Transcript
Page 1: Green Bank Telescope Performance

July 2007 Pune, NCRAGBT Performance

Green Bank Telescope Performance

Dana S. Balser

Page 2: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Telescope Structure

Page 3: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Unblocked Aperture

Page 4: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Frequency Coverage

Page 5: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Telescope Control

Surface

Focus

Pointing

Page 6: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Pointing Requirements

2

2El

2Az

22

2

2

GHZ

arcsec 740

2ln4exp)(

f

g

Condon (2003)

20.0 10%)( Usable

14.0 5%)( Good

s

s

f

f

Page 7: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Focus Requirements

2/8/)95.0( Usable

4/16/)99.0( Good

4

Axial 2ln4exp2

asa

asa

a

a

sa

yg

yg

yg

Srikanth (1990)Condon (2003)

5.03.17

mm 3.2 mm 7 :band-Q

mm/3.7Scale Plate

3/16/)99.0( Good

6

Lateral 2ln4exp

"

"

2

f

x

xg

xg

s

lsl

l

l

sl

Page 8: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Surface Requirements

Ruze (1966)Condon (2003)

37.04/:Usable

54.016/ :Good

area.primary geometric theis A

.efficiency aperture theis

.atmosphere for the corrected re temperatuantenna theis T

constant. sBoltzmann' isk

density.flux theisS

A

kT2S

error. surface rms theis

surface. for the efficiency aperture theis

4exp

g

a

'A

ga

'A

s

2

s

s

s

Page 9: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Repeatable Errors – Pointing

• Telescope misalignments:• Azimuth track tilt• Horizontal collimation• Elevation axle collimation• Encoder offsets

• Gravity: assume linear elastic structure

Cos(E)d Sin(E)b Cos(A)d Sin(A)c d E

E)Sin(A)Sin(a E)Cos(A)Sin(b

Cos(E)d Sin(E)bd Cos(E)A

0,10,11,01,00,0

1,11,1

0,10,10,0

Page 10: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Repeatable Errors – Focus

• Gravity: assume linear elastic structure

Sin(E) C Cos(E) B A Z

Sin(E) C Cos(E) B A Y

Sin(E) C Cos(E) B A X

zzz

yyy

xxx

Page 11: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Repeatable Errors – Surface

• Gravity: • Homologous design (almost)• Photogrammetry (50.3 deg) Zero-point • Finite Element Model (FEM)• Best Fit Parabola (BFP) Active Surface: 2004 Panels

2209 Actuators

Page 12: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Point Source Calibrators

Condon & Yin (2005)

PCALS 4.0: 7108 sourcesTwo-dimensional rms error < 0.2 arcsec

3 mm pointing calibrators

Page 13: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Pointing Model

Cos(E)A SeriesAzimuth E SeriesElevation

Balser et al. (2002)

Page 14: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Focus Model

Axial Focus

mm Sin(E) 21.86 - Cos(E) 11.18 9.56 Z

mm Sin(E) 9.96 Cos(E) 183.74 148.39- Y

mm Sin(E) 25.55 - Cos(E) 301.98 - 212.55 X

Ghigo et al. (2001)

Page 15: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Finite Element Model – Gain Elevation Curve

K-band (20 GHZ)

Page 16: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Finite Element Model – Sidelobes

O12 EL

Page 17: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Non-repeatable Errors – Thermal

GHz 30at 3 mm 30

2/8/)95.0( Usable

GHz 30 offrequency aat 3 mm 30

GHz 3 offrequency aat /3 mm 03

asa yg

Page 18: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Non-repeatable Errors – Wind

0.20 f 10%) s

( Usable

GHz 20at 0.22 f 1sm6sat''8

wind1

2)wind(2

arcsec

2

1sm

s16.0)wind(

1

Page 19: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Thermal Pointing and Focus Corrections

Constantikes (2003)

Page 20: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Data Collection and Quality

Gaussian Fits (Az, El, Focus)

Polarization (LCP – RCP)

Direction (Forward – Backward)

Jack Scan

All-sky ObservationsSingle Source Track

Up-Down at Night GravityNCP Source Temperature

Page 21: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Thermal Model – Focus

Constantikes (2003)

Term Coefficient Min-Max Significance Parameter

M1 1.086 13.1 14.3 SR-PriM2 -0.697 6.2 -4.3 VFA-PriM3 3.981 15.6 62.0 HFAM4 -7.326 0.9 -6.8 BUS V1M5 -0.688 12.1 -8.3 BUS V2M6 -2.576 12.1 -31.2 BUS FM7 -180.630 0.0 0.0 Offset

M8 66.189 .7 43.1 sin term

M9 196.949 0.6 110.8 cos term

Page 22: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Thermal Model – Azimuth

Constantikes (2003)

Term Coefficient Min-Max Significance Parameter

M1 5.5862 4.0 22.4 Alidade M2 -8.0331 2.7 21.3 HFAM3 -1.6289 2.4 3.8 BUSM4 1.3683 2.0 2.8 VFAM5 3.4124 0.0 0.0 CA, d(0,0)M6 1.3223 0.7 1.0 NPAE, b(0,1)M7 3.5152 0.9 3.0 IA, d(0,1)M8 -2.4960 1.9 4.8 AW, b(1,1)M9 -1.3360 1.8 2.5 AN, a(1,1)

Page 23: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Thermal Model – Elevation

Constantikes (2003)

Term Coefficient Min-Max Significance Parameter

M1 -4.6455 1.2 -5.3 BUSM2 1.7830 15.6 -27.8 HFAM3 4.4488 5.9 26.4 VFAM4 -8.4477 1.6 -14.0 AlidadeM5 62.2218 0.0 +0.000 -IE,d(0,0)M6 -55.8624 0.7 -62.792 HZCZ,b(0,1)M7 -22.8268 0.9 -38.216 HZSZ,d(0,1)M8 2.4960 2.0 +2.169 -AW,c(1,0)M9 -1.3360 2.0 -1.750 AN,d(1,0)

Page 24: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Performance – Blind Pointing

Page 25: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Pointing Data Quality – Polarization

arcsec 0.57 0.13- RCP] - [LCP

Page 26: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Pointing Data Quality – Direction

arcsec 3.2B] - [F

arcsec 0.89- B] - F[

El

Az

Page 27: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Cross-Elevation Uncertainty

arcsec 2.7 Cos(E)]A [

Page 28: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Elevation Uncertainty

arcsec 4.8 E][

Page 29: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Focus Data Quality – Polarization

mm 0.810.0019- RCP] - [LCP

Page 30: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Focus Uncertainty

mm 1.2][ f

Page 31: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Performance – Offset Pointing

Page 32: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Offset Pointing Uncertainty

arcsec 7.22

Page 33: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Offset Focus Uncertainty

mm 2.1

mm 2.1

Page 34: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Performance – Tracking

arcsec 2.12 )/'10,/'2(,

)5,1(),(

)58,290(),(

mmt

El

t

Az

ElAz

ElAz

)m/'7.11,m/'8.10(t

El,

t

Az

)9.3,6.3()El,Az(

)37,99()El Az,(

Half-power in Azimuth Half-power in Elevation

)m/'4.11,m/'0.12(t

El,

t

Az

)8.3,0.4()El,Az(

)43,105()El Az,(

arcsec 2.12

Page 35: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Power Spectrum

Servo resonance 0.28 Hz

Page 36: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Servo Error

Page 37: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Performance – Summary

mm 2.5 focus)(

arcsec 5pointing)(1

mm 1.5 focus)(

arcsec 7.2pointing)(2

Benign Conditions: (1) Exclude 10:00 18:00 (2) Wind < 3.0 m/s

Blind Pointing: (1 point/focus)

Offset Pointing: (90 min)

Continuous Tracking: (30 min)

arcsec 12

Page 38: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Surface Improvements – Holography

Traditional Holography(Phase Coherent Holography)

Out-of-Focus Holography(Phase Retrieval Holography)

Maddalena

Nikolic et al. (2006)

Page 39: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Zernike Polynomials

Zernike (1934)Maeda (2003)

Page 40: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

OOF Holography – Gravity

c

Cos(E) b

Sin(E) a)E(zi

Nikolic et al. (2006)

Page 41: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Gain-Elevation Curve

Nikolic et al. (2006)

FEM only

FEM + OOF

Page 42: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

OOF Holography – Thermal Effects

m300 rms m220 rms

m220 rms

m220 rms

m330 rms

Page 43: Green Bank Telescope Performance

GBT Performance July 2007 Pune, NCRA

Summary Surface Performance


Top Related