IPPC implementation in Poland – special focus on public
participation in process of issuing IPPC permits
INFRA 32645 Ankara, Turkey 5-6 November 2009 Artur Dąbrowski
![Page 2: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/2.jpg)
2
INDEX
Where I am from?Where I am from? General Info about IPPC in Poland Main steps in the implementation Public participation process Guidline for implementation as the
conclusion
![Page 3: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/3.jpg)
3
Geographical Location
Mazovia Region is located in middle-eastern part of Poland
Capital: Warsaw
![Page 4: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/4.jpg)
4
General Info about the Mazovia Region
Area: 35.559 km² (11,4% of Poland) Inhabitants: 5.139.000 (13,5% of
Poland) Capital: Warsaw Municipalities: 314
![Page 5: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/5.jpg)
5
INDEX
Where I am from? General Info about IPPC in PolandGeneral Info about IPPC in Poland Main steps in the implementation Public participation process Guidline for implementation as the
conclusion
![Page 6: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/6.jpg)
6
Goal of IPPC Directive
to achieve integrated prevention and control of pollution arising from a wide
range of activities by means of measures to prevent or, where that is not
practicable, to reduce emissions from industrial facilities to air, water and land, including measures concerning waste, in
order to achieve a high level of protection of the environment as a whole
![Page 7: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/7.jpg)
7
Member States have to ensure that permits include all appropriate preventive measures are taken against
pollution in particular through the application of BAT no significant pollution is caused waste production is avoided; where waste is produced it
should be recovered or, where that is technically and economically impossible, disposed of while avoiding or reducing any impact on the environment
energy is used efficiently the necessary measures are taken to prevent accidents and
limit their consequences the necessary measures are taken upon definite cessation of
activities to avoid any pollution risk and return the site of operation to a satisfactory state.
![Page 8: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/8.jpg)
8
IPPC permit has to
Include emission limit values based on BAT Take into consideration potential for transfer of pollution
from one medium to another Protect soil and groundwater and establish conditions of
waste management if necessary Introduce supplementary requirements necessary to
prevent breaches of any environmental quality standard Be periodically reconsidered and updated
![Page 9: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/9.jpg)
9
Polish law concerning IPPC Environmental Protection Law Act on Introduction of the Acts -
Environmental Protection Law, the Waste Act and Amending Certain Acts
This laws came into force on 01.10.2001
( provisions transposing IPPC requirements on 01.01.2002)
![Page 10: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/10.jpg)
10
Executive orders
Delegation resulting from the previously mentioned acts
Regulation of 26.07.2002 of the MoE on the types of installations that cause considerable pollution of particular elements of nature and environment as a whole (transposition of Annex1)
Regulation of 04.11.2002 of the MoE on the registration fees
![Page 11: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/11.jpg)
11
Executive orders
Regulation of 08.04.2003 of the MoE on the types of installations for which the operators may apply for compliance programs
![Page 12: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/12.jpg)
12
General requirements
One integrated permit for all IPPC installations located at one site
Permit granted for a limited time – max. 10 years Regular review of the integrated permits (at least
every 5 years) Shut down of the installation operation – in case of
operating without permit Public participation in the permit issuing procedure Transboundary impact assessment
![Page 13: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/13.jpg)
13
Timetable requirements New installation – before starting
operating, Existing installation – not later than
31.10.2007 (Schedule for individual sectors are set in detail in Regulation of MoE of 26.09.2003)
![Page 14: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/14.jpg)
14
Transition period
Poland negotiated a 3 years transitional period extending the deadline for full compliance with BAT till 31.12.2010 for the following groups of installations:
municipal heat sources with a rated thermal input between 50 and 300 MW
municipal waste landfills receiving 10-20 tones per day 65 large installations implementing compliance
programs
![Page 15: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/15.jpg)
15
Institutions
The Competent Authority – Minister of Environment
Permit granting Authorities: Marshal of the Voivodeship (regional
administrators 16) for installation that can have a significant impact on environment, subject to a statutory requirement to provide a report concerning their impact on environment
Starost (county administrators 380) for other installation from Annex 1
![Page 16: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/16.jpg)
16
Institutions
Inspection Authority - Chief Inspectorate for Environmental Protection and 16 Voivod Inspectorates
Appeals Authority – Minister of Environment (for Marshals) and appeals boards (for starosts)
National BAT Center ( within the structure of MoE)- responsible for assembling and exchanging information on BAT and for running the applications and permits registers
![Page 17: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/17.jpg)
17
INDEX
Where I am from? General Info about IPPC in Poland Main steps in the implementationMain steps in the implementation Public participation process Guidline for implementation as the
conclusion
![Page 18: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/18.jpg)
18
Main steps in the implementation (1)
Establishing the BAT Center within the structure of Ministry of Environment
Creating IPPC website: www.ippc-ps.pl, link www.mos.gov.pl
Inventory of total number IPPC installations Preliminary in 2001 2332 Updated in 2003 1970
Under marshals competence 1116 Under starosts competence 854
![Page 19: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/19.jpg)
19
Main steps in the implementation (2)
Elaboration of guidelines and manuals Information on IPPC distributed at
conferences, seminars, trainings available also at website
The guideline for IPPC application The guideline for administration on
implementation Draft application form
![Page 20: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/20.jpg)
20
Main steps in the implementation (3)
English version of BREFs are available on website http://eippcb.jrc.es/.
On Polish website are displayed translation of BREFs into Polish BAT in the Cement and Lime Manufacturing Industries BAT in the Pulp and Paper Industry BAT in the Glass Manufacturing Industry BAT in the Non Ferrous Metals Industries BAT in the Chlor - Alkali Manufacturing industry BAT to Industrial Cooling Systems Reference Document on General Principles of
Monitoring BAT on the Production of Iron and Steel BAT in the Ferrous Metals Processing Industry
![Page 21: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/21.jpg)
21
Main steps in the implementation (4)
Establishment of Technical Working Groups for different IPPC sectors ( 2002)
to gather together representatives of industry, authorities, science, etc
to create forum of exchanging information on IPPC and BAT
to elaborate branches guidelines for specific sectors
![Page 22: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/22.jpg)
22
Main steps in the implementation (5)
Trainings for administration and conferences and seminars for industry
2001-3 training within the PHARE pilot projects,
2002-3 training for trainers and 2600 officials
Conferences co-organized by MoE Seminars for selected industrial sectors
by Technical Working groups of BAT Center
![Page 23: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/23.jpg)
23
Main steps in the implementation (6)
PHARE/DISAE project POL-102 with GB (1998-9)
Twinning PHARE 1998 with France (1999-2001)
Twinning PHARE 1999 with Netherlands and GB (2000-2)
Twinning PHARE 2000 with Spain and Denmark
Bilateral project with Denmark (2003-4)
![Page 24: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/24.jpg)
24
Main steps in the implementation (7)
Strengthening of administration Developing BAT Center and continuing its work on
BREFs Disseminating of Guidelines Updating IPPC website Providing industry with relevant information Performing the pre-inspection to determine the progress
in delivering application and effectiveness of permit granting procedure
Integrating existing national databases in accordance with EPER requirements
Join process of elaboration of the BREFs by EIPPCB in Seville
![Page 25: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/25.jpg)
25
INDEX
Where I am from? General Info about IPPC in Poland Main steps in the implementation Public participation processPublic participation process Guidline for implementation as the
conclusion
![Page 26: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/26.jpg)
26
Public participation in the original Directive 96/61/EC
„(…)Member States shall take the necessary measures to ensure that applications for permits for new installations or for substantial changes are made available for an appropriate period of time to the public, to enable it to comment on them before the competent authority reaches its decision.
That decision, including at least a copy of the permit, and any subsequent updates, must be made available to the public.”
„The results of monitoring of releases as required under the permit conditions (…) held by the competent authority must be made available to the public.”
![Page 27: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/27.jpg)
27
Directive 2003/35/EC
Directive 2003/35/EC (covers public participation in drawing up certain plans and programmes) and updates provisions on public participation in permitting procedures at national level under Environmental Impact Assessment (EIA) and IPPC, and introduces access to justice rules.
![Page 28: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/28.jpg)
28
Amendments to Directive 96/61/EC from Directive 2003/35/EC – new definitions
„The public” shall mean one or more natural or legal persons and, in accordance with national legislation or practice, their associations, organisations or groups;
„The public concerned” shall mean the public affected or likely to be affected by, or having an interest in, the taking of a decision on the issuing or the updating of a permit or of permit conditions; for the purposes of this definition, non-governmental organisations promoting environmental protection and meeting any requirements under national law shall be deemed to have an interest;
![Page 29: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/29.jpg)
29
Public participation in the permit procedure in new content of Directive 96/61/EC (1)
„Member States shall ensure that the public concerned are given early and effective opportunities to participate in the procedure for:
- issuing a permit for new installations,- issuing a permit for any substantial change in the
operation of an installation,- updating of a permit or permit conditions for an
installation (…)”
![Page 30: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/30.jpg)
30
Public participation in decision-making procedure Annex V to the Directive 96/61/EC (1)
1. The public shall be informed (by public notices or other appropriate means such as electronic media where available) of the following matters early in the procedure for the taking of a decision or, at the latest, as soon as the information can reasonably be provided:
(a) the application for a permit or, as the case may be, the proposal for the updating of a permit or of permit conditions (…);
(b) where applicable, the fact that a decision is subject to a national or transboundary environmental impact assessment or to consultations between Member States (…);
![Page 31: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/31.jpg)
31
Public participation in decision-making procedure Annex V to the Directive 96/61/EC (2)
(c) details of the competent authorities responsible for taking the decision, those from which relevant information can be obtained, those to which comments or questions can be submitted, and details of the time schedule for transmitting comments or questions;
(d) the nature of possible decisions or, where there is one, the draft decision;
(e) where applicable, the details relating to a proposal for the updating of a permit or of permit conditions;
(f) an indication of the times and places where, or means by which, the relevant information will be made available;
(g) details of the arrangements for public participation and consultation.
![Page 32: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/32.jpg)
32
Public participation in decision-making procedure Annex V to the Directive 96/61/EC (3)
2. Member States shall ensure that, within appropriate time-frames, the following is made available to the public concerned:
(a) in accordance with national legislation, the main reports and advice issued to the competent authority or authorities at the time when the public concerned were informed
(b) in accordance with the provisions of Directive 2003/4/EC (…) on public access to environmental information, information other than that referred to in point 1 which is relevant for the decision (…) and which only becomes available after the time the public concerned was informed in accordance with point 1.
![Page 33: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/33.jpg)
33
Public participation in decision-making procedure Annex V to the Directive 96/61/EC (4)
3. The public concerned shall be entitled to express comments and opinions to the competent authority before a decision is taken.
4. The results of the consultations held pursuant to this Annex must be taken into due account in the taking of a decision.
![Page 34: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/34.jpg)
34
Public participation in decision-making procedure Annex V to the Directive 96/61/EC (5)
5. The detailed arrangements for informing the public (for example by bill posting within a certain radius or publication in local newspapers) and consulting the public concerned (for example by written submissions or by way of a public inquiry) shall be determined by the Member States. Reasonable time-frames for the different phases shall be provided, allowing sufficient time for informing the public and for the public concerned to prepare and participate effectively in environmental decision-making subject (…)
![Page 35: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/35.jpg)
35
Public participation in the permit procedure in new content of Directive 96/61/EC (2)
„When a decision has been taken, the competent authority shall inform the public in accordance with the appropriate procedures and shall make available to the public the following information:
(a) the content of the decision, including a copy of the permit and of any conditions and any subsequent updates; and
(b) having examined the concerns and opinions expressed by the public concerned, the reasons and considerations on which the decision is based, including information on the public participation process.”
![Page 36: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/36.jpg)
36
Key elements of the public participation procedure – rules of Polish EPL
Placing of documents in a publicly accessible record; Notifying the public about the initiation of a procedure, the possibility of
becoming familiar with the documentation of the procedure, and the possibility of submitting comments and recommendations;
Becoming familiar with the documentation; Submitting comments and recommendations; Cosideration of comments and recommendations by a competent authority; Notifying the public about the decision made and the possibility of
becoming familiar with it together with the accompanying information on the submitted comments and recomendations and the ways in which they were used.
Moreover, the competent authority may conduct a public administrative trial.
![Page 37: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/37.jpg)
37
Six steps of public participation
Step 1: Drawing up a plan of public notification and public participation
Step 2: Identifying target groups for public notification and public participation
Step 3: Notification of the public Step 4: Collection of public comments and recommendations Step 5: Examination of public comments and
recommendations Step 6: Assessment of the results of public participation
![Page 38: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/38.jpg)
38
Techniques of informing the public - example
http://www.f7.mazovia.pl
![Page 39: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/39.jpg)
39
Techniques of informing the public - example
http://www.f7.mazovia.pl
![Page 40: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/40.jpg)
40
Public participation procedure
Information concerning IPPC application in publicly accessible data records (where and when it is publicly accessible – non confidential part, information about possible remarks, 21 days term for public access and for remarks)
Aprove or reject public remarks Administrative trial (optional) Public access to project of administrative
decision (7 days)
![Page 41: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/41.jpg)
41
General remarks concerning public participation
Involving the public in decision-making often means changing administrative practice.
Not all authorities accept public participation easily for this reason.
![Page 42: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/42.jpg)
42
INDEX
Where I am from? General Info about IPPC in Poland Main steps in the implementation Public participation process Guideline for implemetation as the Guideline for implemetation as the
conclusionconclusion
![Page 43: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/43.jpg)
43
Guideline for implementation
1. Identify sites within scope of the directive2. Assess existing administrative institutions responsible for
issue environmental permits and examine regimes to administer and control its implementation by industry
3. Compare IPPC permit requirements and processes to existing national law
4. Establish steps ( phases) of implementation according to the availability and capacity of resources
![Page 44: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/44.jpg)
44
Guideline for implementation
5. Evaluate capacity of existing administration to carry out the responsibilities laid down by the directive
6. Consult representatives of industry( at least from energy, metal production and processing minerals, chemicals, waste management sectors) on implementation issues
7. Consider appropriate level of administration to issue permit. IPPC licensing needs much expertise, knowledge and experience but may be introduced on national as well as regional level
![Page 45: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/45.jpg)
45
Guideline for implementation
8. Consider as a base for IPPC permit evaluation of the design of the entire plant (all production process) rather than end of pipe standards
9. Ensure that permit contain requirements for protecting land air and water from environmental damage and conditions how to identify and monitor air emissions
10. Define penalties for failure to cooperate with the competent authorities and inspectors as well as for breaches of permit requirements by industry
11. Require financial bounds from industrial operators to cover decommissioning costs
![Page 46: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/46.jpg)
46
Guideline for implementation
12. To ensure public participation in licensing process make permitting information available by posting register of decisions and permits in relevant administration office (website)
![Page 47: IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA 32645 Ankara, Turkey 5-6 November 2009](https://reader036.vdocuments.us/reader036/viewer/2022062517/56649e805503460f94b84890/html5/thumbnails/47.jpg)
47
Thank you very much for your attention!