![Page 1: I-64/I-264 Ramp Improvements and I-264/Witchduck Road ......I-264/Witchduck Road Interchange & Ramp Extension 1 . I-64/I-264 Ramp Improvements and ... Powerpoint Template, VDOT Template,](https://reader034.vdocuments.us/reader034/viewer/2022050106/5f448dab56446e722a1110e7/html5/thumbnails/1.jpg)
I-64/I-264 Ramp Improvements and I-264/Witchduck Road Interchange & Ramp Extension
1
![Page 2: I-64/I-264 Ramp Improvements and I-264/Witchduck Road ......I-264/Witchduck Road Interchange & Ramp Extension 1 . I-64/I-264 Ramp Improvements and ... Powerpoint Template, VDOT Template,](https://reader034.vdocuments.us/reader034/viewer/2022050106/5f448dab56446e722a1110e7/html5/thumbnails/2.jpg)
I-64/I-264 Ramp Improvements and I-264/Witchduck Road Interchange & Ramp Extension
Project Features
• Widen WB I-64 to EB I-264 exit ramp
• New flyover ramp from WB I-64 to EB I-264
• New two-lane EB I-264 C-D Road
• Widen EB I-264
• Newtown Road Interchange
• Witchduck Road Interchange
2
![Page 3: I-64/I-264 Ramp Improvements and I-264/Witchduck Road ......I-264/Witchduck Road Interchange & Ramp Extension 1 . I-64/I-264 Ramp Improvements and ... Powerpoint Template, VDOT Template,](https://reader034.vdocuments.us/reader034/viewer/2022050106/5f448dab56446e722a1110e7/html5/thumbnails/3.jpg)
I-64/I-264 Ramp Improvements and I-264/Witchduck Road Interchange & Ramp Extension
Two Construction Advertisements
• I-264/Witchduck – January 2017 • Maintains original schedule
• I-64/I-264 – Spring 2016
• Accelerated schedule • RW acquisition • Utility relocations
3
![Page 4: I-64/I-264 Ramp Improvements and I-264/Witchduck Road ......I-264/Witchduck Road Interchange & Ramp Extension 1 . I-64/I-264 Ramp Improvements and ... Powerpoint Template, VDOT Template,](https://reader034.vdocuments.us/reader034/viewer/2022050106/5f448dab56446e722a1110e7/html5/thumbnails/4.jpg)
I-64/I-264 Ramp Improvements and I-264/Witchduck Road Interchange & Ramp Extension
Next Steps
• HRTAC to execute the Interim Project Agreements
(PE & RW)
• Properly document PE & RW funding in the SYIP
• Begin Total Take RW acquisition process
• Begin Partial Take RW acquisition process
• HRTAC to execute the Standard Project Agreements
(CN) 4