Overview
BRT Corridor Selection Urban Core Infrastructure Investment
as Catalyst for Development Master Plan, Land Use and Zoning
Changes to Promote TOD Results Branding
![Page 3: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/3.jpg)
Bus Rapid Transit Features
Near Level Boarding Enhanced Service Frequency Off-board Fare Collection Unique Vehicles Real-time Passenger Information Passenger Friendly Waiting
Environment
![Page 4: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/4.jpg)
Project Map
![Page 5: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/5.jpg)
Transit System Connections
![Page 6: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/6.jpg)
Transit System Connections
![Page 7: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/7.jpg)
BRT Corridor Selection
EUCLID AVE - TRANSIT FOCUS
CHESTER AVE – AUTO FOCUS
CARNEGIE AVE - AUTO FOCUSD
OW
NT
OW
N –
MA
JOR
E
MP
LOY
ME
NT
CE
NT
ER
UN
IVE
RS
ITY
CIR
CLE
–M
AJO
R E
MP
LOY
ME
NT
C
EN
TE
R
![Page 8: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/8.jpg)
Urban Core Infrastructure Investment
$200 Million Total Project Cost $168.4 million FFGA
FTA New Starts $82.2 mil FTA Rail Mod. $ 0.6 mil ODOT $50.0 mil RTA $17.6 mil NOACA $10.0 mil City of Cleveland $ 8.0 mil
$31.6 million Non-FFGA
![Page 9: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/9.jpg)
Urban Core Infrastructure Investment
Building Face to Building Face Reconstruction
Utility Replacements and Betterments New Roadway, Curbs, & Sidewalks New Traffic Signal, Lighting, &
Communication Systems Landscaping & Irrigation System
![Page 10: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/10.jpg)
Urban Core Infrastructure Investment
Public Art Passenger Amenities 4.5 Miles of Dedicated BRT Lanes in
Median 2.6 Miles of Mixed-Use BRT Lanes in
Curb Lanes 36 Stations and Platforms 4.0 Miles of Bike Lanes
![Page 11: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/11.jpg)
Typical Section Lower Euclid
![Page 12: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/12.jpg)
Median Station Left Side
![Page 13: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/13.jpg)
Public Square/Lower Euclid
![Page 14: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/14.jpg)
Lower Euclid
![Page 15: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/15.jpg)
Typical Section Midtown
![Page 16: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/16.jpg)
Median Station Right Side
![Page 17: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/17.jpg)
Midtown
![Page 18: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/18.jpg)
Midtown
![Page 19: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/19.jpg)
Midtown
![Page 20: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/20.jpg)
Midtown
![Page 21: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/21.jpg)
Typical Section University Cir.
![Page 22: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/22.jpg)
Curbside Right Side
![Page 23: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/23.jpg)
University Circle
![Page 24: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/24.jpg)
University Circle
![Page 25: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/25.jpg)
Station Design
62 Stops @ 36 Stations 3 Unique Station Designs Public Square/Lower Euclid Midtown University Circle/East Cleveland A316 Stainless Steel and Glass Modular Base Design
![Page 26: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/26.jpg)
Station Features
Attractive Easily Accessible Fast-Loading Near Level Boarding ADA Compliant Conveniently Located Integrated Into The Community
![Page 27: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/27.jpg)
Station Features
Fare Vending Machines Emergency Phones CCTV Real-time Passenger Information Passenger-Friendly Waiting
Environment Benches and Lean Bars
![Page 28: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/28.jpg)
Public Square/Lower Euclid
![Page 29: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/29.jpg)
Public Square/Lower Euclid
![Page 30: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/30.jpg)
Midtown Stations
![Page 31: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/31.jpg)
Midtown Stations
![Page 32: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/32.jpg)
Curbside Stations
![Page 33: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/33.jpg)
Landscaping and Public Art
![Page 34: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/34.jpg)
MidTown Zoning Overlay District Minimum floor-area ratio, parking
mitigation, pedestrian emphasis, and façade improvements
Design Guidelines focus development away from parking garages and driveways
Transit orientation serves as the unifying element for the Corridor
Innovation Zone grant for Healthcare Corridor Plan
Guiding TOD through Zoning
![Page 35: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/35.jpg)
Midtown Zoning Overlay
![Page 36: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/36.jpg)
Results
![Page 37: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/37.jpg)
Lower Euclid
Over $110 million in development has created nightclubs, apartments, restaurants, and bowling alley.
![Page 38: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/38.jpg)
Playhouse Square
More than $61 million has been invested in the Idea Center, United Way and Hanna Theatre renovations.
![Page 39: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/39.jpg)
Cleveland State University
CSU master plan revised to orient housing, student center and new academic buildings along Euclid Avenue. Re-development is estimated at $180 million.
![Page 40: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/40.jpg)
Midtown
The price of an acre of land in the long-blighted Midtown area has doubled in the past five years.
![Page 41: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/41.jpg)
Cleveland Clinic
The Cleveland Clinic is investing $1.2 billion on Euclid Avenue.
![Page 42: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/42.jpg)
University Circle
Over $1.6 billion is being investedClev. Museum of Art - $350 millionPeter B. Lewis Building - $ 65 million University Hospitals - $500 millionVA Hospital & Offices - $370 million
![Page 43: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/43.jpg)
Ridership GrowthMONTHLY RIDERSHIP COMPARISON #6 VS HEALTHLINE
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
November December January February March April May June July August September October
MONTH
RIDE
RS
#6
HEALTHLINE
![Page 44: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/44.jpg)
Ridership GrowthCUMMULATIVE RIDERSHIP#6 VS HEALTHLINE
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
November December January February March April May June July August September October
MONTH
TOTA
L RI
DESH
IP
#6
HEALTHLINE
53% INCREASE
![Page 45: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/45.jpg)
Euclid Corridor Transportation Project
![Page 46: Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project](https://reader038.vdocuments.us/reader038/viewer/2022103022/56649cd95503460f949a3087/html5/thumbnails/46.jpg)
Greater Cleveland Regional Transit Authority
THE HEALTHLINE
EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT
Michael J. Schipper, P.EDGM- Engineering & Project
Management
June 24, 2009