Transcript
  • . - . _ w

    1 - NeMHamoshire-,

    i

    Toul C. F:.4 , -- -Senior Vice President and -Chief Operating Officer

    NYN-90100-

    April 26, 1990

    United States Nuclear Regulatory CommissionWashington, DC 20555

    Attention: Document Control' Desk

    References: (a) Facility Operating License Vio.

  • e' .0',.

    m

    United Stateo Nuclear Regulatory Commission April 26.-1989Attention: _ Document Control Desk- Page two

    * Arnormal Operating Procedure revisions-based upon recommendations-contained in Westinghouse Abnormal Response Guideline ARG-1, " Loss offR3R while operating at Mid-Loop Conditione",;which was delivered by-the Vestinghouse- Owners Group to New Hampshire Yankee representatives-by cover. letter dated March 26, 1990,

    A revision to Technical Specificatione to permit the_use of a SafetyTeInjection Pump in connection with aLbackup supply of make-up water tothe RCS. New Hampshire Yankee expects to submit a license amendmentrequest to the NRC-by July 31,:1990, . for this and other Technical =Specification revisions needed to complete the programmatic andhardware enhancements associated with-our response,to Generic Letter88-17.

    New Hampshire Yankee will make every effort-to complete.all rescheduledprogrammatic enhancements by December 31, 1990."

    .New Hampshire Yankee does not expect to operate.Seabrook Station at'reduced RCS inventory conditions' prior to the first refueling outage,.currently planned for mid-1991. If operStion-at reduced-RCS inventory is:required prior-to the first refueling outage, NHY.will take appropriate-compensatory measures.

    Should you have any questions regarding the'above, please contact Mr.Terry L. Harpster, Director of Licensing Sarvices,'at (603)z474-9521,extension 2765.

    1Very truly yours,

    hlTed C. Feigenbaum

    !

    |

    1,

    !

    t

    !

    i

    3-

    .

    - - - --

    _______2-____ _- _ - - -_

  • . ,

    , . . , , . .

    ,. )*..

    United States Nuclear Regulatory Commission- April 26, 1989. ;Attentions Document Control Desk Page three ;

    cc Mr. Thomas T. MartinRegional AdministratorUnited States Nuclear Regulatory CommissionRegion I ,475 Allendale RoadKing of Prussie., PA 19406

    c

    Mr. Victor'Nerses, Project Manager :Project Directorate I-3United. States-Nuclear Regulatory CommissionDivision of Reactor Projects

    ,

    Washington. DC 20555 |,

    Mr. Noel DudleyNRC Senior Resident InspectorP.O. Box 1149Seabrook, NH 03874

    ,

    L,

    '

    - !

    3

    '

    ,

    :

    l'


Top Related