© 2003 IBM Corporation
Why did the Tower of Babel fail?
Siva Prasanth RentalaIBM-General Motors-WWP,
Bangalore
BCOZ of language confusion and no Business Process Modeling, Management, and Engineering
(BPMME) like Software configuration management
usage
![Page 2: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/2.jpg)
Configuration Management
© 2003 IBM Corporation
Why did the Tower of Babel fail?
The Tower of Babel project failed because of lack of communication and organization.
![Page 3: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/3.jpg)
Configuration Management
© 2003 IBM Corporation
"Now the whole earth had one language and few words. And as men migrated from the east, they found a plain in the land of Shinar and settled there. And they said to one another, 'Come, let us make bricks, and burn them thoroughly.' And they had brick for stone, and bitumen for mortar. Then they said, 'Come, let us build ourselves a city, and a tower with its top in the heavens, and let us make a name for ourselves, lest we be scattered abroad upon the face of the whole earth.'
And the LORD came down to see the city and the tower, which the sons of men had built. And the LORD said, 'Behold, they are one people, and they have all one language; and this is only the beginning of what they will do; and nothing that they propose to do will now be impossible for them. Come, let us go down, and there confuse their language, that they may not understand one another's speech.' So the LORD scattered them abroad from there over the face of all the earth, and they left off building the city.' Therefore its name was called Babel, because there the LORD confused the language of all the earth; and from there the LORD scattered them abroad over the face of all the earth."
![Page 4: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/4.jpg)
Configuration Management
© 2003 IBM Corporation
Contents
Characteristics of Today’s Software industry
SCM Concepts and terminology
Why Software configuration management?
Requirements of Configuration management
Standard reports
Typical Uses of SCM
![Page 5: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/5.jpg)
Configuration Management
© 2003 IBM Corporation
The Fundamental Law of Configuration Management
Configuration Management is the foundation of a software project. Without it, no matter how talented the staff, how large the budget, how robust the development and test processes, or how technically superior the development tools, project discipline will collapse and success will be left to chance. Do Configuration Management right, or forget about improving your development process.
![Page 6: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/6.jpg)
© 2003 IBM Corporation
Today's Software industry characteristics are..
![Page 7: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/7.jpg)
© 2003 IBM Corporation
Characteristic 1 -
Coordination & Communication
Men and months cannot be interchanged
Fred Brooks
• Number of communication channels increase exponentially with number of team members - the number of coordination problems also increase exponentially with the project size.
![Page 8: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/8.jpg)
Configuration Management
© 2003 IBM Corporation
Communication Channels
![Page 9: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/9.jpg)
Configuration Management
© 2003 IBM Corporation
# Team Members #Communication Channels
1 0
2 1
3 3
4 6
5 10
….. …..
n n*(n-1)/2
![Page 10: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/10.jpg)
Configuration Management
© 2003 IBM Corporation
Characteristic 2 -
Software is Easy to Copy
![Page 11: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/11.jpg)
Configuration Management
© 2003 IBM Corporation
Characteristic 3 -
Changes
• Different users / customers have different requirements
• Get clarified / known at a later date
• Changes to business environment
• Technology change
• Personnel whims
![Page 12: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/12.jpg)
Configuration Management
© 2003 IBM Corporation
Characteristic 4 -
Personnel Turnover
• Developers leave
• Users change
Further Adds to the Coordination problem
![Page 13: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/13.jpg)
Configuration Management
© 2003 IBM Corporation
Resulting Problems
• Listing seems OK; program does not work
• Works in Pune, misbehaves in Detroit.
• We had customized for this client, how do we install the upgrade now?
• I had fixed this bug last month. How did it re-appear?
• I haven’t changed the program. Why is it now blowing up?
• Which is the latest source? I need to put a patch.
• In the last month, the user asked for this change and now she does not want it
• Where did Gates leave the programs he was working on?
![Page 14: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/14.jpg)
Configuration Management
© 2003 IBM Corporation
Main Classes of Problems
• Double maintenance problems
• Shared data
• Simultaneous update
• Missing / unknown version problem
![Page 15: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/15.jpg)
Configuration Management
© 2003 IBM Corporation
Double Maintenance
• Multiple copies of same software in use
• Fix in one
- SHOULD FIX IN OTHERS
• Example
- Same set of common routines in two systems
- Same system - multiple sites
• forget to inform
• sites detect bug at same time and “fix” differently
• = = > > DIVERGENCE
• Should do
- Bug fixed in all copies
- Fix same bug in identical manner in all copies
![Page 16: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/16.jpg)
Configuration Management
© 2003 IBM Corporation
Shared Data
• Changes made in one program interfere with proper functioning of other program
- Example : subroutines, MW objects
• Need
- Control of modifications
- Good communications
![Page 17: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/17.jpg)
Configuration Management
© 2003 IBM Corporation
Simultaneous Update
• One module being worked on by more than one programmer
- Changes made by one programmer disappear
• Need
- Better division into modules
- Ensure simultaneous working
![Page 18: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/18.jpg)
Configuration Management
© 2003 IBM Corporation
Missing / unknown Version problem
• Consciously decide which version to keep, which to destroy
• Use a systematic method to identify versions and changes across versions
• Use consistent back-up procedures
?
![Page 19: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/19.jpg)
Configuration Management
© 2003 IBM Corporation
Why Software Configuration Management
• SCM addresses all these issues!!
AbracadabAbracadabrara
![Page 20: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/20.jpg)
Configuration Management
© 2003 IBM Corporation
SCM provides visibility into the status of the evolving software product.
SCM answers the following: Who, What, When, and Why.
Who made the changes?
What changes were made to the software?
When were the changes made?
Why were the changes made?
Who will benefit from SCM(Importance in descending order) :
Software developers
Project managers
Quality Assurance (QA) personnel
Testers
Customer
![Page 21: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/21.jpg)
Configuration Management
© 2003 IBM Corporation
Program Families & Configurations
A
D
E
B
C
F
A
CLIENT-1
DG
B
W
E
F
CLIENT-2
Applications
Applications
![Page 22: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/22.jpg)
Configuration Management
© 2003 IBM Corporation
AD
E
B C
F
G W
CLIENT-A
A
B
C
D
E
F
CLIENT-B
A
B
D
E
F
G
W
Applications
![Page 23: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/23.jpg)
Configuration Management
© 2003 IBM Corporation
SCMConcepts & Terminology
![Page 24: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/24.jpg)
Configuration Management
© 2003 IBM Corporation
Definitions
The arrangement of a computer system or component as defined by the number, nature, and interconnections of its constituent parts
Configuration
The art of identifying, organizing and controlling modifications to the software being built by a programming team. The goal is to maximize productivity by minimizing mistakes.
Configuration Management
![Page 25: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/25.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Management
![Page 26: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/26.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Identification
The approved documentation or description that identifies and defines a configuration item's (CI) functional and physical characteristics in the form of a specification or standard, algorithm or code, and interface control description.
A
BC
D
![Page 27: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/27.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Control
• Evaluation, coordination, approval or disapproval, and implementation of changes to configuration items after formal establishment of their configuration identification
![Page 28: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/28.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Status Accounting
• Recording and reporting of information needed to manage a configuration effectively. Includes a listing of the approved configuration identification, the status of the proposed changes to the configuration identification, and the implementation status of approved changes.
CI = 30
CR = 2
PR = 1
![Page 29: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/29.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Audit
• Verifying the following:
•All required configuration items have been produced
•The current version agrees with the specified requirements
•The technical documentation completely and accurately describes that configuration items
•All change requests have been resolved
![Page 30: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/30.jpg)
Configuration Management
© 2003 IBM Corporation
Requirements of Configuration Management
![Page 31: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/31.jpg)
Configuration Management
© 2003 IBM Corporation
CM Requirements
• Identification of Configuration Items
• Establishment of Baselines
• Document control
• Version control
• Management of Workspaces
• Creation of Builds
• Backup & Archival
• Management of Changes to Baseline Configuration Items
• Status Accounting
• Configuration Audits
![Page 32: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/32.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Items and Baselines
• Configuration Item
- An aggregation of software, documents and data that is treated as a single entity in the configuration management process
There are 3 types of CIs:
Baselined – Formally reviewed and agreed document/source code, which is basis for, further development. E.g. Requirement specification document, design document etc.
Controlled and Managed – Documents describing the admin and project Management activities. E.g. Project management plan, task allocation and project schedule documents, coding or GUI guidelines
Controlled – Documents obtained from the customer which are not managed by us. E.g. reference technical material.
![Page 33: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/33.jpg)
Configuration Management
© 2003 IBM Corporation
What is Baseline?
- A item that has been formally reviewed and agreed upon, that thereafter serves as the basis for further development, and that can be changed only through formal change procedures
![Page 34: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/34.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Items & Baselines - Typical Scenario
• Definition Baseline - Created at the end of Requirement Specifications. Typical configuration items (CI) -
- Requirement Specifications
- Project Plan
- Design Standards / Guidelines
- Acceptance Test Plan
• Design Baseline - Created at the end of Design. Typical CIs -
- System Design Specification
- Program Specification
- Data Base Design
- Coding Standards
- System Test Plan
- User Manual
- User Interface Standards
- Testing Standards
![Page 35: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/35.jpg)
Configuration Management
© 2003 IBM Corporation
• Code / Unit Test Baseline - Created at the end of coding and unit. Typical configuration items (CI) -
- source code
- object code
- unit test data / scripts
• Testing Baseline - Created at the end of system testing . Typical CIs -
- System test data
- system test scripts
- operations manual
- installation manual
![Page 36: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/36.jpg)
Configuration Management
© 2003 IBM Corporation
Definition Baseline Creation - A schematic
Individual workspaces
Internal review changes
Definition Baseline
Internal review Workspace
Customer Review Workspace
Formal change management procedures become applicable
Configuration Audit
Review Log
Review Log
![Page 37: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/37.jpg)
Configuration Management
© 2003 IBM Corporation
Document control
Document Control procedure ensures the traceability of all the documents.
It involves the following tasks: Defining the naming scheme. Updating Document Record List (DCR) of
the documents to reflect the changes and assigning of version and release nos.
Provides usage of the documents by giving access rights to different folders.
MyName is
Mr.Unique
![Page 38: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/38.jpg)
Configuration Management
© 2003 IBM Corporation
Version A variant of some artifact; later versions
of an artifact typically expand on earlier
versions.
Version Control Version Control ensures the ability to
reproduce any version of the software at any given time. It controls versions of source code, executables and documents .It provides version change history to ensure trace-ability.
A1
A2A3A4
![Page 39: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/39.jpg)
Configuration Management
© 2003 IBM Corporation
An operational version of a system or part of a system that demonstrates a subset of the capabilities to be provided in the final product.
![Page 40: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/40.jpg)
Configuration Management
© 2003 IBM Corporation
Work space management Workspaces refer to ‘private’ areas where
developers can implement and test code in accordance with the project’s adopted standards in relative isolation from other
developers.
![Page 41: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/41.jpg)
Configuration Management
© 2003 IBM Corporation
Uncertainty is the only certain in this world.
Why Backup?
![Page 42: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/42.jpg)
Configuration Management
© 2003 IBM Corporation
Change Control
![Page 43: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/43.jpg)
Configuration Management
© 2003 IBM Corporation
I can make the change directly in the baseline copy. Its just a one line change, so I don’t want to fool around with Change Request, check-out, check-in, etc
![Page 44: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/44.jpg)
Configuration Management
© 2003 IBM Corporation
Change Control
• Record of changes
• Approval of change requests after analysing impacts (impact on retest & review, think it as another proposed)
• Maintaining of baselines
• Traceability between changes and change requests and vice versa
IEEE Definition
An element of configuration management, consisting of the evaluation, coordination, approval or disapproval, and implementation of changes to configuration items after formal establishment of their configuration identification
![Page 45: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/45.jpg)
Configuration Management
© 2003 IBM Corporation
Change Management Process
Change request documented
Change request Evaluated
Change request reviewed for approval CCB approved
Change order prepared
Configuration items, tasks, QC required is documented
Configuration items checked out
Change made; QC activities carried out
Configuration audit carried out
Changed items carried out
New product release made
Pending rejected
![Page 46: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/46.jpg)
Configuration Management
© 2003 IBM Corporation
Change Request
XYZ Software Corp. Change Request
Project: Initiated By: Date:
Description of Change Requested:
Benefits Expected:
Signature of Initiator: Attachments:
Evaluated by: Change Request No.
Technical Impacts:
Estimates for costs and schedule
Signature of evaluator: Attachments
Date:
Approving Auth Signature Date
Recommendations
Change Order Number
![Page 47: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/47.jpg)
Configuration Management
© 2003 IBM Corporation
![Page 48: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/48.jpg)
Configuration Management
© 2003 IBM Corporation
Change Control Board (CCB)
• Also called Configuration Control Board
• A group of people responsible for evaluating and approving and disapproving proposed changes to configuration items, and for implementation of approved changes.
• Typical CCB members
- Project Manager
- User Representative
- Quality Controller
- Configuration Controller
![Page 49: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/49.jpg)
Configuration Management
© 2003 IBM Corporation
Some Good Practices
• Keep version history in the configuration item.
• Item to contain exact item name, version number, date
• Identify configuration items to be tracked
• Code should have history in the comment
• Highlight the changes in the document atleast for two versions.
![Page 50: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/50.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Audit
![Page 51: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/51.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Audits
• To ensure that what has been built is in conformance with what was required (original specifications and change requests) by analysing :
- Test reports
- review reports
- change logs
Definition
Verification of a configuration item’s compliance with its configuration identification
![Page 52: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/52.jpg)
Configuration Management
© 2003 IBM Corporation
Status Accounting
An ounce of derivation is worth a pound of analysis
- Wayne Babich
![Page 53: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/53.jpg)
Configuration Management
© 2003 IBM Corporation
Configuration Status Accounting & Reporting
• Keep track of
- Current identification of items
- Configuration of delivered software
- Status of change requests / problem reports
- Status of approved changes
IEEE Definition
An element of configuration management, consisting of the recording and reporting of information needed to manage a configuration effectively
![Page 54: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/54.jpg)
Configuration Management
© 2003 IBM Corporation
Typical Information
Baseline Library
Items / Units
Baseline Units
Release
Release Units
Change OrderBackup
Backup Units
Check-in / Check-out
Change Request/ Problem Log
![Page 55: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/55.jpg)
Configuration Management
© 2003 IBM Corporation
Standard Reports
• Summary list Change Requests / Problem Reports
• List of CR / PR pending approval
• Summary list of Change Orders
• List of Change Orders pending completion
• Items and versions of a Baseline
• Current set of units in the library
• List of changes since Baseline
• List of checked-out items
• History of backups
• History of releases
• List of items / versions in a baseline
• List of items / version in a release
![Page 56: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/56.jpg)
Configuration Management
© 2003 IBM Corporation
Typical Uses of the Configuration Accounting Data
• In which backup is version 1.6 of P13?
• What are the program level changes between release 5.1 and 5.2?
• Which programs were replaced in release 5.2?
• Which items were changed for Change Order 671? What were the versions of the units before and after the change? Have all the changes been incorporated and checked-in?
![Page 57: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/57.jpg)
Configuration Management
© 2003 IBM Corporation
![Page 58: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/58.jpg)
© 2003 IBM Corporation
Can we make SCM happen?
![Page 59: Ibm software configuration management 24-6-2010](https://reader033.vdocuments.us/reader033/viewer/2022061218/54b666544a7959566f8b459b/html5/thumbnails/59.jpg)
Configuration Management
© 2003 IBM Corporation
Thank You