LCP-AR~
LABOR COMPLIANCE PROGRAM ANNUAL REPORT
Formatfor Awarding Body that enforces its own Labor Compliance Program for all projects (Labor Code §1771.5(a»
(mmJddlyyyy)
1. Name of Labor C!:omp1iance Program (LCP) :
Rocklin Unified School District
Report for the reporting period 2/1/2009 ~ 1/31/2010; I;CI/... " .. ,\
2. LCP J.D. Numbt (assigned by DIR):
2004.00391
3. Date of Initial Approval:
February 10, 2004
4. Contact person qnclude name, title, address, telephone, fax, and e-mail, ifa.vailable):Linda Tayl~r . Ph: 916 630 3188Admin. Assfstant . '. Fax: 916 624 7246Rocklin Untfied School Distirct Email: [email protected] Sierra'Meadows Drive . i.
I .Rocklin, C~ 95677
5. Did LCP perfonjn any LC § 1771.5 enforcement activities during the 12 months in the reporting period?
Please check onti: Xfr Yes
rNo
If Yes, proceed to item 6 on the next page
If No, complete the information below, sign the form and submit to DIR, Office of the Director, Attn: LCP Special Assistant,
455 Golden Gate Avenue, 10th Floor, San Francisco CA 94102
What suggestions ~o you have for the Department of Industrial Relations to better assist you with your program in the coming year? (attach additional sheets ifnecessary)
SU~M~TED B~:
~Ad~J
~.-Signature {j
Linda Taylor, Admin. Asst., Facilities
Name and Title
May 5, 2010
Date
r rp ANNI riA I. R FPORT R rrR S 1hd11 __ A R ,,11 nrni""N ?OOll
.""
LCP-AR26. LC § 1771.5 en orcement activities (provide all information requested, attaching as many sheets as necessary).
A. List projects ha dIed by LCP within the past 12 months.
Project Name Bid Advertisement Date Prime Contractor Contract Amount
Sunset Rand Elementary April 27. 2007 Roebbelen Construction InC' $'1) ~L..q nnn nn....'.
~:.,.;.'o~.:'ft.;...:;:.<;,.:;{< ;:~.'"Total
B. List any proiect subiect to the limited exemotion clause ofLC § 1771.5(a), if applicable.
Project Name Description of Project Contract Amount
I
Total ~_t.I~~lif4~i~~tii;i;~~~l\t~ifI~_~~;;:~~~~~~~i.i
r feP ANNrrAL RrORT R rrR S "'1[ -- AR ,rr mni~" ?OI1ll
LCP-AR2
C. Summary of all wages and penalties assessed and/or recovered.Approval of
Affected ContractorAmount Amount
ForfeitureProject Narne (who directly employed the
Assessed RecoveredRequested from Description of Violation
worker) LaborCommissioner?
CYes rNo
CYes rNo
QYes rNa
CYes rNa
lJ Yes rNa
rYes rNo
r:J Yes rNa
DYes rNa
Total ~~_t(~lrllltgJ~f:j~tt.m _ft~~~ti~~~$f~~~l~~_~~llii~~t&i~~
D. For any amount i~entified in item C for which approval of forfeiture not requested from the Labor Commissioner, please explain below.
Project Name Amount AssessedAmount
ExplanationRecovered
Total
I.rp ANNllAT RipORT R rl'R S 1(;411 __ AR >'Ill nroipr.t" '?nOR
LCP-AR2
E. For any amount i ientified in item C for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:
Project Amount Assessed Amount RecoveredName LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775 LC § 1813 Wages Total
Total
F. Identify cases tha are or were the subject ofLC § 1742 proceedings.
Project Name Contractor Nature ofViolation ODL Case # Current Status
G. Did you refer an' contractor to the Labor Commissioner for debarment per LC § 1777.1?
Please check one: rYes xIiC No..
Ifyes, identify a !rected contractor(s) or subcontractor(s) and date(s) of referral:
H. Did you refer am apprenticeship violation to the Division of Apprenticeship Standards (DAS)?
Please check one: rYes xIX No
If yes, identify a "'ected contractor(s) or subcontractor(s) and date(s) of referral:
Trp ANNITAT. RI .PORT II rrR S 1/1411 -- AR >'111 nrniprt~ ?OOll
...