IRENA’s Power Generation Cost Analysis and
Geothermal
Geothermal: Competing With Other Renewable And Non-Renewable Technologies Webinar, 19 November 2013
19 November 2013
Michael [email protected]
IRENA Innovation and Technology Centre
![Page 2: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/2.jpg)
2
About IRENA
As of October, 2013
Members of the Agency Signatories/States in Accession
![Page 3: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/3.jpg)
3
1COST ANALYSIS….
WHY? HOW? WITH WHOM?
![Page 4: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/4.jpg)
Rationale and goals
• Renewable energy can meet policy goals for secure,
reliable and affordable energy and access.
• Lack of objective and up-to-date data is a barrier
• Decision making based on: outdated numbers, opinion
• IRENA to strive to become THE source for cost data
• Goals: Assist government decision-making, allow more ambitious policies
Fill a significant information gap
• Coverage:
Power generation (June 2012 and January 2013)
Road Transport (July 2013)
Stationary applications (2014) 4
![Page 5: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/5.jpg)
RENEWABLE POWER
GENERATION 2012
5
2
![Page 6: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/6.jpg)
Key findings
6
• Renewables now THE economic solution off-grid and for
mini-grids, increasingly competitive for grid supply
• A shift in policy focus will need to come
• Dramatic price reductions for Solar PV. Onshore wind
competitive at best sites, CSP has great potential.
Hydropower, geothermal and biomass more mature
• Equipment cost declines and technology improvements
LCOEs are falling
• Data collection poses challenges
• Why isn’t data systematically collected from support policies?
![Page 7: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/7.jpg)
LCOE ranges and averages
7
![Page 8: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/8.jpg)
Levelised cost of electricity by country/region
8Note: assumes a 10% cost of capital
![Page 9: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/9.jpg)
Geothermal:Installed costs have been rising
© IRENA 2013 9Source: IPCC, 2011
![Page 10: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/10.jpg)
Total installed costs of geothermalprojects in Chile, Indonesia, Kenya, Mexico and the Philippines
© IRENA 2013 10Ex ante data, but what about ex post?
![Page 11: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/11.jpg)
Geothermal competiveness
• Well defined resources of high quality can deliver highly
competitive electricity
• Capital costs have been rising with commodity prices and
engineering costs
• Risk profile is very different to other renewable
technologies
• Many factors at play in determining the costs of a project
• Dedicated policy framework is essential to ensuring
geothermal projects not disadvantaged
11
![Page 12: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/12.jpg)
PLANS FOR
THE IRENA RENEWABLE COSTING ALLIANCE
12
3
![Page 13: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/13.jpg)
Rationale and Plans
• Analysis to date has been based on low hanging fruit
• Engage with business: The Alliance will work at a technical
level on data and its availability
• Alliance members share, confidentially, their data on real
world project costs
• Entirely voluntary, we work together for mutual benefit
• Establishment period now, offical launch at Assembly
• Goals:
more data, better data, a greater focus on analysis of
data
13
![Page 14: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/14.jpg)
Structure
Member countries: Steering group for costing analysis focus One workshop a year Must nominate institution to deliver data Quarterly newsletter
Alliance Members: Provide data, confidentially One workshop a year Ability to query the database in detail Quarterly newsletter
Observers: Quarterly newsletter Mailing list for new publications/analysis 14
![Page 15: IRENA’s Power Generation Cost Analysis and Geothermal Power](https://reader034.vdocuments.us/reader034/viewer/2022051323/54971485b479595b4d8b512e/html5/thumbnails/15.jpg)
Renewables are increasingly competitive, but more needs tobe done to fulfill their potential…
15
www.irena.org/costs
IRENA is part of the solution