Current and potential cloud seeding in the Humboldt River Basin
Mark Green, John Mejia and David MitchellDesert Research Institute
![Page 2: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/2.jpg)
WY2013 Ruby Mountains Project Area
![Page 3: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/3.jpg)
![Page 4: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/4.jpg)
WY2013 Tahoe-Truckee Project Area
![Page 5: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/5.jpg)
WY2013 Walker Basin Project Area
![Page 6: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/6.jpg)
Figure 3. Map showing several of the mountainous areas (blue shading) considered in the DRI cloud seeding feasibility study for eastern Nevada. The prototype project is planned for the northern portion of the Schell Creek Range in the center of the map. Possible seeding sites tested with a plume dispersion model are indicated by blue pins and green flags. SNOTEL or snow course sites are shown by red Xs. Red and yellow shaded areas represent specific creek drainages and purple triangles show stream gauge locations.
Eastern Nevada Project Area (seeding starting in WY2014)
![Page 7: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/7.jpg)
Number of generators
Total cost
7 $265K
6 $242K
5 $219K
4 $197K
3 $174K
Start with SNWA WY2013 funding of $252KApply 5% increase for inflation= $265KFor 7 generators, about $38K per generator for full networkAssume reduced network size saves 60% of average per cost when reducing network size.
FY 2014 Cost estimate for continuing Ruby Mountains seeding operations
Costs of starting any programs in new areas high first year due to site establishment costs
![Page 8: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/8.jpg)
Map of SNOTEL sites gives good indication of potential seeding areas
![Page 9: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/9.jpg)
Granite Peak Snotel site at 8543’ in Santa Rosa Mtns
Spring 2011 had over 100” snow depth
![Page 10: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/10.jpg)
Bear Creek SNOTEL site 8040’ in the Jarbidge Range
![Page 11: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/11.jpg)
Jack’s Peak SNOTEL site -8420’ near the headwaters of the North Fork Humboldt River, Independence Mountains
Spring 2011 had over 100” snow depth
![Page 12: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/12.jpg)
In the past DRI operated cloud seeding generators targeting the Independence Mountains north of Elko and nearby areas
![Page 13: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/13.jpg)
Big Creek Sum SNOTEL site at 8695’ in the Toiyabe Range, headwaters of the Reese River, a tributary of the Humboldt River
![Page 14: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/14.jpg)
Seeding has been done by DRI in the Toiyabe Range
![Page 15: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/15.jpg)
Use of the Weather Research and Forecasting Model (WRF)In Cloud Seeding Research and Operations:
Our overall motivation is to use the model to betterunderstand/track the evolution of cloud seeding aerosol in timeand space. Current uses of WRF include:
1) Selection of cloud seeding generator sites in planning future Programs
2) Decision making support for when to conduct cloud seeding
![Page 16: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/16.jpg)
![Page 17: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/17.jpg)
3-day forecast of some criteria used to decide whether to commence cloud seeding, using the WRF Model at DRI.
![Page 18: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/18.jpg)
This morning’s Radar image and wind profile from NWS Elko- let’s us know if precipitation is occurring and if winds are in the right direction
![Page 19: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/19.jpg)
Mesowest display of temperature, precipitation, winds and Radar for the Ruby Mountains area
![Page 20: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/20.jpg)
Figure 3. Map showing several of the mountainous areas (blue shading) considered in the DRI cloud seeding feasibility study for eastern Nevada. The prototype project is planned for the northern portion of the Schell Creek Range in the center of the map. Possible seeding sites tested with a plume dispersion model are indicated by blue pins and green flags. SNOTEL or snow course sites are shown by red Xs. Red and yellow shaded areas represent specific creek drainages and purple triangles show stream gauge locations.
Testing of Generator Sites in Eastern Nevada Project Area
![Page 21: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/21.jpg)
![Page 22: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/22.jpg)
![Page 23: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/23.jpg)
![Page 24: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/24.jpg)
![Page 25: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/25.jpg)
![Page 26: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/26.jpg)
![Page 27: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/27.jpg)
![Page 28: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/28.jpg)
![Page 29: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/29.jpg)
![Page 30: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/30.jpg)
![Page 31: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/31.jpg)
![Page 32: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/32.jpg)
![Page 33: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/33.jpg)
![Page 34: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/34.jpg)
![Page 35: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/35.jpg)
![Page 36: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/36.jpg)
![Page 37: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/37.jpg)
![Page 38: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/38.jpg)
![Page 39: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/39.jpg)
![Page 40: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/40.jpg)
![Page 41: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/41.jpg)
![Page 42: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/42.jpg)
![Page 43: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/43.jpg)
![Page 44: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/44.jpg)
![Page 45: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/45.jpg)
![Page 46: Hrbwa dmmgjm 22_oct2012](https://reader035.vdocuments.us/reader035/viewer/2022062706/557cb52bd8b42a1b0c8b4859/html5/thumbnails/46.jpg)
Summary
1. WRF provides advance knowledge of when favorable cloud seeding conditions are likely to develop.
2. WRF combined with a plume dispersion model greatly improvesour ability to locate cloud seeding generators in areas that willoptimize snowfall amounts in targeted areas.
3. Location of generator sites also depends on accessibility and authorization of land owner or responsible agency.