Module Objectives
Implementation phase.
an t e . ramewor .
Fundamental programming concepts.
Using the OO programming approach. Understand the key processes related to building
Appreciate the complexity of applicationdevelopment.
-
8/8/2019 Lesson PDLC 2010
3/22
Module Outcomes
Demonstrate an understanding of:
w ere program eve opmen s n o e OO concepts, characteristics and terminology
the skill required to program in a high-level
development environment
Develop the skills to:
undertake basic program development using C# inthe .NET framework
-
8/8/2019 Lesson PDLC 2010
4/22
Expectations
Attend classes.
Engage with the module.
Self study.
Complete practical exercises honestly
essen a prac ce o re n orce e concep s
-
8/8/2019 Lesson PDLC 2010
5/22
Resources
Text Book:
Be an Parr C# or tu ents, A son Wes ey
Other resources on ADT website as needed.
ADT website for all modulerelated material:
lecture slides practicals
extra material
-
8/8/2019 Lesson PDLC 2010
6/22
Topics of Discussion
System Development Life Cycle
Program Development Life Cycle
-
8/8/2019 Lesson PDLC 2010
7/22
Systems Development Life Cycle
-
8/8/2019 Lesson PDLC 2010
8/22
Implementation Phase
What is the purpose of this phase?
What are the inputs to this phase?
What are the outputs to this phase?
What activities are performed during this
To what extent does the end-user get
involved?
-
8/8/2019 Lesson PDLC 2010
9/22
Purpose
A number of tasks have to be completed
operate.
includes hardware acquisition, softwaredevelopment or acquisition, user preparation,hiring and training of personnel, site and data
preparation, installing, testing, start-up anduser acceptanceStair & Reynolds (2003:577)
-
8/8/2019 Lesson PDLC 2010
10/22
Inputs
Analysis & Design Phases: analysts would have documented the user requirements for the
system during the Analysis Phase. would have documented an overview of the system.
also constructed an Entity Relationship Diagram and ActivityHierarchy Diagram - use these to construct the tables and
relationships if developing the system. OO Approach
UML use case, class, interaction, state, activity
,
needs. if constructing the system, construct the screens/forms and
reports based on the specifications drawn up during the DesignPhase.
-
8/8/2019 Lesson PDLC 2010
11/22
Outputs
Live system
running system that meets the user requirements. should have as few bugs as possible.
Documentation technical
user manual
-
8/8/2019 Lesson PDLC 2010
12/22
Activities
Hardware Acquisition Obtaining the components of the information system.
Software Acquisition or Construction Need to determine if going to purchase.
User Preparation Changing mindsets Getting people to realize new system.
Personnel Decide if new personnel are required Do existing employees needadditional training.
Site and Data Preparation Preparation of the location of the new system, and, ifnecessary, converting manual files into computer files.
Installation Setting up the equipment.
.
Start-up Making the tested system operational.
User Acceptance Handover to client.
Post-Implementation Evaluation Assess the overall quality of the informationsystem.
-
8/8/2019 Lesson PDLC 2010
13/22
End-User Involvement
A strong correlation exists between successful
sys ems an we - ra ne users.
End-User is involved in:
training user documentation
systems test ng post-implementation evaluation
-
8/8/2019 Lesson PDLC 2010
14/22
Program Development Life Cycle
-
8/8/2019 Lesson PDLC 2010
15/22
Analyse Problem
Review program specification package: the programmer reviews the package, which identifies the input,
u u , u .shows relationships among programs.
by thoroughly reviewing these deliverables, the programmerunderstands the nature and requirements of each program.
Meet with analysts and users: enables the programmer to understand the purpose of the programfrom the users perspective.
programmer may wish to recommend a change to some aspect of the. , .
programmer MUST NOT change a requirement without consulting withanalysts and users.
Identify & review programs input, output and processingcomponents.
-
8/8/2019 Lesson PDLC 2010
16/22
Design Programs
Devise a solution algorithm:
Design Tools
Program flowchart graphical representation of relationships
flowcharting software (e.g. Visio) Pseudo code
written representation of program logic
use indentation to depict control structures
Test the solution algorithm
identifying errors in logic is easier at this stage ofthe PDLC than later.
-
8/8/2019 Lesson PDLC 2010
17/22
Code Programs
Translate the solution algorithm into a
. Enter the programming code into the
computer.
Each language has its own syntax.
Should document code as you enter it into thecomputer
use global and internal comments.
-
8/8/2019 Lesson PDLC 2010
18/22
Test Programs
Thorough testing is very important
ec s on ma ng may epen on use o program anits outputs
Users should assist in development of test data.
Looking for bugs/errors (debugging)
syn ax
logic
run-time
-
8/8/2019 Lesson PDLC 2010
19/22
Formalise Solution
Review the program code
look for dead/redundant code & remove it.
Review all the documentation
all documentation should be complete &accurate.
-
8/8/2019 Lesson PDLC 2010
20/22
Maintain Programs
Once implemented, it may be discovered that
e program nee s o e c ange n or er o: correct errors
add enhancements
Starts another iteration of the PDLC!
-
8/8/2019 Lesson PDLC 2010
21/22
-
8/8/2019 Lesson PDLC 2010
22/22
What you need to do next
Textbook Bell & Parr:
read Preface & Chapter 1 practice some of the given examples
try the self-test questions
visit the companion web site:
Read ahead to Chapter 2