Payload (mT) 50 60 70 80 90 100 110 120 130
FSB4 SSMEStandard ETNo upper stage
FSB5 SSMEStretched ET1 J-2X US
FSB5 SSMEStd ET2 J-2X-285
Add US
FSB3 SSME
Standard ETNo upper stage
HLVHLV
SLS Evolution Path
FSB4 SSMEStretch ETNo upper stage
HLV
![Page 3: Heavy Lift Vehicle Configurations](https://reader035.vdocuments.us/reader035/viewer/2022062310/568166d8550346895ddaf318/html5/thumbnails/3.jpg)
33
Payload (mT) 50 60 70 80 90 100 110 120 130
Existing Hardware &
Current Contracts
DM-3
Space Shuttle
Ares I
FSB3 SSME
Standard ETNo upper stage
Liberty
• DM-3 provides directly applicable technology maturation for next generation systems
• DM-3 static test is the third in a critical series of motor tests to evolve and confirm the final Ares First Stage configuration
• DM-3 provides significant risk mitigation for new motor features and satisfies 35 specific design objectives
DM-3 Evolution and Applicability
FSB4 SSMEStandard ETNo upper stage
FSB5 SSMEStretched ET1 J-2X US
FSB5 SSMEStd ET2 J-2X-285
Add US
FSB3 SSME
Standard ETNo upper stage
HLVHLV
FSB4 SSMEStretch ETNo upper stage
HLV
![Page 4: Heavy Lift Vehicle Configurations](https://reader035.vdocuments.us/reader035/viewer/2022062310/568166d8550346895ddaf318/html5/thumbnails/4.jpg)
44
DM-3 Major Test Objectives
Overview
• Demonstrate compliance to ballistic performance requirements at a 90oF PMBT
• Assess ballistic predictions with high aft segment mach number and erosive burning at the 90oF PMBT requirement
• Assess reduced insulation thickness as it approaches the projected flight profile
Verify PBI-NBR field joint performance at the upper temperature requirement
• Evaluate aft dome flow characteristics and effect on insulation and boot at the 90oF PMBT requirement
• Verify nozzle erosion at the 90oF PMBT requirement
• Verify nozzle bondline performance at the upper extreme temperature requirement
• Evaluate FNR flat development and potential abnormal erosion
Assess performance of ENKA CCP in ply-lift prone locations
Evaluate nozzle contour change
• Evaluate silica cowl performance
Critical Assessments
• Metal Structural Integrity*• Redundant and Verifiable
Seals*• Pressure and Temp on Joints• Joint Thermal Barrier• FJPS• Case Insulation Operational
Integrity*• Case Insulation Thermal SF• Joint Insulation*• Stress Relief Flap*• Inhibitors*• Field Joint System*• Insulation Structural SF*• Igniter Insulation• Safe & Arm• Operational Pressure
Transducers• PMBT*• Propellant Performance*• Bore Choking SF*• Propellant Structural SF*• Nozzle Vectoring• Flex Boot Vectoring
Capability• Flex Boot Performance
Factor• Throat Erosion• Nozzle Flame Front Liner
Erosion• Nozzle Primary Structural
Elements• Nozzle Phenolics Structural
SF• Nozzle Pre-loaded Bolts• Geometric Angular Alignment
and Radial Offset • Nozzle Barrier• TVC System• Actuator Last Commanded
Position• Shock and Vibration• TVA Temperatures• DFI• Forward Test Stand
Motor Objectives
* Objectives apply to more than one segment