ARENA: We’re into wind
Lara Olsen
Head of Strategy
Australian Wind Energy Conference
![Page 2: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/2.jpg)
Contents
1. Snapshot of ARENA
2. Challenges
3. Opportunities
- Off-grid, fringe-of-grid
- Community renewables
![Page 3: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/3.jpg)
3
ARENA Core Objectives
1. Improve
competitiveness
of renewable energy
technologies
2. Increase
supply
of renewable energy
Proposed$
2.5 billion
in
funding to
2022
![Page 4: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/4.jpg)
4
ARENA – technology neutral, focused on pre-commercial technologies
Knowledge Sharing Collaboration and Engagement
Regional Australia’s Renewables
Emerging Renewable Program
Advanced Biofuels
Identifying Australia’s Top R&D -
includes solar & non-solar technologies
Integrating Renewables in the Grid
Renewables through Hybridisation
Ongoing and referred projects (including Big Solar projects)
Open Programs Programs announced in latest investment plan – still to be launched
Accelerated Step Change Initiative
Renewable Energy Venture Capital Fund
Research & Development
Demonstration Commercialisation
ARENA’s Programs
![Page 5: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/5.jpg)
5
>7700GWh of electricity –1 million homes
3.4% Australia’s overall energy needs
>$5 billion investment in Australia since 2001
For every 50 MW in capacity:
• 48 direct construction jobs
• 5 ongoing staff for operations
• ~$25,000 spent by each worker in the
local area annually
• 160 local workers employed during the
construction phase
Wind success
Infigen 189MW Capital Renewable Energy Precinct
![Page 6: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/6.jpg)
6
But wind is facing challenges… from the community…
![Page 7: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/7.jpg)
7
…And uncertainty due to policy changes
• RET review
• Energy White Paper
• Emissions Reduction Fund
• Direct Action
![Page 8: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/8.jpg)
8
However
![Page 9: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/9.jpg)
9 Source: AECOM, BREE, Geoscience Australia
![Page 10: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/10.jpg)
10
• 9.2 MW, four E-70 Enercon 2.3 megawatt turbines
• Provides 7% of mine’s energy needs, peaking at 58%
• Reduced diesel consumption by 10%
• Reduces 100 fuel loads per winter
• Payback time: 8 years
Industry use – example: Diavik diamond mine
Source: Rio Tinto, media releases
![Page 11: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/11.jpg)
11
Regional Australia’s Renewables – Industry (I-RAR)
More information in the I-RAR fact sheet
and manual at www.arena.gov.au
OBJECTIVES:
• Grow a portfolio of RE solutions in
regional and remote Australia
• Focus on hybrid and integrated
systems in off-grid and fringe-of-grid
communities
• Contribute to knowledge sharing and skills
development, especially in
regional and remote areas
demonstration deployment
![Page 12: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/12.jpg)
12
Regional Australia’s Renewables – Community and Regional Renewable Energy (CARRE)*
*CARRE works directly with off-grid energy
suppliers (not the broader community).
More information in the CARRE fact sheet
and manual at www.arena.gov.au
OBJECTIVES:
• Demonstrate viability and reliability
of RE systems in grids for small
communities and islands
• Grow RE supporting technologies
• Show commercial viability
• Contribute to knowledge sharing
demonstration deployment
![Page 13: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/13.jpg)
13
• 100+ wind co-ops own 75% of
Denmark’s wind turbines
• 51% Germany’s installed RE
capacity community owned
• UK only 60MW currently, with
predictions for >5GW by 2020
And also on-grid through the community ownership models….
• Hepburn Wind Farm (Vic) -
4.1 MW, power 2300 homes
• Denmark farm (WA)
• 40 in development
Hybrid:
• Coonooer Bridge wind farm
(Vic) – 5 turbines, 10,900
homes
• Share scheme
• First Victorian wind farm
approved since 2011 changes
to permitting
International Strength With Bright Spots in Australia
Source: news reports, websites, Reneweconomy, respubliblica
![Page 14: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/14.jpg)
14
ARENA: Supporting community energy strategy
UTS: Community energy strategy - $266,280 project
• Financing and business models
• Skills requirements
• Regulatory and policy barriers
• Sharing lessons learned
An ARENA Emerging Renewables Measure
![Page 15: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/15.jpg)
15
We’re into wind but we need you
Apply
Provide
Input
Apply Expressions of Interest for Regional
Australia Renewables close Dec 31
Provide your input on consultations, draft General Funding
Strategies
![Page 16: Lara Olsen, Arena: Powering renewable energy in Australia](https://reader035.vdocuments.us/reader035/viewer/2022062319/55898e19d8b42a75198b45ad/html5/thumbnails/16.jpg)
arena.gov.au
Thank you