InovCity EDP
Jeferson Marcondes
Partnership Culture:
� EDP Renováveis
� MPX
� Furnas – Eletrobras
High sustainability standards (ISE, GRI, ISO)
Notes:
(1) Segment values in Reais and percentages do not consider intra-group eliminations.
Hydro Concessions
in Operation
1790.1 MW
Concessions Ending:
2025 - 2036
Hydro Concessions
in Operation
1790.1 MW
Concessions Ending:
2025 - 2036
Porto Pecém
360 MW
Under construction
Porto Pecém
360 MW
Under construction
Bandeirante
SP - 1st state in GDP:
~33% of national total
1.5MM clients in 9.6 K Km2
Concession: 2028
Bandeirante
SP - 1st state in GDP:
~33% of national total
1.5MM clients in 9.6 K Km2
Concession: 2028
Escelsa
11th state in GDP: 2.3% of
national total
1.2 MM clients in 41.2 K km²
Concession: 2025
Escelsa
11th state in GDP: 2.3% of
national total
1.2 MM clients in 41.2 K km²
Concession: 2025
Sto. Antônio do Jari
373 MW
Under construction
Concession: 2044
Sto. Antônio do Jari
373 MW
Under construction
Concession: 2044
High Quality Portfolio of Assets
Hydro Generation
Thermal Generation
Wind Generation
Distribution
CENAEEL
6.3 MW
Concession: 2032
CENAEEL
6.3 MW
Concession: 2032
Elebras
31.5 MW
Starting Operations
Elebras
31.5 MW
Starting Operations
Generation Unit at a Glance
Enerpeixe
Mascarenhas
Pecém I
EDP Energias do Brasil
Eletrical Power market stakeholders supervising activities towards market balance and
benefits fot the society.
Electrical Power National Agency
Power Market Brazilian National Scenario
Establishes minimal metering systems requirements for low voltage
consumption units.
Captured Datz:
I – Voltage;II – Active Energy;III – Reactive Inductive Energy.
Addicional Features:
I – Short outages;II – Long outages;III – Out of range voltage level detection;IV – 4 TOUs.
Public Hearing #43/2011
6
Tourism town
with 1% of the
energy users of
EDP
Bandeirante
EDP = Brazilian’s Pilot Project: Aparecida City
Community
Awareness
Community
Awareness
Smart
Metering
Smart
Metering
•Smart
Meters: 100%
LV units
EV SupportEV Support
•Eletric
vehicles.
Distributed
Generation
Distributed
Generation
•Solar PV
pannels
performance
test.
Eficient Public
Lightining
Eficient Public
Lightining
•LED.
Energy
Efficiency
Energy
Efficiency
•More efficient
lamps,
refrigetors and
showers
donated to low
income
consumers.
•Educational
programs
within local
instituctions.
First Stage: 6 Differents Areas
Main Caracteristics
Meter Coordinator
R&D: EDP Regulatory Budget and Ecil Energia Technical Development.R&D: EDP Regulatory Budget and Ecil Energia Technical Development.
Meter and Coordinator: 100% Brazilian Technology
Architecture
Internal Topology - Home
Geography Topology
Geography Topology
ZIGBEE Gateway
• Up to 8 Zigbee networks;
• 8 directional antennas;
• GPRS/GSM/ 3G compatible;
• Ethernet, Bluetooth, Wi-Fi and WiMAX;
• Backup Battery;
• IP66 – External Use Installation.