Transcript
Page 1: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

John Bradley

CEO, ENA

Page 2: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

Australia’s Great Energy Disruption

Page 3: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

Australia’s Great Energy Disruption

Page 4: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

The Network Transformation Roadmap

Page 5: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

The Network Transformation Roadmap

Page 6: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

The Network Transformation Roadmap

Page 7: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

Five Domains to Enable the Transition…

Page 8: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

Key Milestones

Page 9: John Bradley CEO, ENA · 300 200 100 PROJECTED CUMULATIVE SYSTEM COST BY 2050 Off-grid (advanced metering and control, storage, disconnected generation) Connected on-site generation

Collaboration and Co-Design


Top Related