8/18/2019 HSE External Report suai airport - December 2014
1/24
December2014
PT. Waskita Karya (Persero) Tbk
Upgrading of Existing Suai Airport Project
December 2014
Health & Safety Monthly Report
-
8/18/2019 HSE External Report suai airport - December 2014
2/24
Health & Safety Monthly Report December 2014
1
VALIDATION SHEET
Health & SafetyREPORT
UPGRADING OF EXISTING SUAI AIRPORT PROJECT
PERIOD : DECEMBER 2014 (Nov 24 – Dec 15)22 Wor ing Days
Verify by,
Contractor
PT. Waskita Karya (Persero) Tbk
Ir. Sugiharto
Project Manager
Prepared by,
Contractor
PT. Waskita Karya (Persero) Tbk
Dannys S.W
HSE Officer
Reviewed by, Approved by
Consultan Supervisor Minister of Transportation & Communication
Ir. Dahlim Mungkil Mr. Pedro Lay de Silva
Project Manager Client
-
8/18/2019 HSE External Report suai airport - December 2014
3/24
Health & Safety Monthly Report December 2014
2
Table of Contents
I. Waskita Policy..................................................................................................................... 3
II. Executive summary............................................................................................................. 4
III. General............................................................................................................................... 4
IV. Project HSE Plan................................................................................................................. 4
V. Organization Chart............................................................................................................. 5
VI. Health Performance
a. Complaining of Disease.......................................................................................... 5
b. Occupational disease.............................................................................................. 5
c. Referral case..........................................................................................................
5
VII. Safety Performance
a. Manpower.............................................................................................................. 6
b. Man Hours.............................................................................................................. 7
c. ncident Record........................................................................................................ 8
d. Hazard Report......................................................................................................... 9
e. Inspection............................................................................................................... 10
f. Traffic safety, sign and control............................................................................... 11
g. Temporary drainage ..............................................................................................
12
h. Flight Intensity Report............................................................................................ 13
i. HSE Meeting........................................................................................................... 15
VIII. Conclusion.......................................................................................................... 17
IX. Documentation.................................................................................................. 19
-
8/18/2019 HSE External Report suai airport - December 2014
4/24
Health & Safety Monthly Report December 2014
3
I. Waskita Policy
Waskita PolicyPT Waskita Karya (Persero) Tbk as the Agency for Construction Services always
control the risk to Safety - Occupational Health, Environment, Quality and
Security Management System by implementing Waskita to the satisfaction of
stakeholders.
As part of this commitment, management always:
1. Comply with laws and regulations and other applicable requirements.
2. Improving performance on an ongoing basis.
3. Prevent injury, occupational illness, environmental pollution and the
occurrence of security incidents that affect the company's business
processes.
4. Providing training, providing a healthy and working facilities, safe and
convenient to all stakeholders.
Jakarta, October 24, 2013
President Director,
Ir. M. Choliq, M.M.
-
8/18/2019 HSE External Report suai airport - December 2014
5/24
Health & Safety Monthly Report December 2014
4
II. Executive Summary
This report records the Health and Safety activities of Waskita Karya (Persero) Tbk. Especially
Unpgrading of Existing Suai Airport Project for the months of December 2014.
III.General
In carrying out a job, health and safety issues are important factors that should be the
primary concern of all parties. Our success in executing the work not only measured from
the completion of the job. Many things can be used as a parameter assessment of the
success of a job. The work was considered successful if the health and safety of all existing
resources is assured, can be completed on time or even earlier than the time specified,
provide benefits to the company, to give satisfaction to all parties (management, employees
and employers).
Health and safety issues are very important, since the establishment of health and safety
at work means can reduce operating costs. If in performing the work of an accident, it will
increase the cost of expenditure, which finally reduces the profits of the company. In the
case of a severe accident, the losses are not only related to financial aspects (funding), but it
can cause defects in the worker or even death.
Construction work contains a lot of potential to pose a risk of occupational accidents,
occupational diseases, environmental pollution, and the discrepancy in the quality of work.
And not least in the Upgrading of Existing Project Suai Airport.
IV. Project HSE Plan
Current Revision : Rev2/ July 2014
Status : Approved by Engineer (JPZ)
Comments : -
Suggested changes and : -
Enhancement
-
8/18/2019 HSE External Report suai airport - December 2014
6/24
Health & Safety Monthly Report December 2014
5
V. HSE Organization Chart
VI. Health Performance
a. Complaining of Disease
Increased rainfall in the December can increase the risk of the disease.
complaining of pain that will increase still around influenza, cought and
fatigue. medications has been available on site.
b. Occupational Disease
There is no Occupational diseases during PT. Waskita Karya (Persero) Tbk.
carrying out construction and campaigns on the prevention and control will
continue to be gradual when the health and safety talk.
c. Referral Case
There is no referral case on December 2014
-
8/18/2019 HSE External Report suai airport - December 2014
7/24
Health & Safety Monthly Report December 2014
6
VII. Safety Performancea. Man power
Total Waskita Karya (Persero) Tbk. There is no increased from the
previous period as many as 26 people. PT. WTJ (Subcontractor) with rentalequipment, additional manpower has increase 4 personell for this month.
Especially in the foreman as a whole will continue to increase with the
progress of the work. Total employees working in Waskita Suai Airport
Project site as many as 144 people overall.
Table VII.1
Table of Manpower On Suai Airport Project
Description August-14 Sep-15 Okt-15 Nov-15 Dec-15
PT Waskita Karya 24 25 25 26 26
Daily personel
Ass.survey 4 4 4 4 4
Airport 6 6 6 6 6
Basecamp 7 10 12 12 19
Security 9 9 9 9 9
Equipment 2 3 4 5 7
Total 52 54 56 62 72
PT WTJ 15 16 16 21 25
PT. Tugu Beton 3 3Total 67 70 72 86 99
Table VII.2
Table of additional manpower / workmanship on December 2014
Workmanship Personel
Main drain Right 7
Main drain Left 15
Cutting trees 4
Steel Fabrication/ Quarter 8
RCP AFRS 8
Basecamp facilities 18
Total 45
-
8/18/2019 HSE External Report suai airport - December 2014
8/24
Health & Safety Monthly Report December 2014
7
Picture VII.1
Total Man power on Suai Airport Project
b. Man Hours
The number of manhours until December 15th 2014 amounted to
24.290 hours of work and working hours Increase compared to the previous
period. due to along with increasing intensity of work on site and there is no
time lost working hours due to an accident on this month, total cumulativehours of work until now of 104.954 hours and no Loss Time Injury and
fatality (Start from May 1st). but there were incidents were not caused from
the job (riot), which cause the victim does not want to work anymore
Picture VII.2
Total of Man Hours (Nov 24 – Dec 15)
-
8/18/2019 HSE External Report suai airport - December 2014
9/24
Health & Safety Monthly Report December 2014
8
c. Incident report
There is 1 incidents on this month. No victim. This Project is still
ZERO ACCIDENT fatality.
Table VII.3
Accident Report
Table VII.4
* Landslide Chronology (Basecamp) 11/12/2014 - Attachment
-
8/18/2019 HSE External Report suai airport - December 2014
10/24
Health & Safety Monthly Report December 2014
9
Occupational Health and Safety Performance
* Incident rate becomes large because the number of working hours in use only 8 months
d. Hazard report
Based on the report hazards recorded in HSE unit on December period,
there is no hazards findings occurred in the area of basecamp . From the last
month finding of hazard, the corrective actions taken are still in progress and
late. because majority of worker are focus to erection batching plant and
AMP. For inspection results classified into 2 types of hazards, unsafe action
and unsafe condition. From the results of the inspection period December
( Nov 24 - Dec 15) resulted in findings.
-
8/18/2019 HSE External Report suai airport - December 2014
11/24
Health & Safety Monthly Report December 2014
10
Picture VII.3
Hazard report
e. Inspection
Inspection activities in December 2014 carried out at the airport and
the basecamp area. Every inspection finding will be record on CAR document
(Corrective & Preventive Action Request) and will be signed & follow up bythe person in charge of the area.
Table VII.5
Inspection Summary
-
8/18/2019 HSE External Report suai airport - December 2014
12/24
Health & Safety Monthly Report December 2014
11
f. Traffic safety, sign and Control (Update December)
Picture VII.6
Sign Placement and traffic Map
Note :
Main Drain Excavation
Work access road
Detour Road / Temporary acces for public
Speed limit Sign
Watch rof moving vehicle Sign
Heavy Equipment Sign
PPE Sign
Constuction Area Sign
Assembly point
Aircraft sign
Detour road
River diversion
-
8/18/2019 HSE External Report suai airport - December 2014
13/24
Health & Safety Monthly Report December 2014
12
Picture VII.7 Picture VII.8
Aircraft sign Temporary public acces road
g. Temporary Drainage
Picture VII.9
Drainage work & Temporary Drain
Note :
Main Drain Excavation Mitigation Pond
Temporary Drainage
To Holbelis
To Matai
-
8/18/2019 HSE External Report suai airport - December 2014
14/24
Health & Safety Monthly Report December 2014
13
h. Flight Report
Picture VII.10
Suai Airport Flight Report.
Flight report started in September, and in December there is 1 flight
in Suai. No flight incidents related to existing work in the field. Take off and
Landing went smoothly without distubed the work. To avoid the accident in
the airside area, will be applied siren system if there is about flight to Suai
Airport. So before the aircraft will be landing, the run way area will clearance
from all activity and equipment.
Picture VII.11 Picture VII.12
Take off Landing
-
8/18/2019 HSE External Report suai airport - December 2014
15/24
Health & Safety Monthly Report December 2014
14
1. Clearance Area along the "Runway", which counted 60 meters from thecenter line of the width of "Runway". This area should be completely free
from all outside activities on the flight activity of the airport operating hours.
2. If there is a plane that will land, the contractor must ensure the runway is
free of any obstacles (clearance area), at least 700 meters.
Picture VII.13
Existing runway
Existing runway lenght remaining 829m due to demolished work, so
clearance area are still on safe distance for emergency landing and take off .
Clearance area for
emergency landing and Take
off minimum 700 meters
-
8/18/2019 HSE External Report suai airport - December 2014
16/24
Health & Safety Monthly Report December 2014
15
i. HSE meeting
HSE meeting is an activity to remind workers of the importance of
safety in the workplace, hazards in the workplace, the incidents that occurred
in the workplace and safety related issues. In this case we usually call safety
morning. HSE meeting attended by all personnel in the project, and also
subcon foreman. in the November has been done 2 times a safety morning.
- December 5, 2014
Minutes of HSE Meeting
Picture VII.14
Safety morning December 5, 2014
-
8/18/2019 HSE External Report suai airport - December 2014
17/24
Health & Safety Monthly Report December 2014
16
- December 12, 2014
Minutes of HSE Meeting
Picture VII.15
Safety morning December 12, 2014
-
8/18/2019 HSE External Report suai airport - December 2014
18/24
Health & Safety Monthly Report December 2014
17
VIII. Conclusion
Some things that become problems to activity and work in the HSE in
the period December 2014 can be seen in Table IX.1
Table IX.1
This month issues
Pr blem C rrective Acti n PIC
1
There has been a landslide on
the retaining embankment
building access roads to thehopper.
The access road will be
repaired, and its design will a
little away from the Electrical
transmission tower. And willbe installed gabion Minimum
2 layers.
PRODUCTION
SUPERVISOR
2
Increased rainfall can boost the
risk of flooding in the area
basecamp
Prepare for flood emergency
response plan HSE
-
8/18/2019 HSE External Report suai airport - December 2014
19/24
Health & Safety Monthly Report December 2014
18
Table IX.2
Last Month issues
Pr blem C rrective Acti n PIC Status
1
Security around the project
site have not been fully
able to ensure smoothness
work (Airport &
Basecamp)
Coordination with police
station, and hiring security
guard
Project
Manager Closed
2
Construction of temporary
storage facility forhazardous material at all
site has not available
(Basecamp)
Provide secure storage
facility for hazardous
material provided with
proper containment
Construction
Manager, HSE Process
-
8/18/2019 HSE External Report suai airport - December 2014
20/24
Health & Safety Monthly Report December 2014
19
IX.Documentation
Picture X.1
PPE Demonstration
Picture X.2
Practice for using Fire Extenguisher
-
8/18/2019 HSE External Report suai airport - December 2014
21/24
Health & Safety Monthly Report December 2014
20
Attachment
Landslide Chronology (Basecamp) - 11/12/2014
-
8/18/2019 HSE External Report suai airport - December 2014
22/24
Health & Safety Monthly Report December 2014
21
LANDSLIDE INCIDENT
Chronology :
On Thursday afternoon at 14:00 happen very heavy rain in the area basecamp. Because of
heavy rain, the production process is stopped and workers in the field stopped. After 1 hour
the rain, suddenly, gabion retaining not strong enough to hold the load increase due to
rainwater and finally collapse on the side of the house generators. Landslides are not get to
generator house, no work activity at the site, and none of the victims.
Picture 1. Land slide condition
Land slide area
-
8/18/2019 HSE External Report suai airport - December 2014
23/24
Health & Safety Monthly Report December 2014
22
Picture 2. Access road condition
Conclusion :
A. At the time of manufacture of is not done with vibro compaction, only by using the
excavator, so it is not in getting the maximum density to hold the load.
B. Gabion retaining the height > 5m only installed one layer and a width of 1 m, so that
the strength is not maximum.
C. In the event of heavy rain, the water that is in the top pile into the soil compacting
gravel are less than the maximum. Thereby increasing the pressure on the gabion.
And finally gabion not able to hold the pressure.
Corrective Action :
A. The access road will be repaired, and its design will a little away from the Electrical
transmission tower.
B. At the end of the access road will be installed gabion Minimum 2 layers.
C. Most of the embankment will be made the slope, so that the water in the top can
sliding down.
Landslide area
Access road to
Hopper
-
8/18/2019 HSE External Report suai airport - December 2014
24/24
Health & Safety Monthly Report December 2014
Picture 3. Repair Construction Plan.
There were no victims in the incident, and there was no damage to property, it's just we lost
production process for 7 days for a period of repair.