Transcript
  • LET’S GO!Installation instructions for the UTBASEhttps://www.campbellsci.com/utbase#documents_

    An anchor bolt installed on anangle will inhibit the leg adjustments

    needed to level the tower.

    Make sure the anchor bolts remainvertical while placing the concrete.


Top Related