HORSESHOE DESIGN-BUILD PROJECT
1
Pre-QS Workshop
Kelly Selman, P.E. TxDOT, Dallas Deputy District Engineer
January, 9, 2012
![Page 2: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/2.jpg)
HORSESHOE DESIGN-BUILD PROJECT
2
Project Location
DALLAS
Located at the junction of I-30 and I-35E In the downtown Dallas business district
DALLAS
![Page 3: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/3.jpg)
HORSESHOE DESIGN-BUILD PROJECT
3
Houston Street Viaduct’s Location in Mixmaster Interchange
Jefferson Street Viaduct
Houston Street Viaduct
IH 35E N
![Page 4: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/4.jpg)
HORSESHOE DESIGN-BUILD PROJECT
4
Purpose and Need Ranked the 7th most congested roadway in Texas in 2011 Week day traffic volume exceeds 460,000 vehicles Outdated roadway geometry Bridge Deterioration Increasing maintenance costs
![Page 5: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/5.jpg)
HORSESHOE DESIGN-BUILD PROJECT
5
40
60
55
50
45
65
2002 2004 2006 2008 2010
70
Brid
ge
Suff
icie
ncy
Rat
ings
Inspection Years
Purpose and Need
I-35E NB
I-35E SB I-30 WB
I-30 EB
![Page 6: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/6.jpg)
HORSESHOE DESIGN-BUILD PROJECT
6
Duane Milligan, P.E. Horseshoe Project Engineer
TxDOT Dallas District
Horseshoe Project Management
![Page 7: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/7.jpg)
HORSESHOE DESIGN-BUILD PROJECT
7
Proposed Project
![Page 8: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/8.jpg)
HORSESHOE DESIGN-BUILD PROJECT
8
I-35E - Lower Stemmons
I-30 & I-35E Bridges over Trinity & Mix Master
I-30 - Canyon
Proposed Project
![Page 9: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/9.jpg)
HORSESHOE DESIGN-BUILD PROJECT
9
Margaret McDermott
Bridge
Proposed Project
● Upgrade roadway geometry ● Replace I-30 and I-35E bridges over Trinity River ● Construct additional lanes ● Construct Margaret McDermott Bridge
![Page 10: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/10.jpg)
HORSESHOE DESIGN-BUILD PROJECT
10
Approved Funding
Construction Margaret McDermott Bridge
SUB-TOTAL
Design, Testing & Construction Mgmt.
R.O.W. & Utilities
SUB-TOTAL
TOTAL
Cost Estimate Dedicated Funding Sources Federal Allocation Prop-12 Major Bridges SH 121 RTR Remainder Prop-12 V1 (MO 112473) Remainder Prop-14 (MO 111680) Dallas District’s Prop-12 V2
NCTCOG Prop-12 V2
$620 $80
$700
$56
$756
$62
$818
$181.4 $400.5 $72 $10
$13.3
$818 TOTAL
$53.7
$87.1
![Page 11: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/11.jpg)
HORSESHOE DESIGN-BUILD PROJECT
11
Work Complete / Underway
● I-30: 30% design complete
● I-35E: 30% design underway
● Margaret McDermott bridge: 50% design complete
● Commission approved funding
● Commission approved “Design-Build”
![Page 12: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/12.jpg)
HORSESHOE DESIGN-BUILD PROJECT
12
Next Steps
● USACE 408 Permit – Fall 2012
● Environmental Clearance – December 2012
● Issue RFP – July 2012
● Entire Project: 30% design – April 2012
● Draft RFP – March / April 2012
● Margaret McDermott bridge: 90% design – June April 2012
![Page 13: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/13.jpg)
HORSESHOE DESIGN-BUILD PROJECT
13
● Selected Procurement Team ● Issued RFQ
Late 2011
Next Steps: Preliminary Timeline
Feb. 2012 Receive Qualifications
Complete
July 2012 Issue Final RFP
Late Summer 2012 Receive Final Proposal
Late 2016 / Early 2017 Construction Complete
Apr. 2012 Short-List Proposers Issue Draft RFP
May/June 2012 One-on-One Meetings
Fall 2012 Conditional Contract Award
Dec. 2012 Environmental Clearance
Early 2013 Start Construction
Jan. 2013 Contract Execution
![Page 14: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/14.jpg)
HORSESHOE DESIGN-BUILD PROJECT
14
Margaret McDermott Bridges
● Margaret McDermott Bridges on the I-30 EB and WB frontage roads
● Designed and engineered to 100% by Santiago Calatrava LLC
● Under contract with the City of Dallas
● Built by the Design-Build Contractor
![Page 15: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/15.jpg)
HORSESHOE DESIGN-BUILD PROJECT
15
Charlie Quade, P.E. Huitt – Zollars Inc.
Margaret McDermott Bridge Design
![Page 16: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/16.jpg)
HORSESHOE DESIGN-BUILD PROJECT
16
I-30 Frontage Road Bridges
![Page 17: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/17.jpg)
HORSESHOE DESIGN-BUILD PROJECT
17
This presentation provides a summary of the “Signature” aspect of the bridge and includes reference projects to indicate the level of workmanship and quality required for the Frontage Road Bridges
I-30 Frontage Road Bridges
![Page 18: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/18.jpg)
HORSESHOE DESIGN-BUILD PROJECT
18
Santiago Calatrava, LLC Company Profile • Established 1981
• Principal Santiago Calatrava, Architect and Engineer
• Offices: Zurich, New York, Valencia
• 100 employees worldwide
• Worldwide experience in many forms of construction
• Excellence in bridge design
• Proven experience in delivering large scale projects
• Specific experience in Dallas
I-30 Frontage Road Bridges
![Page 19: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/19.jpg)
HORSESHOE DESIGN-BUILD PROJECT
19
I-30 Frontage Road Bridges
![Page 20: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/20.jpg)
HORSESHOE DESIGN-BUILD PROJECT
20
I-30 Frontage Road Bridges
![Page 21: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/21.jpg)
HORSESHOE DESIGN-BUILD PROJECT
21
Bridge Elevation
I-30 Frontage Road Bridges
![Page 22: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/22.jpg)
HORSESHOE DESIGN-BUILD PROJECT
22
I-30 Frontage Road Bridges
![Page 23: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/23.jpg)
HORSESHOE DESIGN-BUILD PROJECT
23
At Cable Anchorage Between Cables
I-30 Frontage Road Bridges
![Page 24: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/24.jpg)
HORSESHOE DESIGN-BUILD PROJECT
24
Possible Arch Construction
I-30 Frontage Road Bridges
![Page 25: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/25.jpg)
HORSESHOE DESIGN-BUILD PROJECT
25
QUALITY - Welding
I-30 Frontage Road Bridges
![Page 26: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/26.jpg)
HORSESHOE DESIGN-BUILD PROJECT
26
QUALITY - Steelwork Finishing
I-30 Frontage Road Bridges
![Page 27: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/27.jpg)
HORSESHOE DESIGN-BUILD PROJECT
27
QUALITY - Concrete Works
I-30 Frontage Road Bridges
![Page 28: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/28.jpg)
HORSESHOE DESIGN-BUILD PROJECT
28
Reggio Emilia - Italy
Reference Projects
![Page 29: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/29.jpg)
HORSESHOE DESIGN-BUILD PROJECT
29
Reggio Emilia - Italy
Reference Projects
![Page 30: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/30.jpg)
HORSESHOE DESIGN-BUILD PROJECT
30
Light Rail Train Bridge - Jerusalem
Reference Projects
![Page 31: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/31.jpg)
HORSESHOE DESIGN-BUILD PROJECT
31
Light Rail Train Bridge - Jerusalem
Reference Projects
![Page 32: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/32.jpg)
HORSESHOE DESIGN-BUILD PROJECT
32
Margaret Hunt Hill Bridge - Dallas
Reference Projects
![Page 33: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/33.jpg)
HORSESHOE DESIGN-BUILD PROJECT
33
Margaret Hunt Hill Bridge - Dallas
Reference Projects
![Page 34: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/34.jpg)
HORSESHOE DESIGN-BUILD PROJECT
34
Samuel Beckett Bridge - Dublin
Reference Projects
![Page 35: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/35.jpg)
HORSESHOE DESIGN-BUILD PROJECT
35
Samuel Beckett Bridge - Dublin
Reference Projects
![Page 36: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/36.jpg)
HORSESHOE DESIGN-BUILD PROJECT
36
Bridges over the Hoofdvaart – The Netherlands
Reference Projects
![Page 37: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/37.jpg)
HORSESHOE DESIGN-BUILD PROJECT
37
Bridges over the Hoofdvaart – The Netherlands
Reference Projects
![Page 38: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/38.jpg)
HORSESHOE DESIGN-BUILD PROJECT
38
Ceason Clemens, P.E. Horseshoe Deputy Project Engineer
TxDOT Dallas District
Horseshoe Project Management
![Page 39: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/39.jpg)
HORSESHOE DESIGN-BUILD PROJECT
39
Project Challenges
● Crossing of Trinity River Levees ● Accommodating future Trinity Lakes Project
● Reconstruction of 2 major freeway interchanges
● Construction of Margaret McDermott bridge
● Maintaining traffic under construction
![Page 40: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/40.jpg)
HORSESHOE DESIGN-BUILD PROJECT
40
QS Evaluation
● Statement of Technical Approach (35%)
● Project Qualifications and Experience (65%)
![Page 41: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/41.jpg)
HORSESHOE DESIGN-BUILD PROJECT
41
QS Evaluation Project Qualifications and Experience (65%)
● Experience with developing, designing and constructing comparable projects (20 points)
● Experience of the management team and Key Personnel for the project (16 points)
● Success of the Proposer and individual team members, management team and key personnel in working together on comparable projects and responsibilities (8 points)
● Stability, strength and likelihood of success of the proposed management structure and team (8 points)
● Experience with performing capital maintenance on comparable projects (8 points)
● Responsiveness toward the DBE involvement, objectives and goals (5 points)
![Page 42: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/42.jpg)
HORSESHOE DESIGN-BUILD PROJECT
42
QS Evaluation
● Demonstrate a full understanding of the Project’s scope and complexity (20 points)
Statement of Technical Approach (35%)
● Demonstrate a complete understanding of Project risks and potential solutions that may arise during all Project phases, including design, construction, and capital maintenance (10 points)
● The general approach to public involvement recognizing unique characteristics of this Project and its impacts on the community
(5 points)
![Page 43: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/43.jpg)
HORSESHOE DESIGN-BUILD PROJECT
43
Procurement Schedule
● RFQ Issued December 9, 2011 ● Qualification Statements Due February 22, 2012 ● Short-list Announced March 30, 2012 ● Release Draft Request For Proposals March 30, 2012
● 30% Plans Complete April, 2012 ● 90% Signature Bridge Plans April, 2012
● Industry Review One-on-One Meetings May & June, 2012 ● 100% Signature Bridge Plans June 30, 2012
● Issue Final RFP July, 2012 ● Proposals Due September, 2012 ● Conditional Award October, 2012
● USACE Permit Fall, 2012 ● Environmental Clearance December, 2012
● Contract Execution January 2, 2013
![Page 44: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/44.jpg)
HORSESHOE DESIGN-BUILD PROJECT
44
Delivering QS Submittals
Proposers are responsible for ensuring QS submittals are delivered by hand or courier on Wednesday, February 22, 2012 by 3:00 p.m. to: Attn: Kelly Selman TxDOT, Dallas District 4777 East Highway 80 Mesquite, TX 75150 Any QSs received after the above date and time will be rejected and returned to the sending party unopened.
![Page 45: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/45.jpg)
HORSESHOE DESIGN-BUILD PROJECT
45
Proposers are responsible for monitoring the Project Website for
information concerning this procurement. Proposers are advised that responses to questions posed at this
workshop are considered to be on an informational basis and are not binding on TxDOT. The process for official questions and answers remains as given in the RFQ via e-mail to [email protected].
TxDOT will post responses to those questions of general application
and requests for clarifications which TxDOT deems to be material and not adequately addressed in previously provided documents on the Project Website.
TxDOT will post any addenda to this RFQ on the Project Website.
Responsibilities
![Page 46: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/46.jpg)
HORSESHOE DESIGN-BUILD PROJECT
46
Mr. Kelly Selman, P.E. Deputy District Engineer Texas Department of Transportation 4777 East Hwy 80 Mesquite, TX 75150 Email: [email protected]
Horseshoe Project Manager
![Page 47: Horseshoe PP Presentation](https://reader031.vdocuments.us/reader031/viewer/2022020206/543c6062afaf9fe0338b4815/html5/thumbnails/47.jpg)
HORSESHOE DESIGN-BUILD PROJECT
47
Questions