Download - Hampton products pres. m6 final 05120214
![Page 1: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/1.jpg)
Moe ArnaizCEO & Co-Founder
eMOBUS
Modernize and Move Forward!
M6 Mobility xChange Summit 2014Hampton Products Case Study
![Page 2: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/2.jpg)
manage mobility smarter
![Page 3: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/3.jpg)
Times They are a-Changin
• Be strategic • Focus • Remain flexible• Do more
![Page 4: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/4.jpg)
Modernize
![Page 5: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/5.jpg)
Why?
Sit on hold with carriers.
Take trivial support calls.
Try to become a billing expert.
Manually build reports.
![Page 6: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/6.jpg)
It’s smart to ask for help.
![Page 7: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/7.jpg)
eMOBUS helps (>400 companies) modernize the way they manage enterprise mobility.
![Page 8: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/8.jpg)
Hampton Products
![Page 9: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/9.jpg)
• Failed EMM deployment
• Unpredictable costs• Burden on resources• Lack of visibility
Challenges
![Page 10: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/10.jpg)
Deployed in Days
• Required only carrier logins
• Extracted necessary data
• Up-and-running in the same week
![Page 11: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/11.jpg)
Reduced Costs by >35%
• Optimized plans• Canceled unused lines• Prevent instead of react• Centralize MACD• Saved yearly fees in 1
week
![Page 12: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/12.jpg)
Offloaded Service Requests
• Relieved 1 FTE• Improved delivery• Implemented a
scalable approach
![Page 13: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/13.jpg)
Improved Visibility
• Flexible reports• Auto emailed to
stakeholders• One pane of glass
![Page 14: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/14.jpg)
![Page 15: Hampton products pres. m6 final 05120214](https://reader035.vdocuments.us/reader035/viewer/2022081413/5472bf04b4af9fb90a8b509d/html5/thumbnails/15.jpg)
888-eMOBUS-1 | emobus.com