![Page 1: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/1.jpg)
Premier Ponds & Wildlife, Inc.JP Construction Services
Containment Site Installation
![Page 2: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/2.jpg)
Haul Frames and Corners to the Jobsite
![Page 3: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/3.jpg)
Evaluate the Condition of the JobsiteHAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions, Wildlife, Rocks or debris in area to be lined
![Page 4: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/4.jpg)
Visually Inspect the EquipmentHAZARDS TO WATCH FOR : Broken Glass, Leaking Fuel / Hydraulic Line, Inspect Slings and Rig Equipment.
![Page 5: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/5.jpg)
Install Proper Rigging on Track Hoe to Lay Out the Roll of Plastic Material
HAZARDS TO WATCH FOR : Improper Operation of Equipment, Improper Rig Installation, Improper Rigging Material, Pinch Point at Rigging.
** MAKE SURE THERE ARE SAFETY SPOTTERS INVOLVED IN THIS STEP**
![Page 6: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/6.jpg)
Lay Out the Cover Plastic MaterialHAZARDS TO WATCH FOR : Suspended Roll Hits Person, Equipment Hits Person,Equipment Cannot Handle Load. Watch out for slips, trips, and falls.
![Page 7: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/7.jpg)
Lay Out the 6,000 lb Bull RopeHAZARDS TO WATCH FOR : Slip, Trip, or Fall.
![Page 8: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/8.jpg)
Lay Out Roll of Plastic Material: 1st Piece Along Edge of Mark
HAZARDS TO WATCH FOR : Suspended Roll Hits Person, Equipment Hits Person, Equipment Cannot Handle Load. Watch out for slips, trips, and falls. ** MAKE SURE THERE ARE SAFETY SPOTTERS INVOLVED IN THIS STEP**
![Page 9: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/9.jpg)
Align Installers Along the Edge of the Plastic Material and Pull it Out
HAZARDS TO WATCH FOR : Slip, Trip, or Fall. Watch out for open trench/sump.
![Page 10: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/10.jpg)
Lay Out Roll of Plastic Material: 2nd Piece Along Edge of 1st
HAZARDS TO WATCH FOR : Suspended Roll Hits Person, Equipment Hits Person, Equipment Cannot Handle Load. Watch out for slips, trips, and falls. ** MAKE SURE THERE ARE SAFETY SPOTTERS INVOLVED IN THIS STEP**
![Page 11: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/11.jpg)
Align Installers Along the Edge of the Plastic Material and Pull it Out
HAZARDS TO WATCH FOR : Slip, Trip, or Fall. Watch out for open trench/sump.
![Page 12: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/12.jpg)
(CONTINUE THE LAYOUT AND PULL OUT PROCESS UNTIL ALL
ROLLS ARE INSTALLED- TRIM AND WELD EDGES OF PLASTIC)
![Page 13: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/13.jpg)
Laying Out the FramesAlign the Frames Along the Edge of the Plastic Material
HAZARDS TO WATCH FOR : Slip, Trip, or Fall.
![Page 14: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/14.jpg)
Secure the Frames Together With 6,000 lb Bull Tape
HAZARDS TO WATCH FOR : Hit by a Mallet.Slip, Trip or Fall
![Page 15: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/15.jpg)
Secure the Frames Together With 6,000 lb Bull Tape
HAZARDS TO WATCH FOR : Hit by a Mallet.Slip, Trip or Fall
![Page 16: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/16.jpg)
Secure the Frames Together With 6,000 lb Bull Tape
HAZARDS TO WATCH FOR : Hit by a Mallet.Slip, Trip or Fall.
![Page 17: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/17.jpg)
HAZARDS TO WATCH FOR : Slip, Trip or Fall.Power Tools Hitting Hands.
Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips
![Page 18: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/18.jpg)
Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips
HAZARDS TO WATCH FOR : Slip, Trip or Fall.Power Tools Hitting Hands.
![Page 19: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/19.jpg)
Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips
HAZARDS TO WATCH FOR : Slip, Trip or Fall.Hands Getting Caught in Frames.
![Page 20: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/20.jpg)
HAZARDS TO WATCH FOR : Slip, Trip or Fall.Hands Getting Caught in Frames.
Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips
![Page 21: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/21.jpg)
Examine the Three Wall Sides and all Clips
![Page 22: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/22.jpg)
Three Wall Sides Completed
![Page 23: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/23.jpg)
Lay Out the Textured Plastic MaterialHAZARDS TO WATCH FOR : Slip, Trip, Fall.
![Page 24: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/24.jpg)
Install the Textured Liner MaterialHAZARDS TO WATCH FOR : Cut by Open Blade.Slip, Trip, or Fall. Watch for trench/sump mark.
![Page 25: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/25.jpg)
Install the Textured Liner MaterialHAZARDS TO WATCH FOR : Cut by Open Blade.Slip, Trip, or Fall. Watch for trench/sump mark.
![Page 26: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/26.jpg)
Extruding of Plastic MaterialHAZARDS TO WATCH FOR : Cut by Open Blade.Slip, Trip, or Fall.
![Page 27: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/27.jpg)
Tanks are then Transported onto the Containment Site
HAZARDS TO WATCH FOR : MAKE SURE THERE ARE SAFETY SPOTTERS FOR THIS STEP.
![Page 28: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/28.jpg)
Final Wall Close Up (Same Frame Installation Procedure as Before)
![Page 29: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/29.jpg)
Final Wall Close Up (Same Frame Installation Procedure as Before)
![Page 30: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/30.jpg)
Final Wall Close Up (Same Frame Installation Procedure as Before)
![Page 31: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/31.jpg)
Final Close Up Examination & Finishing Touches
![Page 32: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/32.jpg)
Final Close Up Examination & Finishing Touches
![Page 33: Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1acd7f8b9ab059970219/html5/thumbnails/33.jpg)
Murphy Containment Pit- Final