TRAINING ON PROPOSAL WRITING & RESOURCE MOBILIZATION FOR FOCUS
PAKISTAN STAFFKARACHI.
BY FIDA KARIM
DATED: 28TH MAY, 2014
LOGICAL FRAMEWORK APPROACH OF PROJECT PLANNING
1
![Page 2: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/2.jpg)
WHAT IS A LOGICAL FRAMEWORK ?
The Logical Framework Matrix provides a summary of :
• Why a project is carried out• What the project is expected to achieve• How the project is going to achieve it• Which external factors are crucial for its success• Where to find the information required to assess the success of the
project• Which means are required• How much the project will cost
2
![Page 3: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/3.jpg)
THE LOGICAL FRAMEWORK MATRIX
3
![Page 4: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/4.jpg)
THE LOGFRAME AND THE PROJECT CYCLE
4
* NGO’s mandate* NGO thematic/geo. orientations* outcome : Programme strategy
* pre-feasibility project studies* outcome : decision YES/NO
* all significant aspects of the idea are studied* outcome : logical framework
* fundraising strategy * proposal writing for donors* outcome : financing contract(s)
* the agreed resources are used to achieve the project purpose* reports / contract amendments* outcome : decision to continue as planned or re-orient the project
* relevance and and fulfilment of objectives * outcome : how to use results in future programming
![Page 5: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/5.jpg)
ORGANISATIONS USING THE LOGFRAME
• USAID, USA
• GTZ, Germany
• DfID, Great-Britain
• NORAD, Norway
• DANIDA, Denmark
• AUSAID, Australia
• Intercooperation, Switzerland
• Ministry of Foreign Affairs, France
• DGCD, Belgium
• European Commission
5
• DGCS - Min. of For. Aff., Italy
• ICAX - Min. of Industry, Spain
• SIDA, Sweden
• UNIDO, Vienna
• FINNIDA - Min. of For. Aff., Finland
• HELLASCO, Greece
• WWF
• Int. Federation of Red Cross
• UNDP
• FAO
![Page 6: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/6.jpg)
AVANTAGES OF THE LOGICAL FRAMEWORK
Problems are analysed systematically
The objectives are clearly formulated, logical and measurable
The risks and conditions for success of a project are taken into account
There is an objective basis for monitoring and evaluation
6
Your project proposal will be coherent
![Page 7: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/7.jpg)
7
4. The log-frame
![Page 8: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/8.jpg)
LEVELS OF OBJECTIVES
8
The broader impact(s) to which your project will contribute to, but will not enable to reach entirely
The outcome of your project, what should be achieved at the enf of the project.
Specific outputs which will contribute to the realisation of your project purpose
Concrete activities that will be undertaken during the project
Project Purpose
ExpectedResults
Activities
Overall Objective(s)
4. The log-frame
![Page 9: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/9.jpg)
HIERARCHY OF OBJECTIVES/PROJECT STRUCTURE
Impact
Outcome
Outputs
Activities
Inputs
High level impact/longer term change to which the
project contributes
The project’s central objective/ its specific and
immediate outcome. What do you wish to achieve?
What is produced or delivered by the project
Specific tasks/activities executed by the project to
produce the outputs.Physical and non-physical
resources necessary to undertake activities.
Plan Dow
n
Implement up
![Page 10: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/10.jpg)
10
EXAMPLE OF IMPROVING SUPPLY OF POTABLE WATER AND SANITATION FACILITIES
Impact Improved health and sanitary conditions in targeted communities.
Outcome Improved access to sustainable waterand sanitation services for target communities.
Output Improved and renovated water systems
Activity Designing, constructing new water and sanitation facilities.
Input Human resources, training, expert, funding etc.
![Page 11: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/11.jpg)
4. THE LOG-FRAME
Define objectively verifiable indicators (OVI):
!!! Do not make the confusion between « criteria » and « indicators » !!!
A criteria is for instance: « number of… », « increase in… »
Whereas an indicator is « 150 persons per month », « 34% of increase in … »
11
![Page 12: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/12.jpg)
EXAMPLE OF A GOOD INDICATOR
Objective: The irrigation system is working
The indicator should be « SMART »: Specific = The irrigation pumps are functioning properly in the project area Measurable = 50 of the irrigation pumps are functioning properly in the project area Acceptable = Is the indicator accepted by all the partners involved in the implementation of the project ? Relevant = Are the irrigation pumps the main problem? Time-bound = 100% of the irrigation pumps are functioning properly in the project area at the end of the project
12
4. The log-frame
![Page 13: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/13.jpg)
4. THE LOG-FRAME
Consider the various risks and assumptions on your project:= external factors that may affect the projects’
implementation and long-term sustainability = synergetic activities made by other actors
Do not define assumptions that are endogenous to the project and the scheduled activities !!
Only mention relevant hypothesis…
13
![Page 14: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/14.jpg)
14
Is the RISK important to your project?
Yes No
What is its probability? Ignore
Almost certainUnlikely Fairly Unlikely
Can the project strategy be modified to eliminate the risk?
YesNo
Modify strategy, add activitiesSTOP the project
Formulate an assumption
Risks/Assumptions
4. The log-frame
![Page 15: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/15.jpg)
INTERVENTION LOGIC OF PROJECT + ASSUMPTIONS
15
IN OUT
Overall objective
Project Purpose
Results
Activities
+
+
+
Assumptions
Assumptions
Assumptions
Pre-conditionsIf the activities are carried out,and if assumptions are valid, then ...
4. The log-frame
![Page 16: Lfa approach on project planning](https://reader036.vdocuments.us/reader036/viewer/2022082920/554ad04fb4c90524738b554f/html5/thumbnails/16.jpg)
10 FREQUENTLY MADE ERRORS IN LOG-FRAME:MAKE SURE TO…
1. Have only one specific objective.2. Have a coherence in the hierarchy between objectives and
results.3. Formulate objectives and results as they were already
achieved.4. Define “SMART indicators” (no activity, no vague indicator
like criteria).5. Do not transpose the activities as indicators of the results.6. Do not define indicators next to the general objectives (they
are irrelevant in most cases).7. Do not define sources of verification that are too expensive
or impossible to get. In any case, if an expensive source of verification is mentioned, be sure to integrate it in the activities and within the budget.
8. Do not define hypothesis endogenous to the activities you should implement.
9. Next to activities, mention the means (HR and material) and the costs.
10. Do not forget pre-conditions 16