Transcript
Page 1: High Flow Sediment Bypass for Robles Diversion Dam Presentation

High Flow Sediment Bypass for Robles Diversion DamBrent Mefford, Blair Greimann, and Yong LaiTechnical Service CenterDenver, ColoradoMay 2008

Page 2: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Aerial Views

Aerial view of Robles Diversion Dam, 2005 Aerial view with AutoCAD model overlay

Page 3: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Crest Elevation: 767 ft• Structural Height: 24 ft• Hydraulic Height: 13 ft• Crest Length: 530 ft• Volume: 11,000 yd3

Background

Page 4: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Sluice Radial Gate Structure– 4 Radial gates (1-10’x9.5’, 3-16’x9.5’)

• Discharge Capacity: 6,000 cfs– Associated features:

» Spillway & Baffle Section

Existing Conditions

• Diversion Canal– 3 Radial gates (11’ x 10.5’)

• Discharge Capacity: 500 cfs

Downstream of Sluice Radial Gate Structure

Sluice Radial Gate Structure (Left)and Diversion Canal (Right)

Page 5: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Existing Conditions• Downstream

– Boulders & Cobbles– Vegetation

Downstream of Sluice Radial Gate Structure (Left)

Upstream

Downstream

Page 6: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Existing Conditions

Sedimentation at Fish Entrance

2005 Flood (less than 10-yr flood)

Page 7: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Existing Conditions

Entrance Conditions at Gates

2005 Flood (less than 10-yr flood)

Page 8: High Flow Sediment Bypass for Robles Diversion Dam Presentation

overtopping and damage to dam

2005 Flood (less than 10-yr flood)

Existing Conditions

Page 9: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Existing Conditions

Debris Loads at Fish Screens

2005 Flood (less than 10-yr flood)

Page 10: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Determine flow capacity and the best location for the spillway structure (left bank or right bank) based on sediment sluicing performance and impacts on upstream fish passage.

• Identify potential modifications to the design that would enhance sediment sluicing, fish passage and minimize the potential for fish stranding.

• Identify spillway operational patterns that promote sediment sluicing fish passage and prevention of fish stranding.

Objectives

Page 11: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Physical Model: – Tested with and without HFSB– Tested Medium flow (6,000 cfs) and higher flow (14,000

cfs)• Numerical Modeling:

– compared against laboratory experiements– Simulated without and without Matilija Dam Removal– Simulated without and without HFSB

• Fish Passage:– Designed and tested single pool with fish ladder

Tasks

Page 12: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Bed load at Robles Diversion will increase after Matilija Dam Removal, potentially entering canal and reducing diversions

• HFSB improves the sediment sluicing and will reduce the bedload entering Robles Canal

• Existing debris loads and suspended sediment loads will remain high

• Existing fishway entrance will need to be raised due to sedimentation

• Additional fish ladder will minimize fish stranding at HFSB

• Raise of dam crest provides greater operational flexibility for diversion and fish ladder

Summary of Results

Page 13: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Final Design Recommendations

Page 14: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Design Recommendations

Page 15: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Downstream of Diversion

Existing spillway

HFSB

Page 16: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Downstream of Diversion

Fishwayexit

Page 17: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Downstream of Diversion

HFSB Spillway

Fishwayentrance

Page 18: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Test Conditions– Existing Conditions

• Assuming Matilija Dam Removed– Sluice Radial Gate Structure– Diversion Canal Structure

– Proposed Conditions• High Flow Sediment Bypass (HFSB)

Radial Gate Structure

– 4 Radial gates (10’ x 30’)– Discharge Capacity: 11,000 cfs

• Sluice Radial Gate Structure• Diversion Canal Structure

Physical Model

Sluice Radial Gate Structure (Left)and Diversion Canal (Right)

High Flow Bypass Radial Gate Structure

Page 19: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Physical Model

Page 20: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Physical Model

Page 21: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Test Flows– 6,000 cfs

• 1991 Flood

– 14,000 cfs • 1998 Flood

Physical Model Tests

Page 22: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Water Surface Elevations– Point Gages

• Dam Crest• Upstream Fishway Exit• Upstream of Spillway Weir

• Velocity– Recorded during peak flow– Measured 1’ (20’ prototype) from upstream toe of dam

• 8 stations– 2.5’ centers

– Deposition• Photogrammetry

– Estimate sediment volume– Survey

• Sediment elev. along downstream perimeter of depositions– Soil samples

• Gradation analysis to compare with original sediment bed composition

Data Collection

Page 23: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Current Condition Test Results

Page 24: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Existing Conditions – Sluice Radial Gate Structure & Diversion Canal

• Sediment passes through both structures• Sediment deposits in spillway and diversion canal

Results – 6,000 cfs

Page 25: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Existing Conditions – Sluice Radial Gate Structure & Diversion Canal

Results – 6,000 cfs

Upstream of Sluice Radial Gate Structure

Spillway Downstream of Sluice Radial Gate Structure

Upstream of Diversion Canal

Upstream Fishway Exit

Page 26: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Sediment Quantities– 3.14 yd3 placed in model– 0.049 yd3 accumulated upstream of spillway weir 1– 0.011 yd3 accumulated within diversion canal

Results – 6,000 cfs• Existing Conditions

– Sluice Radial Gate Structure & Diversion Canal

Page 27: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Existing Conditions – Sluice Radial Gate Structure & Diversion Canal

• Sediment passing through both structures• Sediment fills spillway & diversion canal• Sediment reaches crest of dam

Results – 14,000 cfs

Page 28: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Existing Conditions – Sluice Radial Gate Structure & Diversion Canal

Results – 14,000 cfs

Upstream of Sluice Radial Gate Structure & Dam Crest

Spillway Downstream of Sluice Radial Gate Structure

Downstream of Diversion Canal

Upstream Fishway Exit

Page 29: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Sediment Quantities– 5.63 yd3 placed in model– 0.281 yd3 accumulated upstream of spillway weir 1– 0.131 yd3 accumulated within diversion canal

Results – 14,000 cfs• Existing Conditions

– Sluice Radial Gate Structure & Diversion Canal

Page 30: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Proposed Condition Test Results

Page 31: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Proposed Conditions – Sluice Radial Gate Structure & Diversion Canal – High Flow Bypass Radial Gate Structure (At Right Bank)

• Sediment passing through both structures• Sediment fills spillway, Diversion Canal clear

Results – 6,000 cfs

High Flow Bypass Structure Sluice Radial Gate Structure

Diversion Canal

Page 32: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Results – 6,000 cfs

Upstream of Sluice Radial Gate Structure& Diversion Canal

Baffle Section Downstream of Sluice Radial Gate Structure

Upstream Fishway Exit

• Proposed Conditions – Sluice Radial Gate Structure & Diversion Canal – High Flow Bypass Radial Gate Structure (At Right Bank)

Upstream of HFSB Radial Gate Structure

Page 33: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Proposed Conditions – Test Velocities

Results – 6,000 cfs

Image at 2.40 cfs (4,293 cfs)

15-18 ft3/s

Page 34: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Sediment Quantities– 4.58 yd3 placed in model– 0.000 yd3 accumulated upstream of spillway weir 1– 0.000 yd3 accumulated within diversion canal

Results – 6,000 cfs• Proposed Conditions (Right Bank)

Page 35: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Proposed Conditions – Sluice Radial Gate Structure & Diversion Canal – High Flow Bypass Radial Gate Structure (At Right Bank)

• Sediment passing through both structures• Sediment fills spillway, Diversion Canal clear

Results – 14,000 cfs

High Flow Bypass Structure

Sluice Radial Gate Structure

Diversion Canal

Page 36: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Results – 14,000 cfs

Upstream of Sluice Radial Gate Structure& Diversion Canal

Spillway Downstream of Sluice Radial Gate Structure

Upstream Fishway Exit

• Proposed Conditions – Sluice Radial Gate Structure & Diversion Canal – High Flow Bypass Radial Gate Structure (At Right Bank)

Upstream of HFSB Radial Gate Structure

Page 37: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Proposed Conditions (Right Bank)– Test Velocities

Results – 14,000 cfs

Image at 7.90 cfs (14,132 cfs)

15-18 ft3/s

Page 38: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Sediment Quantities– 5.85 yd3 placed in model– 0.383 yd3 accumulated upstream of spillway weir 1– 0.000 yd3 accumulated within diversion canal

Results – 14,000 cfs• Proposed Conditions (Right Bank)

Page 39: High Flow Sediment Bypass for Robles Diversion Dam Presentation

• Sluice Gate Radial Structure Spillway – Filled during high flows

• Diversion Canal Structure– Clear during high flows with

HFSB Structure in place

• Fish Bypass Structure– Plugged during high flows

at both entrance and exit

• Gate Operations– Aids in directing sediment

transport

Physical Model Study Conclusions

Page 40: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Numerical Model Results: Without HFSB

(b) After Matilija Dam removal(a) before Matilija Dam removal

Page 41: High Flow Sediment Bypass for Robles Diversion Dam Presentation

Numerical Model Results: after Matilija Dam Removal

(b) With HFSB(a) Without HFSB


Top Related