WHAT IS THE GOAL OF TODAY’S PRESENTATION?
To educate owners and their consultants on why and what it
takes to implement BIM.
WHAT ARE WE GOING TO ACCOMPLISH DURING THIS PRESENTATION?
We will discuss what BIM is, a brief history, why it’s beneficial,
the components of a BIM implementation for owners, a
recommended roadmap for implementation, and then next steps.
WHAT DO WE HOPE YOU WILL TAKE AWAY FROM THIS PRESENTATION?
You will gain the knowledge you need to understand BIM from an
owner’s perspective, be much better equipped to start
implementing it, and have your next steps defined.
Speaker Bio
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 3
• 6 years in AEC industry as an architect
• 15 years as a consultant and trainer
• Oversees CADD’s team of expert AEC technology consultants
• Passionate about BIM
V.P. of Professional ServicesV.P. of Professional Services
T.J. Meehan AIA, LEED AP
Agenda
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 4
10:20 Introduction
10:25Overview of BIMWhat is it? // Brief History // Why is it Beneficial?
10:30Components of a BIM ImplementationWhat are they? // What are some recommendations?
10:50Recommended BIM Implementation RoadmapShort Term // Medium Term // Long Term
11:00Wrap UpSummary // Next Steps // Questions
11:05 Presentation Ends
Overview of BIMWhat is it? // Brief History // Why is it Beneficial?
© 2015 CADD Microsystems, Inc.
What is BIM?DEFINITIONS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 6
BIM
verb
nounBuilding Information
Modeling is a processwhereby a building is
modeled virtually, with
it’s associated
information, to be used
to help design and
maintain a building.
““
Building Information
Model is a digital / virtual model of a
building used in the
BIM process. These
are relational
databases with
graphics and data.
““
Brief History of BIM
• BIM was first wrote about in 1975
– Chuck Eastman, Professor at Georgia Tech
School of Architecture
– “The Use of Computers Instead of Drawings
in Building Design”
• “Building Information Model” term coined in 1992
– Paper by van Nederveen and Tolman
• Autodesk popularized “BIM”
– 2002 white paper titled “Building Information Modeling”
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 7
Maintaining Current Drawings
BIM is uniquely suited for this by having one file with all
the building data versus many different CAD files.
Plus, Revit can manage who owns what down the
individual element.
Why is BIM Beneficial?
Better Designs through Analysis
Energy consumption, heating and cooling loads,
computational fluid dynamics (CFD), solar radiation,
LEED calculations, and more.
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 8
More Coordinated Designs
Allows the different design disciplines to coordinate
their designs virtually, reducing costly design changes
and change orders during construction.
Better Visualization
To help stakeholders better see what they’re getting
and to help contractors better understand the design
intent (more views in the construction documents,
including 3D).
More Data Available
Models can maintain this data, such as specifications,
throughout the design and construction process and
then transitioning into building operations.
Accurate Estimates
Models can quickly generate very detailed cost
estimates as well as Bills of Material (BOM).
Why is BIM Beneficial?2014 SMARTMARKET REPORT
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 9
• 74% of responders report a positive return-on-investment (ROI) using BIM
• 86% of responders have been using BIM for three or more years
• In the past two years, the percentage of contractors implementing BIM at a high level has grown from 55% to 79%
• 82% of contractors require or encourage their teams to have BIM expertise
Components of a BIM ImplementationWhat are they? // What are some recommendations?
© 2015 CADD Microsystems, Inc.
BIM StrategyROADMAP FOR NOW AND THE FUTURE
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 11
• Define Your Goals/Strategies for BIM
– Short Term = 6-12 months
– Medium Term = 1-3 years
– Long Term = 3-5 years
• Layout your Tactics
– What steps will you take specifically to achieve
those goals?
– What can you do in-house and what will
require help from outside experts?
• Develop the Roadmap
– We’ll discuss a recommended one later
BIM RequirementsTHE FOUNDATION OF YOUR STANDARDS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 12
• Defines specifically what you want out of a BIM model deliverable
• Will probably end up being a contract addendum
• Allows for the creation of consistently formatted models –both graphics and data
• Sooner this is in place, the sooner you can start building your model library
• Sections Typically Include:
– General requirements (overview, terminology,
existing conditions, project team roles,
templates, ownership)
– Submittal requirements (general, design
submittals, construction submittals)
– Modeling requirements (general modeling,
building elements, level of development/LOD)
– Additional BIM tasks (overview, phased
construction/4D, estimating/5D,
sustainability/6D, facilities management/7D)
– Appendix (naming conventions, BIM Project
Execution Plan)
Levels of Development (LOD)DEFINING HOW THINGS ARE MODELED
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 13
• Essentially, how detailed are the graphics and how much data is embedded
• Broken down by building elements
– USACE and BIMForum use UniFormat to organize
• Top 3 Industry Definitions:
– American Institute of Architects (AIA):
G202, Project Building Information Modeling Protocol Form
– U.S. Army Corps of Engineers (USACE):
Minimum Modeling Matrix (M3), part of their BIM Requirements
– BIMForum:
Level of Development Specification 2014
Image courtesy of the BIMForum Level of Development Specification, version 2014
BIM Requirements and LODRECOMMENDATIONS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 14
• Define LOD for both graphics and data separately
– As they do not always run in parallel
• Be very specific about what should and should not be modeled (LOD)
– So as to avoid over-modeling
• Be very specific about the data fields that are necessary and required
– So data connections outside of Revit can
be maintained
– For example, ARCHIBUS and Maximo
• Minimize redundant data fields
– Identify overlap and deciding upon one
field that serves multiple outside systems
– For example, using the COBie Row Name
field to also contain the asset identifier
• If possible, require only Revit
– So you can be very specific on how
elements should be modeled
– Organize elements based on Revit
categories
Levels of Development (LOD)POTENTIAL ISSUE WITH ORGANIZING ELEMENTS VIA UNIFORMAT
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 15
They all have the same
UniFormat Number:
B2070.10 Exterior Louvers
BIM Project Execution Plan (BEP)KEEPING YOUR PROJECTS BIM COMPLIANT
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 16
• Project-specific BIM data
– Project contacts and milestone dates
– Which parties are responsible for
modeling which elements and to what
LOD, based on the project design
phases
– Method and frequency of exchanging
models
• Information Typically Includes:
– Project Information and Key Contacts
– Organizational Roles
– Project BIM Goals and Objectives
– Information Exchanges and Collaboration
Procedures
– Modeling (LOD) Requirements
– Model Quality Control Procedures
– Model Structure
– Project Deliverables
BIMing Your FacilitiesGETTING MODELS OF YOUR BUILDINGS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 17
• Turning your existing data into BIM models
– a.k.a. “Revitizing”
• Make them Yourself
– In-house teams using drawings, scans, and field
measurements
• Contract them Out
• Get from your consultants
– They’re probably already modeling in Revit
– They just give you DWGs because that’s all you
ask for
• Check for compliance
– Manually via a checklist
– Automatically via software
Autodesk Model Checker for RevitFREE UTILITY
Classifications3 MAIN CLASSIFICATION SYSTEMS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 18
Autodesk Classification Manager for Revit
OmniClass Table 21
(UniFormat)
� Organizes by system
� Ideal for estimates and
initial design
� What the architects and
engineers want to know
OmniClass Table 22
(MasterFormat)
� Organizes by material
� Ideal for organizing the
work to be executed
� What the contractor
wants to know
OmniClass Table 23
� Organizes by products
� Ideal for understanding
specific items
� What the building
engineer wants to know
FREE UTILITY
Building Master Files ProcessTHE DESIGN AND CONSTRUCTION WORKFLOW
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 19
• Maintaining a master set of files for each facility to use for continued design & construction projects
• Issues owners typically face:
– Out-of-date or inaccurate information
– Files not updated in a timely manner
– Simultaneous projects overwrite each
other’s work
– Projects sometimes begin with a costly
survey to build the backgrounds
• A single, comprehensive building model (Revit) is uniquely suited to solve this challenge
– No more missing drawings or not knowing
which is the latest version
– Allows for simultaneous projects, even if
adjacent to each other (via Worksharing)
– Allows for projects to be done in-house or
by outside consultants
COBieCONSTRUCTION OPERATIONS-BUILDING INFORMATION EXCHANGE
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 20
• A standardized format for taking data from BIM models to O&M applications
• COBie becoming the norm for data exchange at construction completion
• COBie format is strict and not specific to any one BIM application
• Many O&M solutions directly import COBie data to quickly get the building engineers up-and-running
Autodesk COBie Extension for RevitFREE UTILITY
BIM ManagerA NEW ROLE WITH NEW RESPONSIBILITIES
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 21
• Helps manage this new process
• Responsibilities:
– Oversees the implementation
– Manages models for projects
– Assists teams with new project setup
– Reviews models for compliance
– Provides feedback
– Updates processes and content
• Part-time role at first
SoftwareWHAT YOU WILL NEED…
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 22
� Ideal for creating / authoring BIM models
� Has tools for Architects, MEP, and Structural engineers
Revit
� Ideal for aggregating your models together
� Includes sequencer, QTO, and clash detection tool (Manage)
Navisworks
� Ideal for working with point clouds
� Import laser scans, visualize, publish, and prepare for modeling
ReCap
EducationINITIAL TRAINING ONGOING EDUCATION
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 23
• Targeted training for:
– Software tools
– New processes
– Utilizing standards created
• Include courses for each group:
– BIM Manager
– Designers
– Space Managers
– Construction Administrators
– Project Managers
– Leadership
• Utilize an on-demand resource
– General curriculum
– Customized courses that are recorded
BIM Implementation RoadmapShort Term // Medium Term // Long Term
© 2015 CADD Microsystems, Inc.
Recommended Roadmap: Short Term6-12 MONTHS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 25
1. Get a BIM Strategy, BIM Requirements document, and BIM Project Execution Plan (BEP) template in place
2. Appoint a BIM Manager (part-time role)
3. “Revitize” at least one facility
4. Ensure you have the correct Software in place
5. Begin to Provide Training to your Teams
6. Implement a Pilot Program
– Perform at least 1 design & construction project using BIM
Recommended Roadmap: Medium Term1-3 YEARS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 26
1. Refine your BIM Documents
2. Continue “Revitizing” facilities = Build your Library
– By receiving models from consultants or having them modeled yourself
3. Implement a Master Files Process
4. Pass Data from D&C to O&M
– COBie or equivalent
5. Expand the Pilot Program
– Multiple construction types (new buildings, major renovations, interiors
projects) and multiple teams (in-house and outside consultants)
– Try each combination to test and refine the process
Roadmap: Long Term3-5 YEARS
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 27
• Have all your facilities “Revitized”
• Retire the Pilot Program
– All new design and construction projects now done
in BIM
• Direct Integration of D&C and O&M Systems
– Revit and Maximo connected
• Other Future Technologies
– Data accessed and updated in the field
– Augmented reality
– Cloud-based data and software
Wrap Up
© 2015 CADD Microsystems, Inc.
Summary // Next Steps // Questions
SummaryWHAT DID WE LEARN TODAY?
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 29
• History and Benefits of BIM
• The Components of a BIM Implementation
– BIM Requirements document
– LOD
– BIM Project Execution Plan template
– “Revitizing” your Facilities
– Classifications
– Master File Process
– COBie
– BIM Manager
– Software
– Education
• A Recommended BIM Implementation Roadmap
– Short Term
– Medium Term
– Long Term
Free Utilities
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 30
LEED EXTENSION BETA
• E-mail me ([email protected])
COBIE EXTENSION V1.0
• www.caddmicrosystems.com/
cobieextension
REVIT MODEL CHECKER V4.0
• www.caddmicrosystems.com/
modelchecker
CLASSIFICATION MANAGER V1.0
• www.caddmicrosystems.com/
classificationmanager
Next StepsWHERE TO GO FROM HERE?
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 31
• There is a lot more to this than can fit in a 60 minute presentation
• Have us come in and discuss our services to help you implement BIM
• In the meantime, download our free utilities
Questions
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 32
© 2015 CADD Microsystems, Inc.JULY 28, 2015 // 33