Download - Ken gen ppp seminar presentation
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
1
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
No part of this report may be circulated, quoted, or reproduced for distribution without prior written approval from KenGen. All the information contained herein was prepared for information only.
CONFIDENTIAL
Disclaimer:
17 May 2012 - Nairobi, Kenya
Eddy Njoroge, MD&CEO of KenGen
Public-Private Partnership KenGen Proposed Models and Projects
Structured Finance - PPP
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
2
KenGen Proposed PPP Models2
KenGen’s Proposed Phase I: PPP Projects3
OUTLINE:
Background
Discussions4
1
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
3
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
4
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
5
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
6
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
7
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
8
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
9
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
10
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
11
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
12
Financing KenGen’s Olkaria I & IV 280MW Flagship Projects
Source: KenGen;
With Drilling Costs
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
13
Financing KenGen’s Olkaria I & IV 280MW Flagship Projects
Source: KenGen;
Without Drilling Costs
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
14
KenGen Proposed PPP Models2
KenGen’s Proposed Phase I: PPP Projects3
OUTLINE:
Background
Discussions4
1
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
15
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
16
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
17
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
18
CONFIDENTIAL
Document
Date
This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. This material was used by McKinsey & Company during an oral presentation; it is not a complete record of the discussion.
Working Draft Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
Printed 12/03/2007 15:47:35 South Africa Standard Time
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
19
KenGen Proposed PPP Models2
KenGen’s Proposed Phase I: PPP Projects3
OUTLINE:
Background
Discussions4
1
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
20
Phase I: PPP Project: Muhoroni 80MW Power PlantBOT – Build Operate TransferPPA – Power Purchase Agreement
3
Source: KenGen; TMO
Project Description
1.Name: Muhoroni Thermal Power Plant
2.Capacity: 80MW
3.Estimated Cost: US$ 100 million
4.Economic Life: 20 years
5.Mode: Thermal –Heavy Fuel Oil (HFO)
6.Expected PPP: BOT (Vendor Financing…)
7.Location: Western Kenya
8.Status: 1. Tender documents under preparation2. PPA being prepared
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
21
Phase I: PPP Project: Olkaria V 140MW Power PlantBOT – Build Operate TransferPPA – Power Purchase Agreement
3
Source: KenGen; TMO
Project Description
1.Name: Olkaria V Power Plant
2.Capacity: 140MW
3.Estimated Cost: US$ 500 million (~US$ 200m for Power Plant only)
4.Economic Life: 25 years
5.Mode: Geothermal
6.Expected PPP: Joint Venture through an SPV (Special Purpose Vehicle…)
7.Location: Naivasha, Kenya
8.Status: 1. Drilling and Steam Optimization Study -
Completion 20122. PPA being prepared
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
22
Phase I: PPP Project: Isiolo Wind Power PlantBOT – Build Operate TransferPPA – Power Purchase Agreement
3
Source: KenGen; TMO
Project Description
1.Name: Isiolo Wind Power Plant
2.Capacity: 150 MW (Phase I: 50MW plus Phase II: 100MW)
3.Estimated Cost: US$ 400 million (Phase I: US$ 130 plus Phase II: US$ 270MW)
4.Economic Life: 20 years
5.Mode: Wind
6.Expected PPP: Joint Venture through an SPV (Special Purpose Vehicle…)
7.Location: Isiolo, Northern Kenya
8.Status: 1. Feasibility Study Completed
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
23
Phase I: PPP Project: Liquefied Natural Gas (LNG) Power PlantBOT – Build Operate TransferPPA – Power Purchase Agreement
3
Source: KenGen; TMO
Project Description
1.Name: LNG Power Plant
2.Capacity: 495 MW
3.Estimated Cost: US$ 686 million
4.Economic Life: 20 years
5.Mode: Natural Gas (imported)
6.Expected PPP: BOT
7.Location: Dongo Kundu, Mombasa Kenya
8.Status: 1. Feasibility Study Completed
Unit of measure
* FootnoteSource: Source
Working Draft - Last Modified 06/01/2008 08:33:51
Printed 12/03/2007 15:47:35
24
Phase I: PPP Project: Coal Power PlantBOT – Build Operate TransferPPA – Power Purchase Agreement
3
Source: KenGen; TMO
Project Description
1.Name: Coal Power Plant
2.Capacity: 600 MW
3.Estimated Cost: US$ 1,665 million
4.Economic Life: 20 years
5.Mode: Coal (imported)
6.Expected PPP: Joint Venture through an SPV (Special Purpose Vehicle…)
7.Location: Kilifi, Mombasa Kenya
8.Status: 1. Feasibility Study Completed