Current tie bar installation
![Page 3: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/3.jpg)
3
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Preliminary analysis
Assumed vacuum load: 20,000 lb total or 5,000 lb per rod (89,000 N)
Maximum distance between vacuum vessel ears: 81” (2050 mm)
Assume pinned ends
Assume S.F. of 4
Pcr = 2EI/l2 = 20,000 lb
For stainless steel the minimum value for I = 0.475 in4
Need ID = 1.25” to be compatible with current geometry
Solving for OD yields OD = 1.86” so use 2”
Actual I = 0.66 in4 so S.F. ~ 5.6
![Page 4: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/4.jpg)
4
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Attachment to existing ear
![Page 5: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/5.jpg)
5
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Attachment to sliding sleeve
![Page 6: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/6.jpg)
6
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Attachment to existing ear
![Page 7: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/7.jpg)
7
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Attachment to existing ear
At the magnet ears, the tie bar attaches with a 30 mm bolt. The bronze to stainless interface slides during pressure loading.
![Page 8: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/8.jpg)
8
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Attachment to sliding sleeve
Each tie bar joins at the sliding sleeve ear. This is where each is adjusted for length, preloaded slightly, then locked in position.
![Page 9: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/9.jpg)
9
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly of two tie rods at each ear location
![Page 10: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/10.jpg)
10
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly of two tie rods at each ear location
![Page 11: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/11.jpg)
11
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical tie rod assembly
Threaded insert – 30 mm thread ID, 42 mm thread OD
Jam nut
Tie rod sleeve – 2” OD, 1.25” ID
Insert – 30 mm thread ID, 42 mm smooth OD
![Page 12: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/12.jpg)
12
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Tie rod assembly using sleeves – v2
![Page 13: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/13.jpg)
13
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly – v2
Outer nut omitted to prevent excessive load in the event of a cryogen spill inside the vacuum vessel
![Page 14: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/14.jpg)
14
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly – v2
Nut to tighten sleeve against intermediate ear
Nut to tighten assembly against vacuum vessel ear
Spherical washers
2” OD, 1.25” ID sleeve
Tie rod
Tie rod, nuts, and spherical washers are the same as those in the current system
![Page 15: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/15.jpg)
15
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly – v2
![Page 16: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/16.jpg)
16
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly – v2
![Page 17: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/17.jpg)
17
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Typical assembly – v2
![Page 18: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/18.jpg)
18
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX tie rod assembly using sleeves – v2
![Page 19: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/19.jpg)
19
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX typical assembly – v2
![Page 20: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/20.jpg)
20
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX typical assembly – v2
![Page 21: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/21.jpg)
21
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX typical assembly – v2
![Page 22: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/22.jpg)
22
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX typical assembly – v2
![Page 23: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/23.jpg)
23
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX typical assembly – v2
![Page 24: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/24.jpg)
24
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q1 to Q2 tie rod assembly
MB-390925(1162 mm sleeve)
MB-390923(420 mm sleeve)
30 mm hex nuts (2)
30 mm jam nut (1)
Spherical washers (2 pairs)
Typical end detail
30 mm tie rod
![Page 25: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/25.jpg)
25
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q2 to Q3 tie rod assembly
MB-390925(1162 mm sleeve)
MB-390924(620 mm sleeve)
30 mm hex nuts (2)
30 mm jam nut (1)
Spherical washers (2 pairs)
Typical end detail
30 mm tie rod
![Page 26: LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary](https://reader035.vdocuments.us/reader035/viewer/2022062723/56813fbf550346895daa9d48/html5/thumbnails/26.jpg)
26
brookhaven - fermilab - berkeleyUS LHC ACCELERATOR PROJECT
Q3 to DFBX tie rod assemblyMB-390926(682 mm sleeve)
30 mm hex nuts (2)
30 mm jam nut (1)
Spherical washers (2 pairs)
Typical end detail
30 mm tie rod
Stiffener plates (2)