Cost Benefit of Pre‐Dredging Investigations
By Keith GrayApril 5, 2012
1
![Page 2: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/2.jpg)
“An expert is a person who has made all the mistakes in a very narrow field.”Niels Bohr
2
![Page 3: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/3.jpg)
3
![Page 4: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/4.jpg)
4
![Page 5: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/5.jpg)
“All we have in the budget is $7,500 –Do what you can.”
5
![Page 6: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/6.jpg)
Budget• Operator $75/hr. X 9 hrs. → $675• Labor $55/hr. X 9 hrs. → $495• Machine (Day rate) → $900• Dewatering bag → $400/day• Total → $2,470/day
No mob/de‐mobLet sediment dry, spread it,seed it
3 Days!
6
![Page 7: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/7.jpg)
7
![Page 8: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/8.jpg)
8
![Page 9: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/9.jpg)
9
![Page 10: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/10.jpg)
What did it cost us beyond 3 days of activity?
10
Truxor: 3 days @ $2,500/day = $7,500
![Page 11: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/11.jpg)
• Labor to cut bag and spread $200• Bobcat rental $300• Tow truck for bobcat $140• Silt fence $200• Labor $300Total $1,140
11
![Page 12: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/12.jpg)
• Bobcat rental (Day 2) $300• Labor $300• Grass / cover crop seed $60Total $660
12
![Page 13: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/13.jpg)
• Top soil $200• Seed $60• Labor $260
Total $520
13
![Page 14: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/14.jpg)
• Goose protection fencing $160• Seed $60• Labor $280
Total $500
14
![Page 15: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/15.jpg)
• 1st try by hand $200• 2nd try (Bobcat) $1,140• 3rd try (Bobcat V‐2) $660• 4th try (Top soil) $520• 5th try (Goose fencing) $500
Total $3,020
15
![Page 16: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/16.jpg)
Spring 2013
16
![Page 17: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/17.jpg)
“I thought you’d have removed a lot more than that for $7,500!”
17
![Page 18: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/18.jpg)
Mistakes Made
• Understand the material you are working with:–Removal rate–Material handling–Wet vs. dry volumes
18
![Page 19: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/19.jpg)
Mistakes Made
• Consider secondary use & associated costs:–Will it support growth?–Will it dry?–Will it erode easily?–Contaminated?
19
![Page 20: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/20.jpg)
Mistakes Made
• Establish realistic client expectations:–Volume–Appearance–Project duration
20
![Page 21: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/21.jpg)
“Learn from others mistakes. You don’t live long enough to make them all yourself.”
Eleanor Roosevelt
21
![Page 22: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/22.jpg)
How much to dredge my pond?
22
![Page 23: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/23.jpg)
Dredging Feasibility Study
$1,500 to $10,000
23
![Page 24: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/24.jpg)
“Just tell me how much sediment I have”
“We want as much of our money to go into removing sediment as possible.”
24
![Page 25: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/25.jpg)
Bathymetric Map
25
![Page 26: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/26.jpg)
26
![Page 27: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/27.jpg)
27
15,600 CY
![Page 28: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/28.jpg)
15,600 CY X $20 ‐ $40/CY = $300,000 to $600,000
28
![Page 29: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/29.jpg)
29
![Page 30: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/30.jpg)
Other Costs:
• Disposal• Loading• Analysis• Repair to work areas• Permits• Bonding
30
![Page 31: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/31.jpg)
31
![Page 32: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/32.jpg)
Dredging Feasibility Study:
• Understand the goals/needs of the client.• Evaluate the options to achieve clients needs.
I. Recreation Boating swimming
II. Water Quality Plants Algae clarity
32
III. Fishery Habitat Depth
![Page 33: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/33.jpg)
33
![Page 34: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/34.jpg)
34
Main Inlet 2.8 acresSediment Mapped Area Avg. thickness Volume Percentthickness ft2 ft ft3 of volume5 ft + 2,049 5.3 10,858 8.2%4 ‐ 5 ft 929 4.5 4,181 3.2%3‐ 4 ft 2,122 3.5 7,428 5.6%2 ‐ 3 ft 10,157 2.5 25,394 19.2%1 ‐ 2 ft 29,967 1.5 44,950 34.0%0 ‐ 1 ft 78,516 0.5 39,258 29.7%
132,069 total volume ft3
4,891 cubic yards
![Page 35: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/35.jpg)
47,861 ft3 = 1,773 CY @ $50/CY = $88,000+ Hauling and disposal$160/load x 90 loads = $14,400
~ $100,000
35
![Page 36: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/36.jpg)
Pre‐Dredging Investigation Benefits:
• Determine sediment distribution• Determine sediment type
– secondary use– Disposal– compaction
• Identify high priority areas• Identify source of sediment
36
![Page 37: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/37.jpg)
Pre‐Dredging Investigation Benefits:
• Determine the most effective method of removal (hydraulic, wet mechanical, dry mechanical).
• Identify qualified contractors and use information gathered to create a bid package.
• Options for removed sediment.
37
![Page 38: Keith Gray, ILM](https://reader033.vdocuments.us/reader033/viewer/2022052300/589d8c7c1a28aba94a8bb18f/html5/thumbnails/38.jpg)
“Dredging Feasibility Study”
A good investment.
38