JERSEY FUTURE HOSPITAL
CO004 – SITE OPTION REPORT
APPENDIX 4 Site Appraisal Plans
April 2015
QUALITY ASSURANCE
Sign off: Kieren Morgan
Position: Principal:
_ Jersey General Hospital Site
_ Site Analysis
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
Electrical
S3 - Final Preliminary Issue
237035 SK-E-OPTA-001 P2
Jersey Future Hospital
States of Jersey
Option A - Existing Site ExistingElectrical Infrastructure
P2
P1
20/03/15Final Preliminary Issue
13/02/15For Internal Review and Comments
DF
DF
PT
PT
DP
DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
OPTION A - DUAL SITE | EXISTING GENERAL HOSPITAL SITE Existing JEC HV route
Notes:
1. Removal / relocationof existing JECequipment to bedeveloped followingreceipt of informationfrom JEC andarchitectural phasingplans.
LV switchgear servingbuilding (existing)
Hospital HV / LVSubstation /Transformers (existing)
Hospital HV Route
Hospital LV Route
Hospital LV BuildingInterconnections
Block A
Block BBlock C
Block D
Block H
Block E
Block F
Block G
JEC HV Switchgear(existing)
Generator Compound(existing)
Role
Legend
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
Mechanical
237035 SK-M-OPTA-001 P4
Jersey Future Hospital
States of Jersey
Option A - Existing Site Existing Mechanical Equipmentand Infrastructure
P1 13/02/15For Internal Review and Comments
AH PT DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Block A
Block B
Block C
Block D
Block E
Block F
Energy Centre(existing)
HWS CalorifierPlantrooms(existing)
Heating DistributionRoute (existing)
Below ground JerseyWater main (existing)
Below ground JerseyGas main (existing)
PSA OxygenGeneration plantroom (existing)
Medical Gasesplantroom (existing)
Chiller / CoolingPlantrooms(existing)
Cold WaterStorage Tanks(existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Legend
S3 - Final Preliminary Issue
Role
P4
P3
P220/03/15 AH PT DPFinal Preliminary Issue
08/04/15 AH PT DPFinal Preliminary Issue
02/04/15 AH PT GWFinal Preliminary Issue
Air Handling andVent Plant (existing)
Notes:
1. Blue denotesproposed site boundary
2. Below ground mainswater servicesbackground provided byJersey Water
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
237035 SK-M-OPTA-006 P1
Jersey Future Hospital
States of Jersey
Option A Existing Site Existing Mains Water Layout
P1 20/03/15 Final Preliminary Issue
AH PT DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Legend
MechanicalRole
S3 - Final Preliminary Issue
Notes:
1. Blue denotesproposed site boundary
2. Below ground mainswater servicesbackground provided byJersey Water
Jersey Water supply tobe retained. Noupgrades required
Jersey Water supply to beretained and modified tosuit new building layout
Jersey Water supply to beretained and modified tosuit new building layout
Jersey Water supply to beretained and modified tosuit new building layout
Jersey Water supplyto be retained. Noupgrades required
Jersey Water supplyto be retained. Noupgrades required
_ Overdale Site
_ Site Analysis
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
Electrical
S3 - Final Preliminary Issue
237035 SK-E-OPTA-003 P2
Jersey Future Hospital
States of Jersey
Option A - Overdale ExistingElectrical Infrastructure
P2
P1
20/03/15Final Preliminary Issue
13/02/15For Internal Review and Comments
DF
DF
PT
PT
DP
DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
JEC 11kV Network
JEC LV Network
Existing Overdale HospitalJEC Substation1 No. 800kVA JECTransformerContains 3 No. outgoing LVsupplies to Overdale Hospitaland 2 No. LV supplies for JECLV Network.Substation to remain.
Hospital LV Network
Existing Ocean HotelJEC Substation (tobe retained)
Domestic LV Supply
400A supply to boiler housesupplied from remote JECsubstation. Supply to beremoved as part of works.
Notes:
1. Existing hospital sitein ground infrastructureroutes to be provided bySoJ to assess impact ofworks. Informationrequested.
2. Implications ofdemolishing boiler houseto be discussed withJEC.
3. Existing in-groundinfrastructure servingbuildings to bedemolished to beremoved back to source.
Role
Legend
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
237035 SK-M-OPTA-002 P3
Jersey Future Hospital
States of Jersey
Option A - Overdale SiteExisting Mechanical Equipmentand Infrastructure
P1 13/02/15For Internal Review and Comments
AH PT DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Existing RedundantBoiler Plantroom
Existing BoilerPlantroom
Existing BoilerPlantroom
Existing BoilerPlantroom
Boiler Plantroom(existing)
Below groundmains water(existing)
HeatingDistributionRoute(existinglocated inservice duct)
Legend
S3 - Final Preliminary Layout
Role Mechanical
P2 20/03/15 AH PT DP Final Preliminary Layout
Existing BoilerPlantroom
P3 08/04/15 AH PT DP Final Preliminary Layout
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
237035 SK-M-OPTA-005 P1
Jersey Future Hospital
States of Jersey
Option A Overdale Existing Mains Water Layout
P1 20/03/15 Final Preliminary Issue
AH PT DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Legend
Mechanical
S3 - Final Preliminary Issue
Notes:
1. Blue denotesproposed site boundary
2. Below ground mainswater servicesbackground provided byJersey Water
Jersey Water supply fromWestmount tanks to be be upgraded
Jersey Water supply to bemodified to suit newbuilding layout
Jersey Water supply to beextended to supply newbuilding layout
Jersey Water supplyto be retained
New Jersey Water supplyconnections to be carriedout at this location to servenew 1no. energy centre
New Jersey Water supplyconnections to be carriedout at this location to servenew building and 1no.energy centre
Role
Jersey Water supply fromWestmount tanks to be upgraded
Jersey Water supplybranch connection tobe retained
Jersey Water supplybranch connection tobe retained
_ Overdale Site
_ Site Analysis
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
Electrical
S3 - Final Preliminary Issue
237035 SK-E-OPTA-003 P2
Jersey Future Hospital
States of Jersey
Option A - Overdale ExistingElectrical Infrastructure
P2
P1
20/03/15Final Preliminary Issue
13/02/15For Internal Review and Comments
DF
DF
PT
PT
DP
DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
JEC 11kV Network
JEC LV Network
Existing Overdale HospitalJEC Substation1 No. 800kVA JECTransformerContains 3 No. outgoing LVsupplies to Overdale Hospitaland 2 No. LV supplies for JECLV Network.Substation to remain.
Hospital LV Network
Existing Ocean HotelJEC Substation (tobe retained)
Domestic LV Supply
400A supply to boiler housesupplied from remote JECsubstation. Supply to beremoved as part of works.
Notes:
1. Existing hospital sitein ground infrastructureroutes to be provided bySoJ to assess impact ofworks. Informationrequested.
2. Implications ofdemolishing boiler houseto be discussed withJEC.
3. Existing in-groundinfrastructure servingbuildings to bedemolished to beremoved back to source.
Role
Legend
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
237035 SK-M-OPTB-003 P2
Jersey Future Hospital
States of Jersey
Option B - Overdale SiteExisting Mechanical Equipmentand Infrastructure
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Existing RedundantBoiler Plantroom
Existing BoilerPlantroom
Existing BoilerPlantroom
Existing BoilerPlantroom
Boiler Plantroom(existing)
Below groundmains water(existing)
HeatingDistributionRoute(existinglocated inservice duct)
Legend
S3 - Final Preliminary Layout
RoleMechanical
P1 20/03/15 AH PT DP Final Preliminary Layout
Existing BoilerPlantroom
P2 08/04/15 AH PT DP Final Preliminary Layout
_ Jersey General Hospital Site
_ Site Analysis
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
Electrical
S3 - Final Preliminary Issue
237035 SK-E-OPTA-001 P2
Jersey Future Hospital
States of Jersey
Option A - Existing Site ExistingElectrical Infrastructure
P2
P1
20/03/15Final Preliminary Issue
13/02/15For Internal Review and Comments
DF
DF
PT
PT
DP
DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
OPTION A - DUAL SITE | EXISTING GENERAL HOSPITAL SITE Existing JEC HV route
Notes:
1. Removal / relocationof existing JECequipment to bedeveloped followingreceipt of informationfrom JEC andarchitectural phasingplans.
LV switchgear servingbuilding (existing)
Hospital HV / LVSubstation /Transformers (existing)
Hospital HV Route
Hospital LV Route
Hospital LV BuildingInterconnections
Block A
Block BBlock C
Block D
Block H
Block E
Block F
Block G
JEC HV Switchgear(existing)
Generator Compound(existing)
Role
Legend
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
Mechanical
237035 SK-M-OPTA-001 P3
Jersey Future Hospital
States of Jersey
Option A - Existing Site Existing Mechanical Equipmentand Infrastructure
P1 13/02/15For Internal Review and Comments
AH PT DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Block A
Block B
Block C
Block D
Block H
Block E
Block F
Energy Centre(existing)
HWS CalorifierPlantrooms(existing)
Heating DistributionRoute (existing)
Below ground JerseyWater main (existing)
Below ground JerseyGas main (existing)
PSA OxygenGeneration plantroom (existing)
Medical Gasesplantroom (existing)
Chiller / CoolingPlantrooms(existing)
Cold WaterStorage Tanks(existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Air Handling andVent Plant (existing)
Legend
S3 - Final Preliminary Issue
Role
P3
P220/03/15 AH PT DPFinal Preliminary Issue
02/04/15 AH PT GWFinal Preliminary Issue
Notes:
1. Blue denotesproposed site boundary
2. Below ground mainswater servicesbackground provided byJersey Water
A3 A B C D E F
1
2
3
4
6
© Arup
Issue Date By Chkd Appd
Client
Job Title
Drawing Status
Job No Drawing No Issue
Scale at A3
G
5
Level 17, 1 Nicholson StMelbourne, Victoria, 3000
Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au
Arup Pty LtdABN 18 000 966 165
Drawing Status
_
NTS
237035 SK-M-OPTA-006 P1
Jersey Future Hospital
States of Jersey
Option A Existing Site Existing Mains Water Layout
P1 20/03/15 Final Preliminary Issue
AH PT DP
4 Pierhead St, Capital Waterside
Cardiff, CF10 4QP
T +44(0)29 20473727 F +44(0)29 20472277
www.arup.com
Legend
MechanicalRole
S3 - Final Preliminary Issue
Notes:
1. Blue denotesproposed site boundary
2. Below ground mainswater servicesbackground provided byJersey Water
Jersey Water supply tobe retained. Noupgrades required
Jersey Water supply to beretained and modified tosuit new building layout
Jersey Water supply to beretained and modified tosuit new building layout
Jersey Water supply to beretained and modified tosuit new building layout
Jersey Water supplyto be retained. Noupgrades required