Houston Airport Marriott
July 2013
![Page 2: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/2.jpg)
Introduction to Host
• S&P 500 and Fortune 500 company
• Largest lodging REIT, $18 billion total market value
• Portfolio of irreplaceable assets in premier markets:
– Consolidated Portfolio + Joint Ventures: 145 hotels
4 hotels in Houston – Houston Airport Marriott, JW Houston Galleria, Houston Marriott Texas Medical Center and The St. Regis Houston
11 airport hotels
• Hotels managed by best operators under strongest brand names
2
![Page 3: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/3.jpg)
Host Credentials
• Manage over $500 million annual capital investment plan (over $3.1 billion since 2007)
• Technical specialists in design, architecture, engineering, procurement, project management, estimating and sustainability
• Strategic relationships + scale ensure favorable pricing and quality workmanship from vendors, suppliers, consultants and contractors
3
![Page 4: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/4.jpg)
Lobby / Great Room Elements
• State-of-the-art, high-energy lobby to elevate the customer experience
• 3-meal-a-day dining / lobby bar concept
• Expansive lobby seating area
• New guest reception experience
• Relocate and upgrade fitness facility
4
![Page 5: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/5.jpg)
Conceptual Lobby Layout
5
BEFORE
![Page 6: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/6.jpg)
Conceptual Lobby Layout
6
BAR
PANTRY
BUFFET BAR LOUNGE
RESTAURANT
DINING
SERV.
LOBBY LOUNGE
ADDITIONAL
SEATING
ADDITIONAL
SEATING REGISTRATION AFTER
![Page 7: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/7.jpg)
Reception Desk
7
![Page 8: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/8.jpg)
Lobby Lounge - Feature Wall
8
![Page 9: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/9.jpg)
Bar Concept
9
![Page 10: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/10.jpg)
Design Inspiration
10
![Page 11: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/11.jpg)
Restaurant Concept
11
![Page 12: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/12.jpg)
Feature Wall
12
![Page 13: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/13.jpg)
Public Area & Grand Stair Concept
13
![Page 14: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/14.jpg)
Tram Level Concept
14
Existing Tram Level
Tram Level Design Concept
![Page 15: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/15.jpg)
Guestroom
15
Before: Existing typical king guestroom
After: Typical king guestroom (Chicago Marriott O’Hare)
![Page 16: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/16.jpg)
Comparable Renovations
16
Chicago Marriott O’Hare Lobby / Great Room
![Page 17: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/17.jpg)
Recent Renovations
17
Chicago Marriott Suites O’Hare
![Page 18: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/18.jpg)
Recent Renovations
18
Washington Dulles Airport Marriott
Great Room
![Page 19: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/19.jpg)
Business Terms
• 40-year lease
• $40.5 million capital investment
– $6.0 million within first year – $34.5 million within 42 months
• Rent = 10% of gross revenue
– Minimum annual rent is $1,560,000
• No additional hotels in the terminal complex within 10 years from the effective date
19
![Page 20: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/20.jpg)
Community Impact
• 175-200 jobs created during renovation
– Industry day – MWBE construction goal (and ACDBE concession goal)
• LEED concepts and comprehensive sustainability program
– Recycling construction and packaging waste – Installation of energy and water saving devices – Use of recycled products
• Donate beds, furniture and other materials to local
charities
20
![Page 21: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/21.jpg)
Renovation Plan
21
• Anticipated Construction Schedule
Building Exterior / Grounds 3Q 2014
Building Systems 3Q 2014
Rooms 4Q 2014
Lobby / Great Room 1Q 2015
Elevators and Escalators 1Q 2015
Ballrooms and Meeting Rooms 2Q 2016
![Page 22: Houston Airport Marriott · 7/30/2013 · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby](https://reader033.vdocuments.us/reader033/viewer/2022050606/5fad7c219c2a61467705e3c8/html5/thumbnails/22.jpg)
Questions?