License number: CCC056897Phone: (386)734-7823Fax: (386)734-1254Fax: (386)734-1254
"WHERE PR IDE AND CRAF TSMANSHIP WORK HAND IN HAND“
S E R V I N G V O L U S I A C O U N T Y F O R O V E R 5 O Y E A R S !S E R V I N G V O L U S I A C O U N T Y F O R O V E R 5 O Y E A R S !
HOMEOWNER EDUCATIONHOMEOWNER EDUCATION
PREPARING FOR YOUR NEW ROOF
1 H O A Color Approval1.H.O.A. Color Approval2.Permitting3. Material Ordering.4. Job Schedulingg
We secure necessary materials withoutrequiring and down payment from ourrequiring and down payment from ourcustomers.
TYPICAL WARRANTY COVERAGES
• Warranty period: Lifetime
• Non-prorated coverage: 10 yearsNon prorated coverage: 10 years
• Wind warranty protection: 130MPH
• Wind warranty protection period: 15 years• Wind warranty protection period: 15 years
• Algae resistance coverage period: 10 years
2nd t f A il bl (f )• 2nd owner transfer: Available (fees vary)
AVAILABLE COLOR OPTIONS
SILVER BIRCH
COBBLESTONE GRAY
GEORGETOWN GRAY
COLONIAL SLATE
PEWTER
CHARCOAL BLACK
MOIRE BLACK
DRIFTWOOD
WEATHERED WOOD
MOJAVE TAN
SUNRISE CEDAR
HEATHER BLEND
RESAWN SHAKE
BURNT SIENNA
COTTAGE RED
ATLANTIC BLUE
HUNTER GREEN
WE HANDLE NECESSARY PAPERWORK AND FEES TO GET YOUR PROJECT STARTED!FEES TO GET YOUR PROJECT STARTED!
• Notice of Commencement • Building Permit Application• Building Permit Application• Schedule Inspections
RE-ROOFING PROCEDURES
1. Tear off
2 Deck inspection and repairs 2. Deck inspection and repairs
3. Dry-in
4 Accessory instillation 4. Accessory instillation
5. Shingle installation
6 Cl 6. Clean up
7. Final paperwork
TEAR OFF PROCEDURES
• Tarps are laid to protect your property from damage.g
• Roof affixed items are removed• Satellite dishes• Solar panels• Disposal of discarded items available
• Old roofing materials are removed
We take care of the removal of Affixed items for reuse.
Disposal of replaced and discarded fixtures is provided.
DECK INSPECTION AND REPAIRS
• Roof deck inspected for damage
• Code requires all damage to be repairedCode requires all damage to be repaired
• All decking is re-nailed to meet current codes.
DRY-IN PROCEDURES
• New drip edge installed around Eaves.
• Aluminum flashing installed in necessary areas.g y
• Self-adhering rubber membrane underlayment in critical areas.• Valleys• Eaves• ProtrusionsProtrusions
• Fiberglass reinforced felt in the field (upgradable to self-adhering)
ACCESSORY INSTILLATION
• Attic ventilation• Baffled shingle-over ridge venta ed s g e o e dge e t• Off-ridge vent
• Lead bootsLead boots
• Exhaust vents• Kitchen, bath, laundry.Kitchen, bath, laundry.
• Valleys
Accessory Instillation
CLEAN-UP
We use a high lift dump truck to keep ground clean and free of debris.
fAs well as sweeping the ground for nails and other debris.
We respect your property and take measures to protect it during your new roof instillation.
FINAL PAPERWORK
• Manufactures shingle warranty
• Clark Roofing workmanship warranty
• Contractors final affidavit
• Final sign off
• Wind-mitigation (if requested prior to start)Wind mitigation (if requested prior to start)
Any questions please feel free to contact us at:
Address: 1034 W. Martin St. Deland, FL 32720
License number: CCC 056897
Phone: (386)734-7823Phone: (386)734 7823
Fax: (386)734-1254
Email: Greatroofer63@yahoo comEmail: [email protected]
Online: www.leonardclarkroofing.com/