Download - Locker design
![Page 1: Locker design](https://reader035.vdocuments.us/reader035/viewer/2022081512/56816044550346895dcf6777/html5/thumbnails/1.jpg)
Locker design
![Page 2: Locker design](https://reader035.vdocuments.us/reader035/viewer/2022081512/56816044550346895dcf6777/html5/thumbnails/2.jpg)
Team norms • Must always communicate • If lack of work then we need to work together • Must divide work evenly • I'm open to suggestions • We must see who does what.• We must have an emergency spot where we have all of the
parts of the project saved. Ex: USB / email• If you aren't able to be at school one day do parts ahead of
time or communicate with each other ASAP. • If a member from the team doesn’t do their part they’ll get a
ZERO or need to make it up ASAP.
![Page 3: Locker design](https://reader035.vdocuments.us/reader035/viewer/2022081512/56816044550346895dcf6777/html5/thumbnails/3.jpg)
Comments!!!
• Me Karla Ruiz and Antonio Sifuentes agree on doing the locker organizer project!
• If you need to contact me my email is: [email protected]
• *We have a new member in the group Antonio Sifuentes
• You can text me to (575)652-7106 or email [email protected]
![Page 4: Locker design](https://reader035.vdocuments.us/reader035/viewer/2022081512/56816044550346895dcf6777/html5/thumbnails/4.jpg)
DEADLINES (Timeline)
• Sketches due……………….5/3/13• Part files due……………….5/8/13• Assembly due………………5/10/13• IDW’s and IPN……………..5/13/13• Presenations due…………5/15/13
![Page 5: Locker design](https://reader035.vdocuments.us/reader035/viewer/2022081512/56816044550346895dcf6777/html5/thumbnails/5.jpg)
?????????????????????
Any Questions, Comments, Concerns?
![Page 6: Locker design](https://reader035.vdocuments.us/reader035/viewer/2022081512/56816044550346895dcf6777/html5/thumbnails/6.jpg)