IS Development Methods, Techniques and Tools
2 – BPR, CMM, PM
Ch. 4.3- BPRCh 23.3- CMM
Ch 14 - PM
![Page 2: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/2.jpg)
1. Structured methodologies : SDLC (ch. 3)2. Process methodology : YOURDON (19.2)3. Data methodologies : SSADM (20.1)4. Organizational meth. 1 : BPR (4.3)5. Organizational meth. 2 : CMM (25.3)6. Project mgt techniques (14)7. Evolutionary development 1 : engineering (6)8. Evolutionary development 2 : RAD (22.1)9. Evolutionary development 3 : DSDM (22.2)10.Holistic techniques : Rich pictures (10.1)11.People techniques 1 : stakeholders (16.1)12.People techniques : JAD (10.2)13.People-oriented meth. : ETHICS (23.1)14.Contingency meth. : MULTIVIEW (25.1)
IS DEVELOPMENT METHODOLOGIES AND TECHNIQUES
![Page 3: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/3.jpg)
4- BPR
![Page 4: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/4.jpg)
Business process re-engineering (BPR)
The fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of
performance, such as cost, quality, service, and speed
(Hammer & Champy, 1993)
![Page 5: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/5.jpg)
Features of BPR 1 Re-engineering determines …
what an organisation should do how it should do it what the concerns should be ...
… NOT what they currently are Radical change NOT gradual
change
![Page 6: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/6.jpg)
The Euphoria ‘Don’t automate, obliterate’ ‘Sweep away job definitions’ ‘Break loose from outmoded thinking’ Conventional change is like ‘rearranging
the deck chairs on the Titanic’ The solution to ‘bloated, clumsy, rigid,
sluggish, non-competitive, uncreative, disdainful of their customers’ needs, and losing money’ (Hammer and Champy)
![Page 7: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/7.jpg)
BPR covers jobs structure values beliefs management measurement systems in addition to process redesign
![Page 8: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/8.jpg)
Features of BPR 2 IT seen as an important enabler of
change NOT a key driver of change
![Page 9: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/9.jpg)
Process Innovation (Davenport 1993)
Develop the business vision and process objectives
Identify the processes to be redesigned Understand and measure the existing
process Identify the IT levers Design and build a prototype of the new
process
![Page 10: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/10.jpg)
Framework of BPR (Melao and Pidd,
2000)
![Page 11: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/11.jpg)
1. Structured methodologies : SDLC (ch. 3)2. Process methodology : YOURDON (19.2)3. Data methodologies : SSADM (20.1)4. Organizational meth. 1 : BPR (4.3)5. Organizational meth. 2 : CMM (25.3)6. Project mgt techniques (14)7. Evolutionary development 1 : engineering (6)8. Evolutionary development 2 : RAD (22.1)9. Evolutionary development 3 : DSDM (22.2)10.Holistic techniques : Rich pictures (10.1)11.People techniques 1 : stakeholders (16.1)12.People techniques : JAD (10.2)13.People-oriented meth. : ETHICS (23.1)14.Contingency meth. : MULTIVIEW (25.1)
IS DEVELOPMENT METHODOLOGIES AND TECHNIQUES
![Page 12: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/12.jpg)
5- CMM
![Page 13: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/13.jpg)
![Page 14: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/14.jpg)
![Page 15: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/15.jpg)
1. Structured methodologies : SDLC (ch. 3)2. Process methodology : YOURDON (19.2)3. Data methodologies : SSADM (20.1)4. Organizational meth. 1 : BPR (4.3)5. Organizational meth. 2 : CMM (25.3)6. Project mgt techniques (14)7. Evolutionary development 1 : engineering (6)8. Evolutionary development 2 : RAD (22.1)9. Evolutionary development 3 : DSDM (22.2)10.Holistic techniques : Rich pictures (10.1)11.People techniques 1 : stakeholders (16.1)12.People techniques : JAD (10.2)13.People-oriented meth. : ETHICS (23.1)14.Contingency meth. : MULTIVIEW (25.1)
IS DEVELOPMENT METHODOLOGIES AND TECHNIQUES
![Page 16: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/16.jpg)
6- Project Mgt
![Page 17: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/17.jpg)
Project management
Gantt charts Critical path or PERT analysis Monitoring
![Page 18: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/18.jpg)
time
Actions
PLANNING 1
![Page 19: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/19.jpg)
Gantt chart
![Page 20: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/20.jpg)
time
Actions
PLANNING 1
GanttLinear sequential
ANALYSIS
PLANNING
IMPLEMENTATION
CONTROL
![Page 21: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/21.jpg)
time
Actions
PLANNING 2
parallel, concurrent
ANALYSIS
PLANNING
IMPLEMENTATION
CONTROL
![Page 22: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/22.jpg)
time
Actions
PLANNING 2
ANALYSIS
PLANNING
IMPLEMENTATION
CONTROL
![Page 23: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/23.jpg)
PERT charts
![Page 24: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/24.jpg)
Project control
![Page 25: IS Development Methods, Techniques and Tools 2 – BPR, CMM, PM Ch. 4.3- BPR Ch 23.3- CMM Ch 14 - PM](https://reader036.vdocuments.us/reader036/viewer/2022062801/56649e385503460f94b290b5/html5/thumbnails/25.jpg)
Project control - monitoring