![Page 1: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/1.jpg)
![Page 2: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/2.jpg)
GREEN HYSLAND
Deployment of a H2 Ecosystem on
the Island of MallorcaMr. Jesús Manuel Gil Jiménez
Director of the Innovation and New Energies Dept. of Enagás
E-mail: [email protected]
• Lloseta
![Page 3: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/3.jpg)
GREEN HYSLAND – Mallorca’s context
Hydrogen pipeline proposal
Redexis’ natural gas network: primary gas pipelinesEnagás’ Transport Network: backbone network
Germany UK Spain Nordic countries
Benelux France Italy Others
11,947,382 tourists visited Mallorca in 2018
Development of a “H2 ecosystem” which can be replicated across other islandsand remote territories in UE and beyond
Source: “El turismo a les Illes Balears. Annuari 2018”. AEITB.
Source: Red Electrica Annual report 2018. Avaiable at https://www.ree.es/en/publications/annual-report-2018
Source: Enagás
![Page 4: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/4.jpg)
GREEN HYSLAND project schematic
![Page 5: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/5.jpg)
Location of GREEN HYSLAND project deployment sites
Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid
![Page 6: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/6.jpg)
GREEN HYSLAND – key figures
Avoided carbonfootprint: more than
21,000 tpy
New direct and indirect employment ecosystem associated to hydrogen
Development of a sustainablelarge-scale island-based H2
hub in Mallorca
Development a long-term roadmap to lay the path for a
local & regional based economy towards 2050
Scalabilityand
Replicability
Estimated investment ≈ 50 M€
![Page 7: GREEN HYSLAND Jimenez...Site 1: Lloseta Green H2 plant Site 2: Lloseta Municipal building FC Site 3: Cas Tresorer H2/NG mixing station & connection to NG gas grid Site 4: Palma hotel](https://reader030.vdocuments.us/reader030/viewer/2022041121/5f361bef133f4c078502fb85/html5/thumbnails/7.jpg)