGHWAY 8/1/2015
SHOPP MAJOR
3060 03‐2E900 59V03 080 0 $2,700,000.00IN NEVADA, SACRAMENTO AND SUTTER COUNTIES AT VARIOUS LOCATIONS
Four County OGAC
PLACE OPEN GRADED ASPHALT CONCRETE
9/15/2014SHOPP MAJOR
3061 03‐2F000 59V03 VAR 0 $7,000,000.00
IN BUTTE,COLUSA,GLENN,SACRAMENTO, SUTTER, YOLO, AND YUBA COUNTIES AT VARIOUS LOCATIONS
COL 20 Upgrade G.R.
UPGRADE GUARDRAIL END TREATMENTS
10/1/2014SHOPP MAJOR
54
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3062 03‐2F030 PLA 80 5.1 $9,200.00
IN PLACER COUNTY 1.0 MILE EAST OF ROUTE 65/80 SEPARATION TO 0.2 MILE EAST OF ROUTE 193/80 SEPARATION
Rocklin to Newcastle CAPM
PAVEMENT REHAB AND OVERLAY 7/2/2015
SHOPP MAJOR
3063 03‐2F040 SAC 80 12.5 $7,500.00
IN AND NEAR CITRUS HEIGHTS ON ROUTE 80 BETWEEN MADISON AVENUE OVERCROSSING AND 0.3 MILES WEST OF SOUTH ROSEVILLE OVERCROSSING AND ROUTE 244
Sac‐80 Grinding
GRIND PAVEMENT, REPLACE PCC SLABS 3/15/2015
SHOPP MAJOR
3064 03‐2F180 COL 5 0 $193.00
IN COLUSA, GLEN, AND YOLO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS No Nick
INSTALLATION OF DELINEATORS 6/6/2015
SHOPP MINOR B
3065 03‐2F290 PLA 267 0 $4,000.00
NEAR TRUCKEE FROM NEVADA COUNTY LINE TO BROCKWAY SUMMIT
PLA 267 Rehab(CAPM)
PAVEMENT REHAB AND WIDEN SHOULDERS 9/1/2014
SHOPP MAJOR
3066 03‐2F330 BUT 99 30.1 $8,206.00
IN CHICO FROM 0.5 MILE SOUTH OF SKYWAY OVERCROSSING TO 0.1 MILE NORTH OF ESPLANADE Grind PCC
REHABILITATE PCC AND ON/OFF RAMPS 5/15/2015
SHOPP MAJOR 75
55
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3067 03‐2F380 ED 50 17.1 $200.00
IN PLACERVILLE AT PLACERVILLE DRIVE AND EASTBOUND ONRAMP TO ROUTE 050 No Nick
REDUCE EARTHEN BERM 12/1/2014
SHOPP MINOR B
3068 03‐2F400 ED 49 20.3 $200.00
ABOUT 4.7 MILES NORTH OF PLACERVILLE AT 2.5 MILE SOUTH OF JUNCTION RT 153 WEST No Nick
INSTALL UNDERGROUND PIPES 12/1/2014
SHOPP MINOR B
3069 03‐2F410 ED 49 33.46 $147.00
ABOUT 8 MILES NORTH OF AUBURN AT CAVE VALLEY ROAD
Construct Turn lane
CONSTRUCT SOUTHBOUND RIGHT TURN LANE 5/15/2015
SHOPP MINOR B
3070 03‐2F580 SIE 89 0 $6,000.00
IN SIERRA COUNTY AT SIERRAVILLE FROM NEVADA COUNTY LINE TO THE SOUTH JUNCTION OF ROUTE 49
Nevada/Sierra HMA Overlay
COLD IN PLACE RECYCLE, HMA OVERLAY MBGR 3/1/2015
SHOPP MAJOR
3071 03‐2F600 ED 49 14.89 $800.00
IN PLACERVILLE AT COLOMA STREET AND AT ROUTE 50
Placer 49/50, in Placerville, Upgdrade Pedestrian Facilities
ADA CURB RAM, RIGHT TURN LANE 3/2/2015
SHOPP MAJOR
3072 03‐2F630 SAC 5 32.54 $1,400.00
NEAR SACRAMENTO AT THE NORTHBOUND OFFRAMP TO AIRPORT BOULEVARD
Sac I‐5 & Airport Blvd NB off‐ramp, Lengthen Decelation Lane
CREATE A LONGER DECELERATION LANE 6/1/2015
SHOPP MAJOR
56
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3073 03‐2F810 PLA 65 7.9 $130.00
IN AND NEAR ROSEVILLE AT BLUE OAKS BOULEVARD OVERCROSSING ONRAMPS No Nick
INSTALL RAMP METERS 12/1/2014
SHOPP MINOR B
3074 03‐2F950 PLA 89 2.2 $1,050.00
IN PLACER COUNTY ON ROUTE 89 FROM FAWN STREET TO CHERRY STREET
Homewood Bike Path
CONSTRUCT NEW CLASS 1 BICYCLE PATH 8/15/2014
Local Capital Outlay
3075 03‐2F990 SAC 160 0 $7,200.00
In Sacramento County in and near Isleton from Route 12 to 0.5 mile north of Route 220
Sac. 160 pavement rehab.
Rubberized hot mix asphalt (gap graded) overlay 1/2/2015
SHOPP MAJOR
3076 03‐2M900 SAC 50 0.6 $3,130.00
IN SACRAMENTO COUNTY IN SACRAMENTO AT VARIOUS LOCATIONS FROM ROUTE 50/5 SEPARATION TO 0.1 MILE WEST OF FOLSOM BOULEVARD UC
Treat Deck & Repair 7/1/2015
SHOPP MAJOR 145
3077 03‐31800 NEV 20 15.8 $3,077.00
IN NEVADA COUNTY IN NEVADA CITY AT THE NEVADA CITY MAINTENANCE STATION AT 10057 GOLD FLAT ROAD
Nev. City Maintenance Station (Mechanic Sub‐Shop)
CONSTRUCT MECHANICS FACILITY 7/2/2015
SHOPP MAJOR
57
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3078 03‐3338U PLA 65 11.9 $156,849.00
IN PLACER COUNTY NEAR LINCOLN FROM 0.6 KM NORTH OF TWELVE BRIDGES OVERCROSSING TO 1.3 KM SOUTH OF BEAR RIVER Lincoln Bypass
CONSTRUCT NEW FREEWAY AND BRIDGES 7/2/2015
STIP PARTIALLY FUNDED
3079 03‐36781 PLA 80 0 $5,896.00
IN SACRAMENTO AND PLACER COUNTIES IN AND NEAR ROSEVILLE AT VARIOUS LOCATIONS
PLA‐80 HOV (PHASE 1)
CONSTRUCT BYPASS LANE 7/2/2015
STIP FULLY FUNDED
3080 03‐3A010 SAC 5 15.6 $18,100.00
IN SACRAMENTO COUNTY IN SACRAMENTO FROM ROUTE 5/160 SEPARATION TO 0.4 KM NORTH OF ROUTE 5/50 SEPARATION
Sac County Slab CAPM
SLAB REPLACEMENT 7/1/2015
SHOPP MAJOR
3081 03‐3A711 ED 50 0 $37,808.00
IN AND NEAR EL DORADO HILLS FROM 0.9 MILE WEST OF LATROBE ROAD UNDERCROSSING TO 0.3 MILE WEST OF BASS LAKE ROAD UNDERCROSSING
50 HOV‐Phase 1
CONSTRUCT HOV LANES BY ADDING ADDITIONAL LANES IN THE MEDIAN 7/1/2015 CMIA
58
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3082 03‐3C000 SAC 5 9.7 $113,200.00
IN AND NEAR SACRAMENTO, FROM 1.1 MILE SOUTH OF ELK GROVE BLVD OVERCROSSING #24‐277 TO ROUTE 50
Measure A HOV I‐5, South of Sacramento
CONST HOV LANES 7/1/2015
Local Capital Outlay
3083 03‐3C020 59V03 005 0 $9,337,000.00
IN SACRAMENTO COUNTY IN SACRAMENTO FROM J STREET SEPARATION TO ROUTE 160 SEPARATION
Median Barrier Upgade
PLACE CONCRETE MEDIAN BARRIER
8/1/2015SHOPP MAJOR
3084 03‐3C630 SAC 99 0.8 $34,930.00
IN GALT AT C STREET OVERCROSSING #24‐140 (KP 1.3)
Central Galt I/C
RECONSTRUCT INTERCHANGE 7/30/2015
Local Capital Outlay
3085 03‐3C870 GLE 5 20 $7,333.00
IN GLENN COUNTY NEAR ORLAND FROM 0.2 MILE NORTH OF COUNTY ROAD 28 OVERCROSSING TO TEHAMA COUNTY LINE GLE‐5 CAP M
PLACE RUBBERIZED HOT MIX ASPHALT 8/1/2015
SHOPP MAJOR
3086 03‐3E06A NEV 20 12.8 $1,011.00
IN GRASS VALLEY AND IN NEVADA CITY AT ROUTE 20/174 SEPARATION AND AT GOLD FLAT ROAD OVERCROSSING
Nev‐20 Polyster Overlay
POLYESTER CONCRETE AND HMA OVERLAY 7/2/2015
SHOPP MAJOR
59
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3087 03‐3E090 PLA 80 0.3 $11,774.00
IN PLACER COUNTY AT VARIOUS LOCATIONS FROM SOUTH ROSEVILLE OVERCROSSING TO WEIMAR CROSS ROAD OVERCROSSING
10 Bridge Polyester Overlay
PLACE POLYESTER OVERLAY 7/2/2015
SHOPP MAJOR
3088 03‐3E110 NEV 80 28 $2,103.00
NEAR FLORISTON AT TRUCKEE RIVER BRIDGE #17‐0063R/L
Truckee River Bridge Structure Painting
PAINT STRUCTURES 9/21/2014
SHOPP MAJOR
3089 03‐3E120 BUT 70 26.8 $1,942.00
IN BUTTE COUNTY ABOUT 10.9 MILES NORTH OF OROVILLE FROM 0.2 MILE EAST OF PENTZ ROAD TO 0.2 MILE EAST OF CHEROKEE ROAD
Cherokee OH and Pentz Overhead Bridges
SEISMIC RETROFIT 11/5/2014
SHOPP MAJOR
3090 03‐3E410 SUT 99 36.1 $98.00
ABOUT 5.0 MILES NORTH OF YUBA CITY AT 0.1 MILE NORTH OF LOMO CROSSING No Nick
UPGRADE UTILITY POLES W/BREAKAWAY LIGHTING STANDARDS 12/1/2014
SHOPP MINOR B 160
3091 03‐3E520 SAC 99 20.8 $1,000.00
IN SACRAMENTO COUNTY NEAR SACRAMENTO AT 47TH AVENUE OVERCROSSING
Re‐align 47th Ave Offramp
SIGNALIZE INTERSECTION 4/1/2015
SHOPP MAJOR
60
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3092 03‐3F000 YUB 20 13.3 $5,970.00
ABOUT 12 MILES EAST OF MARYSVILLE FROM MARYSVILLE ROAD TO 0.3 MILE EAST OF LOWER SMARTVILLE ROAD
Lower Smartville Rd. Overlay HMA OVERLAY 9/15/2014
SHOPP MAJOR
3093 03‐3F040 SAC 5 23.3 $1,475.00
IN THE CITY AND COUNTY OFSACRAMENTO AT 1.4 MILE SOUTH OFRICHARDS BOULEVARD
I‐5 pumphouse rehab
REPLACE ALL PUMP HOUSE COMPONENTS 11/15/2014
SHOPP MAJOR
3094 03‐3F050 59V03 VAR 0 $2,000,000.00
In Nevada and Placer Counties, on routes 80 and 89 at South Yuba River Bridge near Emigrant Gap and Prosser Creek Bridge near Truckee.
2 Bridge Seismic Retrofit
Seismic retrofit 2 bridges
7/15/2015SHOPP MAJOR
3095 03‐3F080 SAC 51 0.2 $6,393.00
IN THE CITY AND COUNTY OF SACRAMENTO AT FORT SUTTER VIADUCT BRIDGE 24‐188R
Ft Sutter Viaduct Br 3F080 [0312*55])
Grind asphalt concrete and place methacrylate overlay 1/2/2015
SHOPP MAJOR
3096 03‐3F120 COL 20 22.5 $1,500.00
IN WILLIAMS BETWEEN INTERSTATE 5AND HUSTED ROAD TBD
PUBLIC ROAD CONNECTION 9/1/2014
Local Capital Outlay 98
61
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3097 03‐3F170 SAC 5 20 $2,500.00
IN AND NEAR SACRAMENTO ON ROUTES 5, 50, 51, AND 99 AT VARIOUS LOCATIONS
Gore Paving at VARious Locations
ROADSIDE PAVEMENT AND SAFE ACCESS FOR MAINTENANCE EMPLOYEES 12/1/2014
SHOPP MAJOR
3098 03‐3F180 SAC 99 4 $2,350.00
IN AND NEAR SACRAMENTO ON ROUTE 05/99 AT VARIOUS LOCATIONS FROM 0.6 MILE SOUTH OF LAMBERT ROAD UNDERCROSSING TO ELVERTA ROAD
Sac‐99/5 Veg Control 3F180 [0312*98]
PLACE VEGETATION CONTROL AND GRAVEL 4/1/2015
SHOPP MAJOR 45
3099 03‐3F340 SAC 160 7 $9,564.00
NEAR ISLETON AT THREE MILE SLOUGH BRIDGE 24‐121
Three Mile Slough Bridge
PAINT ENTIRE BRIDGE 10/15/2014
SHOPP MAJOR 40
3100 03‐3F620 ED 89 25.15 $2,800.00
ON ROUTE 89 FROM MEEKS BAY RESORTTO STATE PARK ROAD
Meeks Bay Bike Path
CLASS 1 BIKE PATH 8/15/2014 REIMBURSED 420
62
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3101 03‐3F640 SAC 99 6.84 $1,690.00
NEAR ELK GROVE 0.1 MILE TO 0.2 MILE SOUTH OF BADGER CREEK BRIDGE
Sac‐99 WIM 3F640 [0313*143]
REPLACE AND LENGTHEN CONCRETE, REPLACE SENSORS FOR CABINET CONTROLLER, RAISE CABINET, AND WIDEN SHOULDER FOR MAINTENANCE PULLOUT 5/1/2015
SHOPP MAJOR
3102 03‐3F650 NEV 89 0 $5,000.00
In and near Truckee from 0.7 mile north of 80/267 junction to Sierra County line Truckee CAPM
Pavement overlay 1/15/2015
SHOPP MAJOR
3103 03‐3F660 SAC 160 1.4 $2,950.00
In Sacramento County near Antioch from 1.2 miles south of Sherman Island Levee Road to West Sherman Island Road
South of Rio Vista HMA Overlay HMA Overlay 9/22/2014
Local Capital Outlay
3104 03‐3F670 ED 49 23.9 $6,000.00
about 9 miles north of Placerville from Coloma to Cool
APM ‐ Lotus Road to Cool
Pavement overlay 2/15/2015
SHOPP MAJOR
63
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3105 03‐3F690 YOL 50 0.4 $2,106.00
In West Sacramento at 0.4 mile west of westbound Route 80 on‐ramp onto eastbound Route 50
Yol‐50 WIM 3F690K [0313*151]
Relocate existing Weigh In Motion station 6/1/2015
SHOPP MAJOR
3106 03‐3F700 YUB 49 5.97 $900.00
NEAR CAMPTONVILLE FROM 0.5 MILE NORTH OF CAMPTONVILLE ROAD TO 1.1 NORTH OF CAMPTONVILLE ROAD
Yub 49, Repair Cutslope/Embankment
REPAIR CUT SLOPE AT POSTMILE 5.97 AND REPAIR EMBANKMENT AT POSTMILE 6.10 1/1/2015
SHOPP MINOR A
3107 03‐3F710 NEV 80 19.74 $270.00 In Truckee on outside shoulder of E/B NEV‐80 Nev Drainage
Drainage improvements 5/15/2015
SHOPP MINOR B
3108 03‐3F740 PLA 89 13.73 $2,350.00
NEAR TRUCKEE FROM SQUAW VALLEY ROADTO WEST RIVER STREET
Truckee River Bike Trail BIKE PATH 4/1/2015
Local Capital Outlay
3109 03‐3F770 SUT 99 13.6 $2,600.00
At VARious locations in Butte, Colusa, Placer, Sacramento, Sutter, and Yolo Counties
Shoulder and Centerline Rumble Strips (Safety)
Install shoulder and centerline rumble strips 9/1/2014
SHOPP MAJOR
3110 03‐3F780 COL 20 31.07 $100.00
IN COLUSA ON ROUTE 20 AT 9th STREET AND AT JAY STREET, AND ON ROUTE 45 AT 11th STREET no nick
INSTALL THREE OVERHEAD SIGNS IN COLUSA 1/1/2015
SHOPP MINOR B
64
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3111 03‐3F790 SUT 20 16.52 $575.00 IN YUBA CITY AT PLUMAS STREET
Signal Modification at Plumas Street
REPLACE SIGNAL POLES FOR EASTBOUND AND WESTBOUND TRAFFIC. ALSO, UPGRADE ADA FACILITIES 8/14/2015
SHOPP MAJOR
3112 03‐3F890 ED 50 17 $500.00
IN EL DORADO COUNTY IN PLACERVILLE FROM 0.7 TO 0.4 MILE WEST OF MAIN STREET
Install grated line drain and DIs in the Median
INSTALL GRATED DRAIN LINE AND DI'S TO REMOVE WATER FROM WESTBOUND AND EASTBOUND MEDIANS 9/1/2014
SHOPP MINOR A
3113 03‐3F920 NEV 80 19 $2,250.00
IN TRUCKEE AT 0.8 MILE WEST OF UNION MILLS BRIDGE 17‐58 AT FLORISTAN SAND AND SALT HOUSE
Nev 80, Near Truckee, Relocate Floriston Sand House
REPLACE SANDHOUSE 8/3/2015
SHOPP MINOR A
65
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3114 03‐3F960 SAC 51 3.1 $106.00
IN THE CITY AND COUNTY OF SACRAMENTO ON ROUTE 51 AT CAL EXPO UNDERCROSSING BRIDGE 24‐0133
Cal Expo Bridge Drainage System
CONSTRUCT DRAINAGE SYSTEM TO FUNNEL WATER FROM A LOW SPOY TO AN EXISTING FUNNEL DOWN DRAIN 9/15/2014
SHOPP MINOR B
3115 03‐4A240 59V03 080 0 $6,616,000.00
IN NEVADA COUNTY ABOUT 12.4 MILES WEST OF TRUCKEE AT DONNER SUMMIT SAFETY ROADSIDE REST AREA
Donner Summit Safety Roadside Rest Area
REPLACE COMFORT STATIONS
7/2/2015SHOPP MAJOR
3116 03‐4C220 NEV 80 18.4 $1,628.00
IN NEVADA COUNTY NEAR TRUCKEE FROM 0.9 MILE WEST OF UNION MILLS UNDERCROSSING TO 1.1 MILES WEST OF UNION MILLS UNDERCROSSING
Donner Truck Inspection Facility Rehab
REPLACE HEATING SYSTEM 7/2/2015
SHOPP MAJOR
3117 03‐4E380 SAC 160 6.976 $100.00 NEAR ISLETON AT THREE MILE SLOUGH BRIDGE No Nick
UPGRADE CCTV, INSTALL CABINETS, WIRING AND RELAYS FOR TWO SIGNALS 12/1/2014
SHOPP MINOR B
66
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3118 03‐4E660 ED 49 33.6 $137.00 NEAR COOL AT 0.8 MILE SOUTH OF ROUTE 193 No Nick
REMOVE PORTION OF SLOPE 12/1/2014
SHOPP MINOR B
3119 03‐4E860 PLA 193 4.4 $6,680.00
NEAR LINCOLN FROM 0.1 MILE WEST TO 0.9 MILE EAST OF CLARK TUNNEL ROAD
Curve Improvement
CURVE IMPROVEMENTS AND WIDENING 3/15/2015
SHOPP MAJOR
3120 03‐4E900 PLA 65 5.8 $1,100.00
IN ROSEVILLE AT HARDING BOULEVARD OVERCROSSING
Galleria BouleVARd Signal
SIGNALIZE AND WIDEN SB EXIT RAMP 7/1/2015
Local Capital Outlay
3121 03‐4F000 PLA 80 17.1 $93.00
In and near Auburn from the Nevada Street Overcrossing to the Auburn Ravine Overcrossing Trucks Ok signs
Install signs allowing trucks to use the number 2 lane through Auburn 2/1/2015
SHOPP MINOR B
3122 03‐4F020 PLA 65 4.8 $7,800.00
In and near Roseville from Interstate 80 to Industrial Avenue HMA Overlay HMA Overlay 8/1/2015
SHOPP MAJOR
3123 03‐4F040 YUB 65 0 $5,081.00
In and near Wheatland from the Bear River Bridge 19‐0013 to 0.3 mile north of South Beale Road TBD HMA overlay 5/1/2015
SHOPP MAJOR
3124 03‐4F070 SAC 50 16.9 $6,200.00 In Rancho Cordova at Natoma Overhead
Natoma Overhead
Widen Structure, extend weave lane, and add ramp metering. 10/15/2014
67
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3125 03‐4F120 SAC 5 12.9 $691.00 Near Sacramento at Beach Lake Bridge
Sac‐5 High Friction Treatment on Beach Lake Bridge
High friction surface treatment, including spot repairs of existing bridge deck surface 11/17/2014
SHOPP MAJOR
3126 03‐4F130 SAC VAR 0 $1,660,000.00
IN THE CITY AND COUNTY AT VARIOUS LOCATIONS ON ROUTES 5, 50, and 80. ALSO IN BUTTE COUNTY ON ROUTE 191
High Friction Surface Treatment
Place High Friction Surface treatment
6/1/2015SHOPP MAJOR
3127 03‐4F140 NEV 80 19.25 $681.00 In Truckee at the CHP Inspection Facility
Rehab Donner Pass Inspection Facility parking lot
Rehab parking lot 2/2/2015
SHOPP MINOR A
3128 03‐4F150 SAC 160 4.1 $350.00
ABOUT 9 MILES SOUTH OF ISLETON FROM CONN SHERMAN ISLAND ROAD LEFT TURN TO 0.5 MILE NORTH OF BEANPOT RESTAURANT
Sac 160 @ Sherman Island Levee Repair (FCO)
construct drainage system and add material to landslide to stop seepage 9/1/2014
SHOPP MINOR A
3129 03‐4F160 BUT 99 34.25 $700.00
IN AND NEAR CHICO AT COHASSET ROAD OVERCROSSING AND AT EATON ROAD OVERCROSSING
But 99 @ Cohasset Rd, Interchange Street Lighting
INSTALL STREET LIGHTING 12/1/2014
SHOPP MINOR A
68
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3130 03‐4F210 YUB 70 8.2 $50.00
ABOUT 5.4 MILES SOUTH OF MARYSVILLE AT 0.1 MILE SOUTH OF 65s/70 SEPARARTION BRIDGE 16‐42
Construct drainage system
CONSTRUCT DRAINAGE SYSTEM TO TRANSPRT WATER FROM HIGH SIDE OF SUPER TO LOW SIDE TO RESTORE PROPER DRAINAGE PATTERN 6/1/2015
SHOPP MINOR B
3131 03‐4F270 59V03 VAR 0 $378,000.00In Glenn and Sacramento counties at various locations
Sac/Glen ITS Safety Improvements
install and/or modify signals and signs to reduce collisions
2/2/2015SHOPP MAJOR
3132 03‐4F330 59V03 005 0 $1,000,000.00
IN THE CITY AND COUNTY OF SACRAMENTO ON INTERSTATE 5 AT VARIOUS LOCATIONS
Sac 5, CHP Emergency Vehicles Pullouts/Turnarounds @ 13 Locations
INSTALL 9 PULLOUTS AND CREATE/PAVE CROSSOVERS FOR THE CHP AND OTHER EMERGENCY VEHICLES
8/14/2015SHOPP MAJOR
69
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3133 03‐4F340 59V03 080 0 $4,649,000.00
Near Kingvale from 0.1 mile east of Kingvale Undercrossing to 0.2 mile west of Soda Springs Overcrossing
Kingvale grade gutter
Replace AC ditch with PCC
10/1/2014SHOPP MAJOR
95
3134 03‐4F360 59V03 VAR 0 $450,000.00
in Sacramento on Route 51, also in Yolo and El Dorado counties on Route 5 and Route 50
High Friction Surface Treatment @ 3 locations
Installation of high friction surface treatment at 3 locations
7/15/2015SHOPP MAJOR
3135 03‐4F390 59V03 VAR 0 $700,000.00
IN EL DORADO COUNTY ON ROUTES 49 AND 50 AT VARIOUS LOCATIONS AND IN SACRAMENTO AND YOLO COUNTIES ON ROUTE 80 AT VATIOUS LOCATIONS.
High Friction Surface Treatment
HIGH FRICTION SURFACE TREATMENT
4/1/2015SHOPP MAJOR
3136 03‐4F520 59V03 VAR 0 $400,000.00
In Butte, Colusa, El Dorado, Nevada, Placer, Sacramento, Sierra, Sutter, Yolo, and Yuba Counties at various locations
Nickname Required
Replace toilets, Urinals, faucets, and shower heads to meet water conservation specifications
2/26/2015SHOPP MAJOR
3137 03‐4F530 59V03 VAR 0 $230,000.00In Chico and Sacramento at various locations
ADA Improvements
Install 6 curb ramps and 320 linear feet of sidewalk
2/1/2015SHOPP MINOR B
70
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3138 03‐4F590 SAC 99 18.3 $700.00
Near Sacramento from 0.2 mile north of Elder Creek Bridge 24‐149 to Florin Creek Bridge 24‐181
Replace Soundwall PEER
Remove existing 10' soundwall and replace with a new 10' soundwall 6/1/2015
STIP Local Delivery
3139 03‐4F670 NEV 49 3.376 $400.00
About 10 miles south of Grass Valley at Brewer Road
Nev 49,Construct right turn pocket @ Brewer Rd
Add right turn pocket 12/1/2014
SHOPP MINOR A
3140 03‐4F680 YUB 70 13.6 $750.00
In Marysville at Yuba River Bridge and Overhead 16‐34
Install/upgrade bicycle and pedestrian railing
Install see through bicycle rail along the existing bridge rail and modify railing on spiral pedestrian ramp 4/1/2015
SHOPP MINOR A
71
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3141 03‐4F700 PLA 80 31.1 $900.00
In Placer County near Colfax at Illinoistown Overcrossing
Crispin Cider STAA Access
Increase on and offramp radius and lane width of Illinoistown Overcrossing to allow for STAA truck turn movements 1/15/2015
SHOPP MINOR A
3142 03‐4F710 SAC VAR 0 $2,000,000.00In and near Sacramento on routes 5, 51, and 99 at various locations
Replace & Upgrade sign panels & structures
Replace sign panels and upgrade sign structures as needed
7/15/2015SHOPP MAJOR
3143 03‐4F720 SAC 50 0 $173.00
In Sacramento on Route 50 at the 50/51/99 separation bridges.
Oakpark Guardrail
Install/upgrade metal beam guardrail and concrete barrier sheilding bridge columns 2/1/2015
SHOPP MINOR B
3144 03‐4F860 SUT 20 15.09 $0.00
Repair electrical conduit 8/1/2014
SHOPP MINOR B
3145 03‐4F870 SAC 51 1.77 $0.00 Replace Bridge Barriers 4/1/2015
Local Capital Outlay
72
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3146 03‐4M040 PLA 80 24.5 $5,400.00
IN PLACER COUNTY IN AND NEAR COLFAX FROM 1.1 MILES EAST OF PLACER HILLS OVERCROSSING TO 0.2 MILE EAST OF ROUTE 174/80 SEPARATION No Nick
BONDED WEARING COURSE OVERLAY 11/1/2014
MAINTENANCE
3147 03‐4M200 COL 20 22.3 $853.00
IN COLUSA, BUTTE, AND GLENN COUNTIES ON ROUTES 5, 20, 32,149, AND 162 AT VARIOUS LOCATIONS
Subscour Mitigation at 6 Locations
SUB‐SCOUR MITIGATION‐7 BRIDGES 8/1/2014
SHOPP MAJOR
3148 03‐4M460 SIE 89 15.9 $500.00
NEAR CALPINE FROM WILSON LANE TO 0.2 MILE SOUTH OF SULPHER CREEK ROAD No Nick
CULVERT REHABILITATION 1/1/2015
MAINTENANCE
3149 03‐4M670 SAC 104 9 $400.00
Near Galt from 0.3 mile east of Clay Station Road Left to Amador County Line
Replace Guardrail
Replace aging metal beam guardrailing 6/1/2015
MAINTENANCE
3150 03‐4M720 YOL 80 2.47 $1,883.00
In Sacramento and Yolo Counties on Route 80 at VARious locations No Nick 12/1/2014
MAINTENANCE
3151 03‐4M740 59V03 VAR 0 $6,378,000.00
In Yolo and Colusa Counties County on Routes 5, 80, and 505 at various locations (14 bridges)
Yol/Col Br Decks 4M740 [0313*30]
Deck Methacrylate‐polyester and joint repair on 14 bridges
10/2/2014SHOPP MAJOR
95
73
Caltrans North Region ConstructionFuture Construction Projects
Map No Contract CO Rte PM Const Cap Project Descrition NicknameWork Description Ad Date
Category Description
Work Days
12 Month Look Ahead Projects as of July 2014
3152 03‐4M790 BUT 99 24.5 $1,400.00
Near Chico from 0.6 mile north of Pentz Road Overcrossing 12‐019 no nick
PCC profile grinding 8/1/2014
MAINTENANCE
3153 03‐4M860 NEV 80 15 $300.00
IN TRUCKEE FROM THE EASTBOUND OFFRAMP TO WEST TRUCKEE TO 0.2 MILE WEST OF ROUTE 80/267/89 SEPARATION BRIDGE 17‐94 NO NICK 6/1/2015
MAINTENANCE
3154 03‐4M980 PLA 89 8.9 $1,500.00
About 13 miles south of Truckee at the Truckee Maintenance Station TBD
Install equipment wash rack 1/1/2015
MAINTENANCE
3155 03‐4M990 NEV 80 0.1 $1,800.00 In Soda Springs at Donner Pass Road
install wash rack
Install Equipment wash rack 6/1/2015
MAINTENANCE
$96,929,638.00 Sum of District 3