Download - Industrial Projects[1]
-
8/14/2019 Industrial Projects[1]
1/27
INDUSTRY-WISE-LIST OF SAMPLE PROJECTAGRO-BASEDINDUSTRIES
AUTO ANCILLARIESINDUSTRIES
-
8/14/2019 Industrial Projects[1]
2/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Cycle Industry
Chemical, Drugs/
Pharma, Petroleum/ Petro-ChemicalsEtc.
-
8/14/2019 Industrial Projects[1]
3/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
-
8/14/2019 Industrial Projects[1]
4/27
-
8/14/2019 Industrial Projects[1]
5/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
-
8/14/2019 Industrial Projects[1]
6/27
-
8/14/2019 Industrial Projects[1]
7/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Computer RelatedProjectso
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Cosmetics,Perfumes, Soaps &Detergents AndToiletries
Electrical Projects
-
8/14/2019 Industrial Projects[1]
8/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Electronic Projects
-
8/14/2019 Industrial Projects[1]
9/27
-
8/14/2019 Industrial Projects[1]
10/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Food ProcessingIndustries
-
8/14/2019 Industrial Projects[1]
11/27
-
8/14/2019 Industrial Projects[1]
12/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Glass CeramicMineral Based
-
8/14/2019 Industrial Projects[1]
13/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Metals, LightEngineering
MechanicalMetallurgical
-
8/14/2019 Industrial Projects[1]
14/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
-
8/14/2019 Industrial Projects[1]
15/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
MiscellaneousProjects
-
8/14/2019 Industrial Projects[1]
16/27
-
8/14/2019 Industrial Projects[1]
17/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Packaging Projects
Paper-BasedIndustry
-
8/14/2019 Industrial Projects[1]
18/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Plastic/rubber/Leather
-
8/14/2019 Industrial Projects[1]
19/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
Service Industry
Textile Woollen,Jute, Hosiery
-
8/14/2019 Industrial Projects[1]
20/27
-
8/14/2019 Industrial Projects[1]
21/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
EXPORT ORIENTED
PROJECTS
..ask for more
-
8/14/2019 Industrial Projects[1]
22/27
Prices for each Computerized Sample Projects is Rs.1000/- (PostageRs.50/- extra)
-
8/14/2019 Industrial Projects[1]
23/27
INDUSTRIAL PROJECTREQUIREDIt is compulsory to mention below the Details of proposed
project1.
Plot Detailsa.
b.c.d.
2.3.4.5.
6.7.
-
8/14/2019 Industrial Projects[1]
24/27
DETAILS OF THE PROPOSED UNIT1. (a)
(b)
(c)S.
N.
Full
Name
Father's
Husband'sname
Residen
tialaddress
Age/D
ate ofBirth
Qualific
ation
Experie
nce
1.2.3.4.5.6.
A.
i.ii.iii.
B.i.ii.
2.3. i)
(ii)
Brochure of above 2000 sq. mtrs. Industrial Plot
-
8/14/2019 Industrial Projects[1]
25/27
4.
(i)
(ii)(iii)
(iv)
(v)5.6.
i)ii)iii)a)
7.S.No. Particulars Source/Make Nos.
Installed value in Rs.
Brochure of above 2000 sq. mtrs. Industrial Plots
-
8/14/2019 Industrial Projects[1]
26/27
8.S.No. Item Source Annual Annual Inventory Value of
materialRequirement Value(Rs.) period fo
inventory
in weeks period in Rs.(Attach separate sheet, if required) Total Rs.9. Utilities:10. Manpower requirement:
Duties Administration Technical Total monthly Annual Salary(Nos.) (Nos.) salary (Rs.)
Wages (Rs.)Total Rs.
Add benefits @ 33% of total Rs.
Grand total for salary & wages Rs.
With benefit
Brochure of above 2000 sq. mtrs. Industrial Plots
11. Computation of Working Capital:a)b)c)d)e)f)g)
Total12. Details of Misc. Fixed Assets:
a)b)c)d)e)
Total13. Capital Cost of the Project
a)b)
c)d)e)f)g)
Total14. Total Cost of Project :
a)
-
8/14/2019 Industrial Projects[1]
27/27
b)Total
Brochure of above 2000 sq. mtrs. Industrial Plots
15. Means of Financing:a)b)c)
Total16. Annual Cost of Production
a)b)c)d)e)
f)g)h)
TotalSay
17. Unit cost of production =18. Profitability:
a)b)c)
d)e)
www.ngosamachar.com
http://www.ngosamachar.com/http://www.ngosamachar.com/