Las Delicias, Las Delicias, El SalvadorEl Salvador
Water Supply Water Supply ProjectProject
Current Project Status, January 2010Richard Cairncross & David Haussler
![Page 2: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/2.jpg)
Presentation OutlinePresentation Outline
• Overview of Las Delicias Community
• The Need for an Improved Water Supply System
• The EWB Process
• Preliminary Assessment Trip – July 2009
• Design Options
![Page 3: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/3.jpg)
Las Delicias, El SalvadorLas Delicias, El Salvador
Las Delicias
![Page 4: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/4.jpg)
Las Delicias, El SalvadorLas Delicias, El Salvador• Community Facts
– ~600 homes, 3000 residents– 15 miles NW of San Salvador– On Western Slopes of Volcan San
Salvador– Homes Spread Out, but Las Delicias is
Bordered by Several Similar Communities
– Water Storage & Piping System installed 20 years ago With Water Delivery by Truck
– Well and Pump Installed < 5 years ago– Residents are Poor (<$10/week
income)– Community Well-Organized through
Adesco and local NGO– Able to spend about $5 per household
on water each month
Project History • Project FIAT has been active in Las Delicias for > 5 years• Initial Contact with Project FIAT
January 2009• Application to EWB-USA
March 2009• Project Approved
May 2009• Preliminary Assessment Visit
July 2009• Assessment Trip
April 2010
![Page 5: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/5.jpg)
![Page 6: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/6.jpg)
The ProblemThe Problem: Water Supply : Water Supply in Las Delicias is:in Las Delicias is:
• Unreliable
• Inequitable
• Questionable Quality
A Culture of Scarcity exists that leads to hoarding
![Page 7: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/7.jpg)
A process to achieve a goal.A process to achieve a goal.
• Goal: Provide clean potable water to everyone in the community of around 5000 people.
• Identify Challenges & Evaluate Options to reach the goal.
• Gather an appropriate team.
• Evaluate design alternative and Develop an implementation plan.
![Page 8: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/8.jpg)
Las Delicias Project History• Initial Contact with Project FIAT
• January 2009• Application to EWB-USA
• March 2009• Project Approved
• May 2009• Preliminary Assessment Visit
• July 2009• Assessment Trip
• April 2010
![Page 9: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/9.jpg)
San Salvador
Project FIAT Guest House
Preliminary Assessment Trip Preliminary Assessment Trip to Las Delicias, July 2009to Las Delicias, July 2009
Las Delicias
![Page 10: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/10.jpg)
Three Days Exploring Las Delicias Three Days Exploring Las Delicias Water SystemWater System
![Page 11: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/11.jpg)
Las Delicias Community Map with Piping System
• Pump Runs 6 Hours a day. • Pump puts out about 150
GPM.• Depending on the time of year
pump will run a max. of 5 days
![Page 12: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/12.jpg)
![Page 13: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/13.jpg)
Flow testFlow test Tank Flowrate Calculations
Tank Tank 1 Tank 3D (m) 6.48 6.65H (m) 3.73 3.58A (m2) 32.95 34.78V (m3) 123.02 124.52
delta t (min) 15.25 11.00delta L (m) 0.20 0.13Flow (m3/min) 0.44 0.40Flow (gal/min) 115.99 106.10
** Tank 1 was receiving flow by gravity from mountain during pump test
• Meter at well-head indicated about 150 GPM
![Page 14: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/14.jpg)
Meeting with Community CouncilMeeting with Community Council
![Page 15: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/15.jpg)
Assessment Trip to Las Delicias Assessment Trip to Las Delicias Planned for Spring 2010Planned for Spring 2010
GOALS of Assessment Trip
• Evaluate failure of well riser pipe to improve design and reduce frequency of replacements.
• Evaluate spring source and supply lines between spring and storage tanks to determine potential for increasing yield.
• Measure water quality indicators at several source points (well source, spring source)
• Discuss design options with community such as point-of-use water treatment systems, water meters, automatic water shut-off valves on household pilas.
• Initiate community health assessment.• Meet with engineers who installed well or water
authorities to find well information. Determine local codes and identify regulatory agencies.
• Measure elevations of critical distribution points in water system.
![Page 16: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/16.jpg)
EWB impacts their lives EWB impacts their lives
• Provides professional resources to help resolve problems facing poor communities in developing countries.
• EWB members dedicate their TIME and skills.
• Have a genuine concern for their neighbors.
• Have said yes to a call for help.
![Page 17: Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler](https://reader036.vdocuments.us/reader036/viewer/2022062618/5513ec0e5503463a298b5dab/html5/thumbnails/17.jpg)
Las Delicias Pre-Assessment Las Delicias Pre-Assessment SummarySummary
• Pumps, piping, and storage systems are operational• Distribution of water to households is inequitable
– Some houses receive water daily– Others receive water once per week– A culture of scarcity exists leading to hoarding water when
it is available• Chlorine treatment occurs on effluent from storage
tanks• Anecdotal evidence of pipe failures
– Corrosion of pipes in well– Failure of unions in PVC at high flowrates– Old pipes are “brittle”
• Community financial system is well established