Download - I ORIGINAL - IN.gov
I ORIGINAL
STATE OF INDIANA
INDIANA UTILITY REGULATORY COMMISSION
IN THE MATTER OF AN ORDER ) APPROVING ADVISORY COMMITTEE ) RECOMMENDATIONS PURSUANT TO ) INDIANA CODE CHAPTER 8-1-26. )
APPROVED:
ORDER OF THE COMMISSION
NOY 05 2014
Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.
The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.
Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination.
IT IS SO ORDERED.
STEPHAN, MAYS-MEDLEY, HUSTON, WEBER AND ZIEGNER CONCUR; WEBER NOT PARTICIPATING IN THOSE MATTERS INVOLVING VECTREN:
APPROVED: NOV 05 2014
I hereby certify that the above is a true and correct copy of the Order as approved.
~ &Jlr&£ ____ I Secretary to the Commission
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
5662 NIPSCO Miller Pipeline $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5663 Larry Norman NIPSCO Warning Letter No prior
5665 NIPSCO Miller Pipeline $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5667 NIPSCO GE Marshall $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5671 NIPSCO Precision Trenching $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5672 Hoosier Property NIPSCO Warning Letter No prior
Maintenance
5675 J&B West Construction NIPSCO Training Warning Letter
5676 Green Thumb Jasper Muni Gas Warning Letter No Prior
Landscaping
5678 NIPSCO Habitat for Humanity $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5682 NIPSCO Lee Excavating $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5683 Lawson Electric NIPSCO Warning Letter No prior
5686 Mike Thompson NIPSCO Warning Letter No prior
5688 NIPSCO H & G Underground $1,000 314 priors (Warning
Utilities Letter, Training,
Written Plan)
5692 Skyway Trucking NIPSCO Training Warning Letter
1
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
5696 NIPSCO Pavey Excavating $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5698 NIPSCO Grimmer Construction $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5699 NIPSCO Grimmer Construction $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5701 Kihn Concrete Community Natural Gas Warning Letter No prior
5702 Hoosier Fence and Deck NIPSCO Warning Letter No prior
5704 Pfister Sprinkler NIPSCO Training 314 priors (Warning
Letter, Training,
Written Plan)
5706 Ben Potis NIPSCO Warning Letter No prior
5708 NIPSCO Hoosier Fence & Deck $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5709 NIPSCO Pete Saint Mary $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5710 NIPSCO Fort Wayne City Utilities $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5711 NIPSCO Schneck Excavating $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5712 Earth Construction NIPSCO Training Warning Letter
5718 Valparaiso Sewer NIPSCO Training Warning Letter
2
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
5721 NIPSCO Earth Construction $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5728 NIPSCO Indiana Earth Inc. $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5729 Citizens Energy Group Millennium $1,000 59 (Warning Letter,
Training)
5731 Michael Hough NIPSCO Warning Letter No prior
5734 Lagrange County REMC NIPSCO Warning Letter No prior
5735 NIPSCO Kankakee Valley REMC $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5739 NIPSCO Riccis Landscape $1,000 314 priors (Warning
Management Letter, Training,
Written Plan)
5741 NIPSCO Kline Excavating Inc. $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5743 NIPSCO GE Marshall $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5747 Middlebury Septic NIPSCO Warning Letter No prior
5749 NIPSCO NIPSCO $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5751 NIPSCO Advance Irrigation $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5752 Citizens Energy Group K and K Fence $1,000 59 (Warning Letter,
Training)
3
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
5755 NIPSCO LGS Plumbing Inc. $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5757 NIPSCO Band W Specialized Drilling $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5768 Rebecca Cartwright NIPSCO Warning Letter No prior
5784 Rothenberger Co. NIPSCO Warning Letter No prior
5785 Rieth-Riley NIPSCO $3,000 19 priors (Warning
Letter, Training)
5788 Van Gordon NIPSCO Warning Letter No prior
Construction
5799 Migul Becerril NIPSCO Warning Letter No prior
5800 Zach Raymond NIPSCO Warning Letter No prior
5801 NIPSCO Rivers Edge Construction $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5808 NIPSCO Walsh and Kelly (Griffith) $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5811 NIPSCO Band W Specialized Drilling $1,000 314 priors (Warning
Letter, Training,
Written Plan)
5812 Bieson Excavating Rennselaer Muni Gas Warning Letter No prior
6313 Qualkenbush Bros. Indiana Natural Gas Corp. Training Warning Letter
6329 Conwell Construction Indiana Natural Gas Corp. Warning Letter No prior
6330 Qualkenbush Bros. Indiana Natural Gas Corp. $500 + training Training
6331 Jerry Hammond Midwest Natural Gas Corp. Warning Letter No prior
4
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
6334 Service Experts Heating NIPSCO Warning Letter No prior
&Air
6340 Walsh and Kelly NIPSCO Training 5 priors (Warning
(Griffith) Letter, Training)
7385 NIPSCO C&E Excavating Training 314 priors (Warning
Letter, Training,
Written Plan)
7386 NIPSCO Haskins Excavating Training 314 priors (Warning
Letter, Training,
Written Plan)
7389 NIPSCO Henry Electric Training 314 priors (Warning
Letter, Training,
Written Plan)
7391 Zachary Black NIPSCO Warning Letter No prior
7392 Anthis Career NIPSCO Warning Letter No prior
Center/Fort Wayne
7394 Mark Stevens NIPSCO Warning Letter No prior
7396 Montgomery Well Drill NIPSCO Warning Letter No prior
7397 Gordon Myers NIPSCO Warning Letter No prior
7398 Hugh McPartland NIPSCO Warning Letter No prior
7401 Lawnscape Land NIPSCO Warning Letter No prior
Management
7403 Century Builders NIPSCO Warning Letter No prior
7404 Jarrod Hill NIPSCO Warning Letter No prior
7406 Alicia Gilliard NIPSCO Warning Letter No prior
7407 Kent Gilmer NIPSCO Warning Letter No prior
5
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
3166 Vectren QC Communications Training 134 priors (Warning
Letter, Training,
Written Plan)
3547 Vectren QC Communications Training 134 priors (Warning
Letter, Training,
Written Plan)
3618 Vectren Miller Pipeline Training 134 priors (Warning
Letter, Training,
Written Plan)
4036 Vectren Rivertown Construction Training 134 priors (Warning
Letter, Training,
Written Plan)
4448 Vectren Environmental Construction Training 134 priors (Warning
Letter, Training,
Written Plan)
4568 Vectren Rininger Excavating Training 134 priors (Warning
Letter, Training,
Written Plan)
4587 C and J Construction Vectren Warning Letter No prior
4602 Vectren Meade Incorporated Training 134 priors (Warning
Letter, Training,
Written Plan)
4606 Vectren Meade Incorporated Training 134 priors (Warning
Letter, Training,
Written Plan)
4616 Double Bee Fence Co. Vectren Warning Letter No prior
4620 QC Communications Vectren Training (or $750 if 9 priors (Warning
fail to train) Letter, Training)
4638 QC Communications Vectren Training (or $750 if 9 priors (Warning
fail to train) Letter, Training)
4965 DK Concrete Vectren Warning Letter No prior
6
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
4967 Price Excavating Vectren Training (or $750 if No priors (escalated
fail to train) to training for
multiple dangerous
practices failure to
timely notify operator
of damage and self-
repair.
5153 Vectren 3D Company Training 134 priors (Warning
Letter, Training,
Written Plan)
5156 Double Bee Fence Co. Vectren Training (or $750 if 1 prior (Warning
fail to train) Letter)
5159 B.L. Brown Construction Vectren Training (or $750 if 1 prior (Warning
fail to train) Letter)
5161 Vectren Lykins Contracting Training 134 priors (Warning
Letter, Training,
Written Plan)
5163 Vectren Lykins Contracting Training 134 priors (Warning
Letter, Training,
Written Plan)
5164 Vectren Lineal Contracting Training (or $750 if 134 priors (Warning
fail to train) Letter, Training,
Written Plan)
5180 Lunar Construction Vectren Warning Letter No prior
5187 Lykins Contracting Vectren Warning Letter No prior
5188 Lunar Construction Vectren Training (or $750 if 1 prior (Warning
fail to train) letter)
5190 BL Brown Construction Vectren Training (or $750 if 1 prior (Warning
fail to train) letter)
5191 Jason Elpers Vectren Warning Letter No prior
5197 Central Fence Vectren Warning Letter No prior
7
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
5219 Bynum Fanyo Utility Vectren Warning Letter No prior
5646 Tecton Construction Vectren Training (or $750 if 1 prior (Warning
fail to train) Letter)
5664 Vectren Foley Foundations $1,000 146 priors (Warning
Letter, Training,
Written Plan)
5674 Finzel Irrigation Vectren Warning Letter No prior
5687 Vectren Pendleton P&L $1,000 146 priors (Warning
Letter, Training,
Written Plan)
5689 Rotor Rooter Vectren Warning Letter No prior
5694 Vectren Calumet Civil Contractors $1,000 146 priors (Warning
Letter, Training,
Written Plan)
5715 Environmental Vectren Warning Letter No prior
Construction
5716 Vectren Dave Q'Mara Contractor $1,000 146 priors (Warning
Letter, Training,
Written Plan)
5753 J.D.H Contracting Vectren Training 146 priors (Warning
Letter, Training,
Written Plan)
5756 Terry Pool Company Vectren Warning Letter No prior
5772 Vectren Sub Surface of Indiana $1,000 146 priors (Warning
Letter, Training,
Written Plan)
5778 Lineal Contracting Vectren $3,000 5 priors (Warning
Letter, Training)
5782 . F X Underground Vectren Training Warning Letter
8
PSD Case Index for Conference on November 5, 2014
Case Respondent Other Party Recommended Prior Penalties
No. Penalty
5802 Vectren Miller Pipeline $1,000 146 priors (Warning
Letter, Training,
Written Plan)
5804 Swinney Brothers Vectren Warning Letter No prior
5809 Teds Plumbing Vectren Warning Letter No prior
5814 Bloomington Utilities Vectren Warning Letter No prior
6041 Roger Wallace Vectren $500 + training No prior. Escalated
penalty. Excavator
clamped off the line
and failed to notify
operator of leak for
2weeks
6044 John McClintic Vectren Warning Letter No prior
6050 Vectren Town of Plainfield $1,000 146 priors (Warning
Letter, Training,
Written Plan)
6058 Gilliland Trucking Vectren Warning Letter No prior
6059 Slater Construction Vectren Warning Letter No prior
6064 Vectren Poisel Construction $1,000 146 priors (Warning
Letter, Training,
Written Plan)
6066 Vectren Evansville Water/Sewer $1,000 146 priors (Warning
Letter, Training,
Written Plan)
6067 Randy's Tree Service Vectren Warning Letter No prior
6068 Mr. Fence Vectren Warning Letter No prior
7502 Brian Spencer Vectren Warning Letter No prior
9
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: QC Communications Other Party: Vectren Case No.: 4620 Date of Advisory Meeting: August 26, 2014 Date of Damage: 4/10/2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter Special instructions: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Lit Training or $750 civil penalty if fail to take training
D Civil penalty of $ ________________ _
D Other -------------------------------------------
Additional Information: -----------------------------------
APPROVED: IL III ~ ----~~---------------------------------(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: QC Communications Other Party: Vectren Case No.: 4638 Date of Advisory Meeting: August 26,2014 Date of Damage: 4/17/2014
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter Special instructions: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
~ Training or $750 civil penalty if fail to take training
D Civil penalty of $ ________________ _
D Other -------------------------------------------
Additional Information: -----------------------------------
APPROVED: __ ~~~~~~v----__________________________ _ (initialed) Ben Warren
Chairman
Committee Recommendation to IURC
Respondent: NIPSCO Other Party: Acorn Landscaping Case No.: 4956 Date of Advisory Meeting: August 26, 2014 Date of Damage: April 24, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f): mislocate or failure to locate
The Advisory Committee recommends the following penalty: ~'f'~ro~ ~r 1 'JSO \f: =f<u I
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------
APPROVED:~~~~0~~~ ______________________________ _ (initialed) Ben Warren
Chairman
Coahran, Lisa
From: Erich, Kelsey Sent: To:
Monday, December 01,201410:04 AM Coahran, Lisa
Subject: RE: 4956 - No Investigative Summary
It appears Mike changed the case to a No Violation. He put notes in the database indicating this, but I don't have any additional information.
Thanks,
Kelsey Erich
Indiana Utility Regulatory Commission
101 West Washington Street, Suite 1500 E
Indianapolis, IN 46204
Confidentiality Notice: This e-mail transmission may contain deliberative, confidential or other legally privileged information that is not subject to public disclosure under Ind. Code § 5-14-3-4(b), and is intended only for the individual or entity named in the e-mail address. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this e-mail is strictly prohibited.
From: Coahran, Lisa Sent: Monday, December 01,20149:56 AM To: Erich, Kelsey Subject: 4956 - No Investigative Summary
Kelsey,
There is a Recommendation Form for 4956 in the folder for this case, but no Investigative Summary. I need the summary to merge with form for the Commissioners. Can you locate and forward?
Thanks.
Lisa Coahran Legal Assistant - General Counsel Indiana Utility Regulatory Commission 101 W. Washington St., Ste. 1500 E. Indianapolis, IN 46204 Tel: (317) 233-6140
1
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: NIPSCO Other Party: Miller Pipe Line Case No.: 5662 Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 03,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
dvisory Committee recommends the following penalty: 000
Special instructions ifwarning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;.e=l=ki=· n=g:t....,;;;;a=b.;;;..;st=a=in=s~ _____ _
APPROVED: __ ~~~~< __ ~~~~====== ________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Larry Norman NIPSCO 5663 June 24, 2014 Tuesday, September 03, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory commi~~ommends the following penalty: \j ()f,/\~ . \ c_ .
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S;;;..e=l=ki=· n=g=....;:;:;a=b.;;;..st=a=in=s;;....-_____ _
APPROVED: __ ~~ ___ ~~~===~~ __________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Other Party: Foley Foundations Case No.: 5664 Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Advis !y Committee recommends the following penalty: . \000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: L v-----~---------------------------------------(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
NIPSCO Miller Pipe Line 5665
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: $ IDDO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....:;;;;.S=el;.:;;ki::;;,;·n::;;,;gr:a...;;:;a;..;;;;b.:;;.st.:;,;;;a;.;;.in::;;,;s~ _____ _
APPROVED:~~~~ht~~~ _________ ____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO GE Marshall Inc 5667
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The AdV:3ry Committee recommends the following penalty: If)CP
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ -=.Se=l=ki=· n=g=-:;;:a=b.:;;.st=a=in=s=....-_____ _
APPROVED: ___ ~~ __ ~ __ ~~~_-_-__________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO Precision Trenching Inc 5671 June 24, 2014 Wednesday, September 04, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Adviso Committee recommends the following penalty: cO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S""-e.;;..;;l=ki=· n=go::::a.....;;..a=b""-st.;;.;;.a=in=s"'--_____ _
APPROVED: (initialed) -----------------------Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Hoosier Property Maintenance And Snow Removal Inc
Other Party: NIPSCO Case No.: 5672 Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory ~ommitte~mends the following penalty:
WMY\\~ \c Contactin 811
SelfRe air
Additional Information: ____ ..;.;S;...;;;e.;;;;lki=·=n-=g...;;.;a;...;;;;b..;;;..st=a=in=s~ _____ _
APPROVED: L IJ~ -----~----------------(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: t=; {"\ L eJ Other Party: Ve.c-kn Case No.: 5 lat Y Date of Advisory Meeting: _____ ~.....;.I.--L...;...L/~/ L-I LI.....L.-________ _ Date of Damage: q 7 5" J I 3
The lURe Pipeline Safety Division finds the following violation: \ c.. :b - l - '2 (, - 'J...D (ct) L L.) .
The Advisory Committee recommends the following penalty: ~ "in \JJ (i)[II\\ "j lew
Additional Information: -------~---------
APPROVED: __ ~ ____ ~_~ ________________________ ___ (initialed)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent:
Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
J & B West Construction And Remodeling NIPSCO 5675 June 24, 2014 Thursday, September 05, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Adviso,ry Committee recomm,S!1ds the follo,,:ing penalty: T (l (\ ~ 0"- ~ 50C)O ,. -+ ~ \
S ecial instructions i warni letter: White Linin Potholin Contactinu 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ...:;;S;..;:;e~lki=·=n.z:Lg...:;;a;.;;;;b..::;;..st=a=in=s~ _____ _
APPROVED:~~~ ___ ~_~ ________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Green Thumb Landscaping Other Party: Jasper Municipal Gas Case No.: 5676 Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 06, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)
The Advisory Committee recommends the following penalty: ltfar: V\ ~ "j \ e:\-\u-
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------
APPROVED: ____ ~ ______ ~~~===~ ___________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Habitat For Humanity 5678
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 06, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: S \QDD
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ --'S.;;;...e.;;.;;.l=ki=· n;;;.;.og=....;;.;;a..;.;.b.;;...st.;..;..a;;.;.;.in.....;s"'--_____ _
APPROVED: __ ~~F=--~~--~--~~~~------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO Lee Excavating 5682 June 24, 2014 Friday, September 06, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: ()' \ Of)D
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;...e=l=ki=·n=g::::L-,.;.;;a=b;;;...st=a=in=s~ _____ _
APPROVED: ___ ~ ____ ~ __ t_-_~ ____ - __________________ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Lawson Electric NIPSCO 5683
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 06, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: WMV\i~ leJkr
S ecial instructions i warnin letter: White Linin Potholin Clearance Zone (Two-Foot Rule) Damaging Lines
Additional Information: _____ S;;;;;..e=l=ki=· n;;;;;.,jg::::t....,;.;;a=b.;;;..st,;;.;;,a=in=.;;;;...s ______ _
/ 1!_1 APPROVED: __ ~~ ___ hl __ IC-___________________________ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Mike Thompson NIPSCO 5686
Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 09, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(prior)
The Advisory Committee [;-mmends the following penalty:
I .d (),r n ~ I.e., Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e=l=ki=· n=g=.....;.;;a=b.;;..st=a=in=s~ _____ _
APPROVED: _____ ~~~~~\~~~ ___________ ~ ________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Vectren Pendleton Power & Light 5687
Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 09, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Advisory Committee recommends the following penalty: 5 \000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: L !L-------~=-----------------------------------------------------------------------
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: NIPSCO Other Party: H & G Underground Utilities LLC Case No.: 5688 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 09, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Advisory Committee recommends the following penalty: -j)\OOO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S;;;;;.e=l=ki=· n=g:::s.....:;;;a=b.:;;..st=a=in=s:::....-_____ _
APPROVED: __ ~~. ~~i1~~~ ______________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Roto Rooter - I Y\d \'n.napu \\ ~ Vectren 5689 June 24, 2014 Tuesday, September 10, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)
The Advisory commW ecommends the following penalty: \0(}J V\\~ ~e;
Potholino Contactin 811 SelfRe air
Additional Information: -----------------------------------
APPROVED: ~ hl~ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
Skyway Trucking Inc NIPSCO 5692
Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 10, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penal~
~~)nO("" j SUQO . f ~'I Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e=l=ki=·n=g::t....,;;.;;a=b.;;..st=a=in=s~ _____ _
APPROVED:~t:~ ___ ~ __ ~ ________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Vectren Calumet Civil Contractors 5694
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 11,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The A visory Committee recommends the following penalty: \00
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: ______ ~~ _____ ~~ _____ K--_--____________ ---_____ ~ ______________________________ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Pavey Excavating Incorporated 5696
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 11,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Ad~SOry Committee recommends the following penalty: \00)
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S"'-e.;;;..;;l=ki=" n=g=-.;;..;;a.;.;.b",-st.;..;.a=in.;;...s~ _____ _
APPROVED: ___ ~~~~_~~-=~ _________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Grimmer Construction Company 5698
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advis ry Committee recommends the following penalty: \OE)O
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ --.;.;;..Se=l=ki=·n=g~a=b.;;;;..st=a=in=s~ _____ _
APPROVED: __ ~~· ~~Li~~ ________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Grimmer Construction Company 5699
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: :\\000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S~e=l=ki=·n=g=.....;;.;;.a=b=st=a=in=s~ _____ _
APPROVED: __ ~~· ~~~~~ __________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Kihn Concrete Community Natural Gas, Inc. 5701
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12, 2013
The lURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committey recommends the following penalty: \d a)U\~ ~e.ttur
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Infonnation: ~ ) ok '. d f' \ 1/ ; ~ \ 5 c.o I{\ S \ ~ e...d \' ~)LCQ.AJ a..::f-l OVl 'I un c::!...Lr
APPROVED: __ ~~ _____ LL_~ ______________________ ____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
Hoosier Fence And Deck Incorporated NIPSCO 5702
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(1)
The Advisory Committee\rec,qmmends the following penalty: UO,}{Y\ , 0j e.-'\-Kf
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S.;;..e=l=ki=·n=gc::o.....;;.;;a..;.;.b.;;..st.;;.;;.a=in=s~ _____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Pfister Sprinkler Systems NIPSCO 5704
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 13,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory ~ommittee recommends the follow~ng penalty: . :1-X:CU (\\N){ 0 (" :t 5000 \ + +Cl.J I
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e=l=ki=·n=g~a=b.:;;..st=a=in=s~ _____ _
APPROVED: __ ~~ __ V_~ ______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Ben Potis NIPSCO 5i06
Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, September 14, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty:
l ! \ a m~ leh Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;.;;;.S..;;;.;el=ki=· n=g=-..;.;;a=b.;;;..st=a=in=s~ _____ _
APPROVED:~~~~ __ ~~· ~=. ==~~~~ ________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Hoosier Fence & Deck Incorporated 5708
Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 16, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Ad5;f&iJmmittee recommends the following penalty:
Special instructions i(warningletter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S.;;;;...e~l=ki=·n=g=......;;.;;a=b.;;;;...st=a=in=s~ _____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Pete Saint Mary 5709
Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 16, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: S \otD
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ --.;S.;;;..e=l=ki=· n=g=-.;.;;.a=b.;;;..st=a=in=s~ _____ _
APPROVED: __ ~~~ __ ~_Y ________________________ __
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO Fort Wayne City Utilities 5710 June 24, 2014 Monday, September 16, 2013
The lURe Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The dvisory Committee recommends the following penalty:
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....:S;;;;..e:::;.;;l~ki;;;;,;· n;=.lg=-=a=b.:;;;..st:;.;;a:.:;;in;;:;s~ _____ _
APPROVED: __ ~_· __ ~~~~_' ______________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO Schneck Excavating Incorporated 5711 June 24, 2014 Tuesday, September 17, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Ad~Ory Committee recommends the following penalty: IDOO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ....:S;;:;.e=l=ki=·n=g::L...,;;.;;a=b.;;;.st=a=in=s~ _____ _
APPROVED: __ ~.~~ ___ ~~~~ ____________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Earth Construction Inc. NIPSCO 5712
Date of Advisory Meeting: June 24, 2014 Date of Datnage: Tuesday, September 17,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)
The Advisory Committee recomme~~ the following penalty: :fOrnJ ~ 0 r :50 00 i +- A,. I Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S;;;;..e=l=ki=· n=g=-:;.;a.;;;.b.;;;..st=a=in=s;;;....-_____ _
APPROVED:~~~~L1~~-~----------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Environmental Construction Vectren 5715
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 18,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee ftsommends the following penalty: WQx-vll j \e~~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED:~~-------~~~---=~~~-------------------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Vectren Dave O'Mara Contractor 5716
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 18,2013
The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The AdViSO:§ Committee recommends the following penalty: fcP2
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ____ ~~~~~------------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
City Of Valparaiso Sewer Department NIPSCO 5718
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 18,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advis~ry Committee recommends the followin~ penalty: . -r rOJ 1'\\ ~ 0 r ::l ~O It- !;a, , /
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ......;.;;;..Se=l=ki=·n=g::::t....,;;,;;a=b.;;;..st=a=in=s~ _____ _
APPROVED:~.~~ __ ~~~~ ________________________ _ (ini tial ed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: NIPSCO Other Party: Earth Construction Inc. Case No.: 5721 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 19, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: j)\DCO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;,.e;:.:;l:;.;;,:ki;::;.:" n;;.zg=-=a=b..:;;..st:;,.:;a=in=s:=:....-_____ _
APPROVED:~~ _____ ~~~ ______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO Indiana Earth Incorporated 5728 June 24, 2014 Friday, September 20, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Advisory Co~mittee recommends the following penalty: S\00U
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e=l=ki=· n=g::t...,.:;;:;a=b.::;;..st=a=in=s:=:....-_____ _
APPROVED: __ ~~ ___ ~_c __ ~ _____ -~-----------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Citizens Energy Group Millenium Contractors 5729
Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, September 21, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: 5\000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: Warren abstains ----------------~~~~~~==--------------------------
APPROVED: ____ ~~ ________ ~(~--------------------------------------(initialed) Dan Meiners
Vice Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Michael Hough NIPSCO 5731
Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, September 21, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committ~mmends the following penalty: Ir0Qx(\\ ~ ~e5
Special instructions i{warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ~S.;;.;el=ki=·n=g~a=b..;;;..st=a=in~s ______ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lagrange County Remc Other Party: NIPSCO Case No.: 5734 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 23, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee l ~ecommends the following penalty: Wcu-n,~ \e\iV'
Contactin 811 SelfRe air
Additional Information: ____ ....;.;S;;;...;e;;.;;;.lki=·n;;.o::ga....;;a;.;;.;;b;;..;;;s;..;;.;ta;.;;.;i=n;.;;;.s ______ _
APPROVED: I ~ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Kankakee Valley Remc 5735
Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 23, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty:
S loW Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ -.;S;;..e=l=ki=" n=g=-=a=b.;;;..st=a=in=s~ _____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Riccis Landscape Management 5739
Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 24, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: :j))QDO
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ---"'-S..;;..;el=ki=o n=go::a...;;.;;a.;.;.b.;;;..st.;;.;;.a=in=s""---_____ _
APPROVED: ___ ~~ __ ~~~~ ______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Kline Excavating Inc 5741
Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 24, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: ,:J lEPO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .-..::;;..S.;;.;el:;:;,;ki:;:;,;· n:=.lg=-:;;:a=b..:;;.st::.;;a;.::.in=s~ _____ _
APPROVED: __ ~~~ ___ ~ __ ~ ____________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Ge Marshall Inc 5743
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 25, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: 3 \000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ......;.;;;..S..;..;el=ki=· n=g~a=b.;;;..st.;;..;.a=in=.;;;...s ______ _
.~ 'L--APPROVED: ______ ~~----f/--~-------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Middlebury Septic Inc NIPSCO 5747
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 25,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committry recommends the following penalty: \,0 {).jr-y\ ~ lk We/' .
Contactin 811 SelfRe air
Additional Information: ____ ..;;;S;;..;;e;.;;;.;lki=·=n~g...:;;a;.;;;;b...;;..st=a=in=s~ _____ _
APPROVED: __ ~~~_il----____________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO NIPSCO 5749
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
visory Committee recommends the following penalty: 000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S;;;;..e=l=ki=·n=g=:t......:;;a=b=st=a=in=s~ _____ _
APPROVED: ___ ~ ____ ~_n ________________________ __
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Advanced Irrigation 5751
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: ~\Of)O
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S"'-e.;;.,.;;l=ki=· n=g:::o....;;.;;a=b"'-st.;..;;.a=in=s;;........ _____ _
APPROVED: __ ~~~ ____ ~_· _~_--~~~ __________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No. :
Citizens Energy Group K And K Fence Company 5752
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advis ry Committee recommends the following penalty: I. 000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: Warren abstains ----------------~~~~~~==--------------------------
APPROVED: __ ~~~~~ ________________________ _ (initialed) Dan Meiners
Vice Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: J.D.H. Contracting Other Party: Vectren Case No.: 5753 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)
The Advisory Committee recommends the following penalty: rCCL\ £\ \ 'J:;:: Q r ~ snO 0 .) +-- +' a.... I
Special instructions i[warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: _£u-' __ A1_~~ _________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO L G S Plumbing Inc 5755 June 24, 2014 Thursday, September 26, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advis !y Committee recommends the following penalty: \000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S;;;;..e=l=ki=· n=g~a=b=st=a:.;.in=s:::..-_____ _
APPROVED: ______ ~~ __________ AL_~ _______________________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Terry Pool Company Vectren 5756
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(expire)
The Advisory Committee, ~ecommends the following penalty: \A )c1X:n I~ W~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED:~~~ ___ iJl~_~~~=== ___________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
NIPSCO BAnd W Specialized Drilling 5757
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: 3 \000
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S;;;;..e=l=ki=·n=g::a...;;.;a=b.;;..st=a=in=s~ _____ _
APPROVED:_~~~_L1_~_--__ -_· _______ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Rebecca Cartwright NIPSCO 5768 June 24, 2014 Saturday, September 28, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee ry~ommends the following penalty: ~Qx- Y\ \ ~ \.U~r
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S.;;;...e;;..;;l=ki=·n=g::::t.,..,,;..;a.;.;;..b.;;;...st;..;;.;a=in=s~ _____ _
APPROVED: (initialed) ----------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Vectren Sub Surface Of Indiana Inc 5772 June 24, 2014 Monday, September 30,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(1)
The AdViSj; Committee recommends the following penalty: \DOO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: _____ ~~==_._. ~JV( _____ ~ _______________________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Lineal Contracting Vectren 5778
Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, October 01, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
visory Committee recommends the following penalty: DeD
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED:~~~~~~~~~~~~~~~-(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
F X Underground Vectren 5782 June 24, 2014 Wednesday, October 02,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(I)
The Advisory Committee recommend&the following penalty: '\ f'(lA"rI!g D (' J :s 0 {)f) • + -/'-a...". , I
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ____ ~~ ___ ~tCL_c_~~~_-_-________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Rothenberger Company Inc NIPSCO 5784
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, October 02, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory ComJt1it~~e r~commends the following penalty: vJar~\!j \L~
Contactin 81i SelfRe air
Additional Information: _____ S;;;;;..e=l=ki=· n=g::t....,;;;;a=b=st:.;;a=in=s~ _____ _
APPROVED: ___ ~ __ ~tJL----________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Rieth Riley Construction NIPSCO 5785 June 24, 2014 Wednesday, October 02, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(prior)
The dvisory Committee recommends the following penalty: . ODO ...
•
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S~e=l=ki=·n=g~a=b~st=a=in=s~ _____ _
APPROVED:~~~ __ )0~~ ___________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Van Gordon Construction Incorporated NIPSCO 5788 June 24, 2014 Thursday, October 03, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recomI}1;ends the following penalty:
lU (}Jr n.~ tVJdcf Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ --'S.;;;...e.;;..;;l=ki=· n=g:o....;;.;.a.;.;..b.;;;...st;;..;;.;a=in=s"'--_____ _
/
APPROVED:~~~~~~~~~~~~~~~~~_ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Migul Becerril NIPSCO 5799
Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, October OS, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Com ittey\recrommends the following penalty: VJ OJ V\ f' C\rtL
Contactin 811 SelfRe air
Additional Information: ____ ...;.;;S;..;;;e..;;;.;;lki;.;;;·;.;;;n.o:::o.g..;;.;a;..;;;b..;;..st.;..;;.a;.;;;in;.;;;s~ _____ _
APPROVED: _____ ~~~~~~-----------------------------------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Zach Raymond NIPSCO 5800
Date of Advisory Meeting: June 24, 2014 Date of Damage: Sunday, October 06, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)
The Advisory Committee re:JWllends the following penalty:
\A.} Ilrl'\~ ~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .......;.;;;..S.;;..;el=ki=· n=g=-.;..;;a=b.;;;..st=a=in=s~ _____ _
APPROVED: ___ ~ ____ ~_· ~ __ ---______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
NIPSCO Rivers Edge Construction 5801 June 24, 2014 Monday, October 07, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The dvisory Committee recommends the following penalty: \OCQ
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S~e=l=ki=·n=g=.....;;.;a.;.;;;.b~st.;.;.a=in=s~ _____ _
APPROVED:~~~~~~=====~~~~~~~_ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Vectren Miller Pipe Line 5802 June 24, 2014 Monday, October 07, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The AdvisorY Committee recommends the following penalty: j) \OL)O
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: tJ\\ \ \ u oJo&i--oJ'vl~.
APPROVED: __ ~~~~~~~_' ______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Swinney Brothers Vectren 5804 June 24, 2014 Tuesday, October 08, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)
The Advisory Committee reco mends the following penalty: Q.rn \ tv
Contactinu 811 SelfRe air
Additional Information: -----------------------------------
APPROVED: ___ ~~~---~---~-~-------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: NIPSCO Other Party: Walsh And Kelly - Griffith Case No.: 5808 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Advisory Committee recommends the following penalty: . ~JDOO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ________ S ..... el_ki ..... · n __ g~a.-..b __ st.;..;.a=in __ s~ _____ _
APPROVED: __ ~~~---~-~--~----------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Teds Plumbing Other Party: Vectren Case No.: 5809 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty: lA.JQ fy\)~ \, W
\ 0
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information:
(initialed)
----------------------------------------------------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO BAnd W Specialized Drilling 5811
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: ,$~OOO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;;..e=l=ki=· n=g:t....,;;.;;a=b.;;;..st=a=in=s~ _____ _
APPROVED: __ ~~~ __ ~ _____ - ____________________ __
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Bieson Excavating Inc. Rennselaer Municipal Gas System, City Of
Case No.: 5812 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee re~ends the following penalty: \A \(l..[V\ I~ \1,
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ___ ~~ ____ ~ ___ ~_· _______________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: City Of Bloomington Utilities Other Party: Vectren Case No.: 5814 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 30, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Commit~ye recommends the following penalty: w(U-Y\r~ \tW
Special instructions if warning letter: White Lining Potholing Contacting 811 Qtearance Zone (two-Foot ~ Damaging Lines Self Repair
Additional Information: --------------------------------------------------------------------
APPROVED: _____ ~~~ ______ ~ _____ =~~~~~ ________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Wallace, Roger Vectren 6041
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013
The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)
The ~dvisory Committee recommends the fol~wing penalty: c.l2 5DO -\- +v-~ .. :): ()..- 2) sro 0 j-r-
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: --------------------------------------------------------------------
! J~-APPROVED:~~~ ___ ~~_~~_-____________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Me Clintie, John Veetren 6044
Date of Advisory Meeting: June 24, 2014 Date of Damage: Sunday, September 29,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee,l1ecommends the following penalty: W(lj[n I~ l e.'-\-\if
Potholino Contactino 811 SelfRe air
Additional Information: -------------------------------------------------------------------
APPROVED:~~ _____ ~~ _________________________________________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Vectren Plainfield, Town Of 6050
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 13,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The AdViS3 Committee recommends the following penalty: \CJOO
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: _____ ~~ _____ ~~~v---_____ ~~ _____ - _________________________________________ ~ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent:
Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Gilliland, Robert Trucking & Excavating
Vectren 6058 June 24, 2014 Wednesday, September 25, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)
The Advisory Committee r commends the following penalty:
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ___ ~~~----~---1~~~--------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Slater Construction Other Party: Vectren Case No.: 6059 Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 25, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee ecommends the following penalty: CL'r(\ \ V""
S ecial instructions 1 warnino letter: White Linin Potholin Contactino 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: --------------------------------------------------------------------
APPROVED: ___ .~~--~h4~~---------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: . Case No.:
Vectren Poisel Construction 6064
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 11,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The AdvisorY Committee recommends the following penalty: S \O()O
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information:
(initialed)
----------------------------------------------------------------------
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Vectren Evansville Water & Sewer Dept 6066 June 24, 2014 Monday, September 23,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Advisory Committee recommends the following penalty: ~\OE)O
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ____ ~ ______ ~~ ___ ~_' ______________________________ ___
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Mr Fence, Inc Other Party: Vectren Case No.: 6068 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(I)
The Advisory Commi e recommends the following penalty: \ \6
Contactin 811 SelfRe air
Additional Information: ------------------------------------
APPROVED: __ ~_=~ ___ ivL~~ ___ --_______________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Randys Tree Service Vectren 6067
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 20, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: _____ ~~~~~~: ~-~~~---------------------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Qualkenbush Brothers Isral Qualkenbush
Other Party: Indiana Natural Gas Corporation Case No.: 6313 Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, October 25,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: -tv-ru (\ i fi::l or j s-o 00 I~ :.ta....' J
Specialinstructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: 5~ ±tau (\I' ~ C<LS e.. 'i\ o. Co '330 . '\) D V'\. o-\- D!l v-L to
APPROVED: ___ ~ __ ~~~~ ________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Conwell Construction Indiana Natural Gas Corporation 6329
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)( expire)
The Advisory Committee ree mends the following penalty: (lyhl
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: _____ ~~~ _____ ~ _____ ~_----________________________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent:
Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Qualkenbush Brothers Isral Qualkenbush
Indiana Natural Gas Corporation 6330 June 24, 2014 Thursday, October 03, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: i s-oo + ~o._(~::~ () r <f ~(j au I f-
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED:~~ __________ ~_~_=~~ __________________________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
Jerry Hammond Midwest Natural Gas Corporation 6331
Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, October 19, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: \. tOJrV\i ~ \e-W
S ecial instructions i warnin letter: White Linin Potholin Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information:
81
--------------------------------------------------------------------
APPROVED: ___ ~~~ _____ ~ _____ o-_____ ~~= _____________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent:
Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Service Experts Heating & Air Conditioning NIPSCO 6334 June 24, 2014 Friday, October 11,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee, , ecommends the following penalty: \U OJrVl "0j Lu~
Contactin 811 Self Re air
Additional Information: ____ ...;.;;S;....;;;e~lki=·=n=.g~a;.;.;;.b..;;;;..st.;;.;.a=in=s~ _____ _
APPROVED: _____ ~~~ _____ ~~~~ _____ ---__________________________________________________ _____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
R & R Excavating NIPSCO 6338
Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, October 14,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)
The Advisory Committee r~fom~ends the following penalty: \0 ('ifY\ l~ Lt.,\-k-f
Special instructions if warning letter: White Lining Potholing ·Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ -..;S;;;..e=l=ki=· n=g=-..;;.;;a=b.;;;..st=a=in=s~ _____ _
APPROVED: __ ~~~~~~~== ____________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
G ct}'C1·.t.,¥>, Ok Respondent: Walsh And Kelly -~oHth BeAd Other Party: NIPSCO Case No.: 6340 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, October 14,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee recomm ends the follow.inlS penalty: J
-+-rQlJv\: ~ c> r J, $"C7LJD I +- ..(2Q..!.
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ~S...;;.e=lki=·=n.=.g...;.;a...;;.b~st.;;.;.a;.;;.;in;.;;.;s~ _____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO C & E Excavating 7385
Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, July 03, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Advisory Committee recommends the following penalty: --hOJ (\ i ""j /) r $ 750 i + ~ · I
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S""-e=l=ki=·n=g=.....;;.;;a=b""-st=a=in~s ______ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Haskins Excavating 7386
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 11,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory C~mmittee recommends the follow~n.s penalty,: :\:[{),.\(\\ ~ or \$ '150 1+ -!'cD'
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S;;;..e=l=ki=·n=g=-=a=b.;;..st=a=in=s~ _____ _
APPROVED: __ ~~ __ LL~~ __ -~~~~ ________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
NIPSCO Henry Electric 7389
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 18, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty: -+rQ,)f\\~ 0"- .1 7s--c::J ' t k'/
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ ...... S .... e __ l ...... ki.;;.;..· n ..... g::::o.....;..;;a.;.;;..h .... st;.;;..a;.;;;.;in=s"""'"--_____ _
APPROVED: __ ~~ ___ ~_v=~~~~~~~ ________________ ____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Zachary R. Black Other Party: NIPSCO Case No.: 7391 Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, July 06, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: \" ;Grn )".:) \l±\e£
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S:;;;..e;:;,;;l:.=,;;ki;.:· n:;:.;g=a....;;:a=b=st=a:.:;,in:;;.s~ _____ _
APPROVED: __ ~~~ ___ ~_~_· ______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent:
Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Anthis Career CenterlFort Wayne Construction Trades NIPSCO 7392 June 24, 2014 Monday, July 08, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: \da.x-V\~ ILW
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S.;;;..e.;;..;;l=ki=· n=g::::L...;;.;.a.;.;;.b.;;;..st;.;.a=in=s;;.....-_____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No. :
Mark Stevens NIPSCO 7394
Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 11, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: '\ )Qx-V\~ k{kr
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e=l=ki=· n=g=....;;;a=b.;;;..st=a=in=s~ _____ _
APPROVED: __ ~~ __ ~~~~~ ______________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Montgomery Well Drrill Other Party: NIPSCO Case No.: 7396 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 11,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: , D ().A"" f'"\ \""=3 \,L W-
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e;;;.;;l=ki=· n=g::t....,;;,;;,a=b.;;;..st=a=in=s~ _____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Gordon Myers NIPSCO 7397
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, July 12, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee reco~1f1ends the following penalty: W a;r Y\ \' ~ \L.,\-lGV-
Special instruCtions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S._.e ..... l __ ki ..... · n .... g~a-.b._.st-.a __ in __ s~ _____ _
APPROVED: ___ ~~~_A%~~~ ____________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Hugh Mcpartland NIPSCO 7398
Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, July 12,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: o (ly n 'Y:::J lk1;k.-r
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....;S.;;..e.;;.;;l=ki=· n=g~a.;.;;.b.;;..st;;...;.;a=in=s"'--_____ _
APPROVED: __ ~~~ ___ ~~~~~_-_-_-_-________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Lawnscape Land Management NIPSCO 7401
Date of Advisory Meeting: June 24,2014 Date of Damage: Friday, July 12,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: \ },,) ().Jr VI i 'j u K\-uC
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;..e=l=ki=· n=g:t.,....;;.;;.a=b;;;..st=a=in=s~ _____ _
APPROVED: ____ ~ _____ ~~~_· ______________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Century Builders NIPSCO 7403
Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, July 13, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee,rewnutlends the following penalty:
\M()..fVl~ ~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ______ S;;;;..e=l=ki=· n=g::a..;;.;;a=b.;:;..;st=a=in=s;;.....-_____ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Jarrod Hill NIPSCO 7404 June 24, 2014 Saturday, July 13, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)( expire)
The Advisory Committee recoIAmends the following penalty:
\A.J Q..Jr V). '''J '-<--~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S.-.e.-.l=ki=· n;;;;."g=-..;;.;;.a=b.-.st=a=in=s~ _____ _
APPROVED: ___ ~~~~~~ _________________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Alicia Gilliard NIPSCO 7406
Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, July 16, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee r=~ends the following penalty: wCUr V\\~ \tJ Y
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ____ .....:;;;;.S=el=ki=· n=g=-:;:a~b.:;;.st::.:;a:.::.in:::::.:;;...s ______ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
Kent Gilmer NIPSCO 7407 June 24, 2014 Tuesday, July 16, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory committee~ends the following penalty: \ j\j Cl.Y:V\ ~
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _____ S;;;;..e=l=ki=· n=g~a=b.:;..st=a=in=s::.....-. _____ _
APPROVED: __ ~~~ __ ~ ___ ~~~~_-_-_-________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Brian Spencer Other Party: Vectren Case No.: 7502 Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, July 19,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)
The Advisory Committee r~::=ends the following penalty: t U <l.Xf\ , ~ \.L,~
letter: White Linin Contactin 811 l-t Self Re air
Additional Information: ----------------------------------------------------
APPROVED:~~~ ____ hL_~~_-____ -_____________________________ _____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Key Concrete, Inc. NIPSCO 5209
Date of Advisory Meeting: August 26,2014 Date of Damage: July 29, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2) - failure to maintain two (2) feet of clearance with mechanized equipment.
The Advisory Committee recommends the following penalty:
D Warning letter Special instructions: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
~ Training or $750 civil penalty if fail to take training
D Civil penalty of $ ________________ _
D Other --------------------------------------------
Additional Information: .;;;;.S.;;.;el=ki=·n;;;.zg~ab;;;;..;s;;..;;t=a=in=s __________ _
APPROVED: .~ ~~ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Other Party: Qc Communications, Inc. Case No.: 3166 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, June 08, 2012
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Advisory Committee recommends the following penalty:
. -h'oo 'Di~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------------------------------------------
APPROVED: _____ ~ ___________ tL _____ ~ ____________________________________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant . Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Other Party: Qc Communications, Inc. Case No.: 3547 Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, August 08, 2012
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Advisory Committee recommends the following penalty: c\'('Q, \ (\ \ "j
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _________________ _
APPROVED: ___ ~ ___ ~~~ ________________________ __
(initialed) Ben Warren Chairman
\
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
VECTREN MILLER PIPELINE 3618 May 20, 2014 8/23/2012
The IURC Pipeline Safety Division finds the following violation:
IC 8-1-26-18(1)
The Advisory Committee recommends the following penalty:
'IQ...\()\~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _ ...... tA.....lII....\ \~lr~----.;o=L:;.:...h.....:.~~CLl=.;..'fL..;.....;....;;~=--___ _
APPROVED:_~~~_iL_~_~===~~ _________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
VECTREN RIVERTOWN CONSTRUCTION 4036 May 20, 2014 10/16/2012
The IURC Pipeline Safety Division finds the following violation:
IC 8-1-26-18(t)
The Advisory Committee recommends the following penalty: - ' \ '\0. ~\ D \~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ___ ~~~ ___ ~~~ __________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
VECTREN ENVIRONMENTAL CONSTRUCTION 4448
Date of Advisory Meeting: May 20,2014 Date of Damage: 2/1/2013
The IURC Pipeline Safety Division finds the following violation:
IC 8-1-26-18(f)
The Advisory Committee recommends the following penalty:
l' \[(\ \(\~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: -------------------------------------------------------------------
APPROVED: _____ ~~~ ______ JCi_~_==~~ ________________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Vectren Rininger Excavating Incorporated 4568
Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, March 20, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(1)
visory Committee recommends the following penalty: \ \
, \ '
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED:~~~_~~~ __________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Respondent: Other Party: Case No.:
C And J Construction Vectren 4587
Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, March 28,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty: 11 )Ct--Y n I~l If- He:r'
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: _ih,--,-,~I'1"'""'lt"-_r_~a ........ 6s"",("",k"",,,,---~ ..... , _1\....;:;0>5..:.-____ _
J 1 C---APPROVED: ~ We-
--~~-------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Other Party: Meade Incorporated Case No.: 4602 Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, April 04, 2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Advisory Committee recommends the following penalty: --h-Ci ,\{I \~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED:~~~ __ ~_~ ________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC .
Respondent: Other Party: Case No.:
Vectren Meade Incorporated 4606
Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, April 04, 2013
The lURe Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)
The Advisory Committee recommends the following penalty:
rtUG\\~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: --------------------------------------------------------------------
APPROVED: ___ ~~ __ ~_~_--~_-________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Double Bee Fence Company Other Party: Vectren Case No. : 4616 Date of Advisory Meeting: May 20, 2014 Date of Damage: Tuesday, April 09, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(1)
The Advisory Committee re~ends the following penalty: ().,f f\\':) \e ~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ____ ~~ ____ ~ ___ ~ _______ . ________________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
QC COMMUNICATIONS, INC. VECTREN 4620
Date of Advisory Meeting: May 20, 2014 Date of Damage: 4/10/2013
The IURC Pipeline Safety Division finds the following violation:
IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following p~nalty: ;gw{',,;@:, O r j ,sU \ * f QI I
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: -----------------------------------
APPROVED: __ ~~ __ ~~~~_~~_-_-____________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:
QC COMMUNICATIONS, INC. VECTREN 4638 May 20, 2014 4/17/2013
The IURC Pipeline Safety Division finds the following violation:
IC 8-1-26-20(a)(2)
The Advisory Committee recommends the followin~ p~nalty:
Ir~~~ o( $ /sc> ,{ t-Cv I -tu Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ________________ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Dk Concrete - Daniel Padilla Perez Other Party: Vectren Case No.: 4965 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, May 31, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committe recommends the following penalty: ¥
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: (}rJ I llr C0b~ 'f"\,5
APPROVED: __ ~~ __ (j_~ ______________________ __ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Price Excavating Other Party: Vectren Case No.: 4967 Date of Advisory Meeting: May 20,2014 Date of Damage: Thursday, June 13,2013
The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)
The Advisory Committee recommends the following penaltY.: ..-.-( (u (\\ "'J o.~ $ 1'5-0 · /-- -!--a.. I fv
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
APPROVED: ___ ~~ __ ~~ _____ .~_-_--___________________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Other Party: 3D Company Case No.: 5153 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, June 28, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Advtsory Committee recommends the following penalty:
·-tro.1011 Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED:~~~ ___ ~_c __ --___________________ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Double Bee Fence Co Vectren 5156
Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, July 12,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)
The Advisory Committee rec~ends thr following penalty:
-I \~~~ Or >E /SD 1-0-. / Iv Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ---------------------------------------------------------------------
APPROVED: ___ ~~~ ____ ~ ___ ~ _________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: B.L. Brown Construction & Excavation Other Party: Vectren Case No.: 5159 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, July OS, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee recommends the ! lowing penal~ , ::±:TIl--< () J "j 9 r .'10 ~ D m-. I f., ~a.dl
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ____ ~ ______ ~~~_~_-~~~ ___________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Other Party: Lykins Contracting Case No.: 5161 Date of Advisory Meeting: May 20,2014 Date of Damage: Wednesday, July 03,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)
The Adv/_sory Committee recommends the following penalty: v\"('Q) () I '--)
Special instructions if wffning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED:~~~-----~~~---~~-------------------------------------------------------(initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Vectren Lykins Contracting 5163
Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, July 03, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)
The Advisory Committee recommends the following penalty:
~QJC\ \ :J Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: _____ ~~~ _____ ~~~~~ __________________________________________________ _____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lineal Contracting Other Party: Vectren Case No.: 5164 Date of Advisory Meeting: May 20, 2014 Date of Damage: Monday, July 08, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(expire)
The A,dvisory Committee recommends the following penalty:
i;:~;, VC $7,5]) ±rLl I +0 Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: ___ ~~ ______ ~ ___ ~_~~~~ ___________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lunar Construction Other Party: Vectren Case No.: 5180 Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, July 25, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory COR'llI)ittee_ recommends the following penalty:
\M(}flVl~ ~<~
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: --------------------------------------
APPROVED: ____ ~ ____ ~~_O~~~~ ________________________ _
(initialed) Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Lykins Contracting Vectren 5187
Date of Advisory Meeting: May 20, 2014 Date of Damage: Tuesday, July 02, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee r commends the following penalty: U I It;
Contactin 811 SelfRe air
Additional Information: -------------------------------------------------------------------
APPROVED: _____ ~~~ _____ ~~~ _______________________________________________________ ___ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lunar Construction Other Party: Vectren Case No.: 5188 Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, July 25, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following enalty: r -- ' ("\ \ tJ r . j u - <Cu +ro...., n
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: --------------------------------------------------------------------
APPROVED: ____ ~ ___ ~ ___ ~ _______________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case No.:
Bl Brown Construction & Excavation Vectren 5190
Date of Advisory Meeting: May 20,2014 Date of Damage: Tuesday, July 16,2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)
The Advisory Committee recommends the followin penalty: ~Cu\ J ()r - ,- 0-; 1
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------------
APPROVED: _____ ~~~~~_~ ____________________________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Jason Elpers Other Party: Vectren Case No. : 5191 Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, July 17,2013
The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)
The Advisory Committee recommends the following penalty:
\J CVYlliJ d6r Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ---Lili...:.....l.:.;+l ~Lc.::....;....v __ Ov----:;....b ...... ~iru,u..:: I::Q;- ::l..YCI:.....=.,,~~~. ____ _
APPROVED: __ ~~~_~~(_-_--____________________ ____ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Central Fence Other Party: Vectren Case No.: 5197 Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, July 24, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory com~ittee recommends the following penalty: l) cur y) \ ~ s\\\)i
Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: OJ i I Lcr CubS-k&i'll2> .
APPROVED: _____ ~~/t~~ _____ ~ ____________________________________________________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Bynum Fanyo Utility Vectren
Case No.: 5219 Date of Advisory Meeting: May 20, 2014 Date of Damage: Tuesday, July 30, 2013
The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)
The Advisory Committee reCYifendS the following penalty: \ \ n.« f\ \~ \c .
Special ilJ..str.uctions-i[-.wa1:niJJg letter:~ White Lining Potholing Contacting 811 ~e earance Zone (Two-Foot Rul~
'--- ----------Damaging Lines Self Repair
Additional Information: ----------------------------------------------------------------
APPROVED: __ ~~ ___ ~ __ ~ ____________________ _ (initialed) Ben Warren
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Tecton Construction Other Party: Vectren Case No.: 5646 Date of Advisory Meeting: May 20, 2014 Date of Damage: Monday, June 10, 2013
The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)
The Advisory Committee recommends the following penalty:\ _ -r-leuY\; ') or S 15D .[0--, I FV
Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair
Additional Information: ------------------------------------
APPROVED: __ ~~ ___ ~?uL ___ ~ ___ ~~~~ ___________________________ _ (initialed) Ben Warren
Chairman