ICAO EUR FPL2012 Workshop
Kiev, Ukraine29 June – 1 July 2010
Mervyn Harris – ATM Business Development Manager
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Challenges faced by FPL 2012 Req PENS Overview PENS & FPL2012 Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Who we areWe are the world’s leading provider of IT business solutions and communication
services for the AIR TRANSPORT INDUSTRY
We are a community of over 600 airline, airport, aerospace, cargo and GDS members and over 1800 customers
We are unique in delivering integrated communicationand IT solutions, on a global basis, for the air transport industry
We do this through a single supplier relationship
We are local, globally, with a presence in 220 countries and territories over 4,000 staff worldwide 140 nationalities, speaking over 70 languages
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Customers the world over: a snapshot
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS Evolution Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Challenges & Impact faced by introduction of new FPL format
Challenges – Meet the implementation date of 15th Nov 2012– Ensure all stakeholders are supported during development– compatibility with existing & future application and
infrastructure – Maintain low cost– Continuity of operations.
Impact– Increase in bandwidth resulting in…
Type of application you will use in the future – e.g. AMHS? The chosen infrastructure – applications & Technology
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
FPL 2012 Infrastructure Requirements
Must be capable of supporting.. – Increased bandwidth– Different technology
IP Services X.25/XoT Services Multicast Services VoIP Services Circuit Emulation Services
– Various applications– Meets security standards
Connectivity with various Aviation stakeholders Availability – on time 15th Nov 2012 Maintain low cost
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL2012 Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
What is PENS
A joint EUROCONTROL ANSP led initiative to provide a common IP based network service across the European region
covering voice and data communication Provides efficient support to existing services and new
requirements that are emerging from future Air Traffic Management (ATM) concepts.
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
PENS Scope
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Benefits of PENS
Cost savings EAD-CFMU
Common procurement project – model for future Pan European projects
Active contribution to CNS defragmentation
SESAR enabler
EUROCONTROLEUROCONTROL
More cost effective than fragmented network services;
Set standard for other ICAO regions
Expedite future pan European services
Aligns with SES Implementing Rules and industry standard services
ANSPsANSPs
Foundation for multi-stakeholders communications for CDM and SWIM applications
Air Transport IndustryAir Transport Industry
SITA ATC Strategy
Benefits SITA shareholders (Airlines)
SITASITA
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
PENS Governance
PENS Service Steering Group (PSSG) – set policy and standards– review performance.
PENS User Group (PUG), provides technical, financial and administrative advice to the PSSG.
PENS Management Unit (PMU), – implements policy and
standards set by the PSSG, – manages the PEN Service.
Network Service Provider (NSP)– Provides the PENS Service– Selected NSP is SITA
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Proposed Initial Deployment…
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
PENS Status
CURRENT STATUS– CFMU Operational– PENS Contract signed
EUROCONTROL for CFMU and EAD Services
AENA NAVIAIR Denmark LFV Sweden LPS Slovakia Finavia Avinor NAV Portugal Hungarocontrol ENAV Crocontrol Sloveniacontrol UK NATS DFS
– PENS Contracts in preparation DSNA Austrocontrol Skyguide
– Letter of Intent IAA
N° of ANSPs
May 2011
28
EU
FMTP IR
2013
42
Cost savings
Governance
ECAC
2015
53
ICAO EUR/NAT
Cost savingsICAO Request
Governance
2017
ICAO EUR border
Cost savingsICAO Request
Governance
64
Year
Driver
15
Constraint
Today
Group Signed
Transition PgmFMTP IR
PENS Future in EUROPE
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS and FPL2012 Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Geographic Extension – Outside Europe
Option 1– PENS Governance extended outside Europe
Option 2– Regional Network Services (RENS) ‘PENS like’
- - ++
Fast deployment
Regulations
TBALocal
Governance
PENS provides scalability, reliance and stability
PENS Can address the FPL2012 requirement for connectivity
Note: At Present, PENS is only available to ANSP’s of the EUROCONTROL member States PSSG is responsible for considering request for inclusion in PENS Currently PENS Governance does not extend beyond member states
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL 2012 Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
The SITA solution
Design - Deployment - Reporting - Tools - Fault Management - Maintenance - Customer CareDesign - Deployment - Reporting - Tools - Fault Management - Maintenance - Customer Care
LLDSLMEA
LLDSLMEA
GMSNet, CFMUNetGMSNet, CFMUNet
ISDN
WX/WXC
Legacy X.25Legacy X.25
VSATVSAT
AirportHubAirportHub
MPLS Based IP VPN
AO
ServiceNet
Legacy X.25Legacy X.25
AO
Community
AFTN CommCentre OPS & DEV Servers
LL / DSL
AGN
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Resiliency, scalability, stability Critical for maintaining “Business Continuity” Proposed solution is resilient, scalable and stable
– Resiliency to diversely located nodes and PoP’s
– Scalable to support the forecast bandwidth requirements “Backdoor Resiliency”,
– A standard SITA feature and offering
– Interest shown by ANSP’s for network integration
– 3rd Party Network provider involvement – some complexity
– Already successfully implemented for several customers
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL 2012 Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
PENS / FPL 2010 Roll out plan
- 21
25/06/2008 15/11/2012
ANSPs
AOs
ANSPs support both formats
PRESENT not assured
25/06/2008 15/11/2012
AOs
Initial PENS identification
25/06/2009 25/06/2010
Contract Signature
PENS Transition programme Roll out
FPL2012 over PENS
FPL2012 roll out Plan
PENS roll out Plan
Potential FPL2012 over PENS roll out Plan
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Agenda
General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL 2012 Technical Overview PENS Transition Programme Conclusion
SITA proprietary and confidential information. ©SITA 2009 All rights reserved.
Conclusion
PENS is available and is widely taken up in Europe PENS potential outside Europe is acknowledged To join the PENS
– Contact Email: [email protected] – Mr Yvan Fischer – PENS Development Manager – Email: [email protected] – Sign Common Procurement Agreement (CPA)– Sign PENS Contract
Join the PENS Symposium – 15/16 Sep 2010
http://www.eurocontrol.int/corporate/public/event/100915_pens_sympos.html