1
DEPARTMENT OF WATER RESOURCES
GOVERNMENT OF ODISHA
ANNUAL REPORT: 2018-19
QUALITY CONTROL DIVISION, BHADRAK
2
ANNUAL REPORT: 2018-19
GOVERNMENT OF ODISHA
DEPATMENT OF WATER RESOURCES
ANNUAL REPORT: 2018-19 OF
QUALITY CONTROL DIVISION, BHADRAK
Executive Engineer, Quality Control division,
Bhadrak
3
ANNUAL REPORT: 2018-19 QUALITY CONTROL DIVISION, BHADRAK
Engineer-in- Chief, WR Department,
Government of Odisha, BBSR
Chief Engineer, Quality Control & Research,
WR Department, Unit-8, BBSR
Director, Research & Quality Control.BBSR
Executive Engineer,
Quality control Division,
Bhadrak
GOVERNMENT OF ODISHA
DEPATMENT OF WATER RESOURCES QUALITY CONTROL DIVISION, BHADRAK
4
contents
SL No. Description Page No.
1 Introduction 5
2 Jurdiction of this
Division
5
3 The work
Distribution of AEE
6
4 Inspection Verhicle 6
5 Present staff position
of Quality Control
Division,bhadrak
7
6 List of Equipments 8-11
7 List of works visited
by Quality Control
Inspection authorities
12-33
8 List of works visited
by Quality Control
Authorities (Higher
Authorities/SQM)
34-37
9 Photo gallery(
Inpected by Quality
Control Officers)
38-45
5
INTRODUCTION
The Quality Control Division, Bhadrak with Headquarter at Bhadrak was created vide Govt. notification no. 5417 dt. 27-02-2012 and started functioning in the year 2015 restructuring of Water Resources Department. This office was temporarily functioning with FA/3(F type) quarter in 1st floor of block A having two rooms of size about 10ft x 12ft in the premises of Salandi Canal Division, bypass, Bhadrak.
Newly constructed Bhadrak Sub –division office building of
Salandi Canal Division, Bhadrak situated infront of Salandi IB is transferred to the Executive Engineer, Quality Control Division for the office and laboratory purpose vide office order No. 5412 dtd 28.11.2018 of Executive Engineer, Salandi Canal Division, Bhadrak and the same was occupied by the Executive Engineer, Quality Control Division, Bhadrak on 25.3.2019 after complete construction of the said building.
JURISDICTION OF THIS DIVISION
Jurisdiction of this division is as follows-
1. Aul Embankment Division, Aul
2. CAD Division no-3, Bhadrak
3. Drainage Division, Bhadrak
4. Drainage Division, jajpur
5. Jajpur irrigation Division, jajpur
6. Minor Irrigation Division, Jajpur
7. Soro Canal Division, Soro
6
THE WORK DISTRIBUTION OF AEE(C) HAVE BEEN MADE AS FOLLOWS
1. Prasanna Kumar Dash, AEE(C)-
i) Aul Embankment Division, Aul
ii) Soro Canal Division, Soro
2. Sumanta Kumar Madhei,AEE(C)- i) Drainage Division, Jajpur ii) Jajpur Irrigation Division, Jajpur
iii) Minor Irrigation Division, jajpur
3. Swapna Priyadarsini Acharya, AEE(C) –
i) Drainage Division, Bhadrak
ii)Cad Division No-3, Bhadrak
INSPECTION VEHICLE
Two numbers of vehicles have been provided to this division on hiring basis for inspection of ongoing worksof above 7 (Seven) Numbers of Divisions.
The undersigned has been requested to the Director, Research and Quality Control, Bhubaneswar to provide one more private vehicle on hiring basis to this Division.
7
PRESENT STAFF POSITION OF QUALITY CONTROL DIVISION,BHADRAK as on 31-03-2019
SI
No
Name of
Sanctioned Post
No
of
Posts
Name of Staff in Position
No
of
Staff
Vacant Remarks
GRADE –A
1 Executive
Engineer 1
Sri Pravat Chandra
Pattnaik 1 Joined on dt.
29.06.2018
2 Asst. Executive
Engineer 1 Sri Prasanna Kumar Dash 1
Joined on
dt.20.06.2016
3 Asst. Executive
Engineer 1
Sri Sumanta Kumar
Madhei 1
Joined on
dt.16.06.2016
4 Asst. Executive
Engineer 1
Er. Swapna Priyadarsini
Acharya 1 Joined on
dt.06.06.2018
GRADE-B
5 Asst. Engineer 1 Sri Prasant Kumar
Mohanty 1
Joined on
dt. 09.05.2018 and
Deputated to
EE,QCD,Cuttack
on dt.26.06.2018 6 Asst. Engineer 1 ........................ Nil Vacant
7 Junior Engineer 1 Miss Monalisa Panda Nil Vacant
(Deputated from
Markona Canal
Division,Markona
from
dt.10.01.2017)
8 Junior Engineer 1 Tusharkant Mohapatra 1 Joined on
dt.13.01.2019
9 Embankment
Inspector 1 ........................ Nil Vacant
GRADE-C
10 Senior Clerk 1 Sri Himanshu Sekhar
Jena 1
Joined on
dt.13.02.2018
11 Junior Clerk 2 ........................ Nil Vacant
12 Asst. Embankment
Inspector 1 ........................ Nil Vacant
13 Laboratory
Assistant 1 ........................ Nil Vacant
GRADE –D
14 Laboratory
Attendant 1 Sri Kailash Chandra Rout Nil Vacant
Deputated from
EE,QCD,Cuttack
from dt.16.03.2016
15 Peon 5 Lochan Sahoo 1 4 Vacant Joined on
dt.01.03.2019
16 Night Watchman-
cum Sweeper 1 ........................ Nil Vacant
Total 21 8
LISTS OF EQUIPMENTS :-
8
SI. No Name of the Equipments Quantity in
(Nos/Set)
Year of
Purchase
1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016
2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016
3 Sieve G.I Frame 30 cm DiaX40mm 3 Nos 2016
4 Sieve G.I Frame 30 cm DiaX20mm 3 Nos 2016
5 Sieve G.I Frame 30 cm DiaX16mm 3 Nos 2016
6 Sieve G.I Frame 30 cm DiaX12.5mm 3 Nos 2016
7 Sieve G.I Frame 30 cm DiaX10mm 3 Nos 2016
8 Sieve G.I Frame 30 cm DiaX4.75mm 3 Nos 2016
9 Sieve G.I Frame 30 cm DiaX2.36mm 3 Nos 2016
10 Sieve Brass Fram 20 cm DiaX10mm 3 Nos 2016
11 Sieve Brass Frame 20 cm DiaX2.36mm 3 Nos 2016
12 Sieve Brass Frame 20 cm DiaX1.18mm 3 Nos 2016
13 Sieve Brass Frame 20cm Dia X600 micron 3 Nos 2016
14 Sieve Brass Frame 20 cm DiaX300 micron 3 Nos 2016
15 Sieve Brass Frame 20 cm DiaX150 micron 3 Nos 2016
16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016
17 Pan Balance (Capacity 10 Kg) 3 Nos 2016
18 Electronic Balance(Capacity 10KGX.5Gm) 3 Nos 2016
19 Electronic Balance(Capacity 300GmX.01Gm) 3 Nos 2016
20 MouldCast Iron for 150mm Cube with ISI Certified 29 Nos. 2016
21 Tamping Rod,Steel,16mm DiaX600mm length with ISI
Certification Mark,IS:10086 3 Nos 2016
22 Sample Tray(Enamel) SIZE 660X560X80mm 3 Nos 2016
23 Sample Tray(Enamel) SIZE 660X460X50mm 3 Nos 2016
24 Sample Tray(Enamel) SIZE 450X300X40mm 3 Nos 2016
25 Sample Tray(Enamel) SIZE300X250X40mm 3 Nos 2016
26 Sample Tray(Enamel) SIZE200X150X30mm 3 Nos 2016
27 Sample Tray(Enamel) SIZE 450X450X50mm 3 Nos 2016
28 Gauge Trowel,100 to 150mm long blade with Straight
edge weight 210+10Gm 3 Nos 2016
29 Thickness Gauge with ISI Certification Mark Is:2386 3 Nos 2016
30 Length Gauge with ISI Certification Mark IS:2386 3 Nos 2016
31 Speed Moisture meter,Range 0-25% Gauge Division
.05% with Digital Weighing Nalance 3 Nos 2016
32 Core Cutter 3 Nos 2016
33 Dolly for AIM-16106,Core Cutter 3 Nos 2016
9
34 Rammer for Cylindrical Core Cutter 150mm
DiaX300mm Long,Core Cutter 3 Nos 2016
35 Bulk Density measure Set of Two 3 Nos 2016
36 Steel Scale,300mm 3 Nos 2016
37 P Measuring Cylinder
Graduated,Polycarbonate,Capacity 1000ml 3 Nos 2016
38 Concrete Test Hammer with NCCBM Calibrated 1 Nos 2017
39
Supplying Analogue Compression Testing Machine,
Capacity 1000KN,Electrically Operated, Single
Gauge(As per IS:14858(2000)BS 1881)
1 Nos 2018
40 Supplying of Vibrating Table 75X75 cm size for 6
Mould of 150mm Compaction of Cement Concrete. 1 Nos 2018
41 Supplying of Sieve Shaker motorised with Built in
Digital Timer. 1 Nos 2018
42 Supplying of Compaction Test Apparatus for Light
Compaction. 1 Nos 2018
43 Pan and Cover for 20cm dia sieve (conforming to ISI
specification) 1 Nos 2018
44 Sieve Brass Frame 20 cm dia x 1.18mm (
conforming to ISI specification) 1 Nos 2018
45 Sieve Brass Frame 20 cm dia x 2.36 mm (
conforming to ISI specification) 1 Nos 2018
46 Sieve Brass Frame 20 cm dia x4.75mm
(conforming to ISI specification) 1 Nos 2018
47 Sieve Brass Frame 20 cm dia x150micron
(conforming to ISI specification) 1 Nos 2018
48 Sieve Brass Frame 20 cm dia x300 micron
(conforming to ISI specification) 1 Nos 2018
49 Sieve Brass Frame 20 cm dia x600micron
(conforming to ISI specification) 1 Nos 2018
50 Adopter for 30 cm dia sieve(conforming to ISI
specification) 1 Nos 2018
51 Pan and Cover for 30 cm dia sieve(conforming to ISI
specification) 1 Nos 2018
52 Sieve GI frame 30 cm dia X 63mm
(conforming to ISI specification) 1 Nos 2018
53 Sieve GI frame 30 cm dia X 40 mm
(conforming to ISI specification) 1 Nos 2018
54 Sieve GI frame 30 cm dia X 31.5mm
(conforming to ISI specification) 1 Nos 2018
55 Sieve GI frame 30 cm dia X 20mm
(conforming to ISI specification) 1 Nos 2018
56 Sieve GI frame 30 cm dia X 12.5mm
(conforming to ISI specification) 1 Nos 2018
57 Sieve GI frame 30 cm dia X 6.3mm
(conforming to ISI specification) 1 Nos 2018
10
58 Sieve GI frame 30 cm dia X 2.36 mm
(conforming to ISI specification) 1 Nos 2018
59 Air Permeability Apparatus (Blaine Type) with ISI
Certification mark IS:5516,fitted in Aluminium Box 1 Nos 2018
60 Pycnometer 1 Nos 2018
61 Evaporating Dish,Flat Bottom with Porout,Size
150X80mm 1 Nos 2018
62 Stop Watch 'Mechanical' 1/5 sec 1 Nos 2018
63 Weight Box (10mg to 5 kg) 1 Set 2018
64 Plastic Limit set comprising of glass plate,Brass
rod,Spatula,Moisture Tin & Porcelein Dish 1 Nos 2018
65 Steel Tape 3 meter 1 Nos 2018
66 Steel Tape 5 meter 1 Nos 2018
67 Steel Tape 15 meter 1 Nos 2018
68 Metallic Tape 15 meter 1 Nos 2018
69 Metalic Tape 30 meter 1 Nos 2018
70 Compaction Factor Apparatus (As per Ref: Standard
IS:5515) 1 Nos 2019
71 Air Entrainment Meter Capacity 0.005 m(5 Litres) 1 Nos 2019
72 Laboratory Permeability Apparatus with overhead tank
and rammer (As per Ref: Standard IS:2720 (Part-17),
IS:11209)
1 Nos 2019
73 Vicat Apparatus with ISI Certification Mark,IS:5513 1 Nos 2019
74 Density Basket (As per Ref: Standard IS:2386 (Part-
3)) 1 Nos 2019
75 Concrete Mixer, Drum Type, Capacity 1 Cubic Feet 1 Nos 2019
76 Los Angeles Abrasion testing machine with Counter
(Drum with RPM 30-33,Abrasion Charge 48 mm dia.-
12 No, Conforming to IS:10070)
1 Nos 2019
77 Aggregate Crushing Value Apparatus (As per reference
standard IS:9376) 1 Nos 2019
78
Aggregate Impact Tester (Coarse Aggr-Cylindrical cup
metal measure tempering to with ISI mark Automatic
blow counter all confirming to IS:9377) 1 Nos 2019
79 Electronic Balance, Capacity 100Kg X 10g 1 Nos 2019
80
Liquid Limit Device Consists of: -Motorized. Brass
cup, Rubber base ASTM Grooving Tool (Type B of IS :
9259) 1 Nos 2019
81 Le Chatelier Apparatus 1 Nos 2019
82 Weight Box ( 1mg to 5 Kg) 1 Set 2019
11
83
Hand Operated Soil Sample Extractor for 38 mm.
Consists of :Sample exctractor frame jarring
link,adopter with locking screw-38mm dia sampling
tube,Split mould-38mm diaX76mm long Sampling tube
asx per IS specification.
1 Set 2019
84 Electronics Balance
Capacity 600gm X 0.01g 1 Nos 2019
85 Sand pouring ctylinder apparatus,100mm 3 Set 2019
86 Lid and Pan 30cm dia G.I 3 Set 2019
87 C.I Mould,Size 50mmX50mmX50mm 24Nos 2019
88 M.S Mould,Size 70.6mmX70.6mmX70.6mm 24 Nos 2019
89 Hygro meter 3 Nos 2019
90 Electronics Balance
Capacity 15 Kg X 1 gm 1 Nos 2019
91 Electronics Balance
Capacity 30 Kg X 5 gm 1 Nos 2019
92 Accelerated Curing Tank suitable for 12/24 cubes of
150mm/70.6mm 1 Nos 2019
93 Swelling pressure apparatus with proving ring-205 KN
,Dial gauge -0.01 X 25mm 1 Set 2019
94 Laboratory Electronics Oven 1 Nos 2019
95 Grooved MS Plate 45 cm X45 cm X25 cm 1 Nos 2019
96 Plate Bearing apparatus,as per specification 1 Nos 2019
97 Integral type Compression provinh ring 5 KN 1 Nos 2019
98 High Speed stirrer 1 Nos 2019
99 Desiccator Non Vaccum type 200 mm glass 1 Nos 2019
Executive Engineer
Quality Control Division
Bhadrak
12
LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK
SI
No
Date of
Visit
Name of
Inspecting
Authorities
Name of the
Division Name of the Work Agt. No.
Observation &
Remarks
1
20.03.201
8
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank of jamboo Baulakani
Mahakalapada chhapali
saline gherry.
01 P1
/2017-18
i) interstics should be
filled up properly with
required stone.
ii) Test of stone to be
done in Govt.
laboratory. Akhadasahi creek
irrigation project.
1417 F2/
13-14
i) Wave breakers to be
provided.
ii) Honey combs of
sluice needs
rectification.
2
19.04.201
8
Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Check Dam Mudrabeda -I
over Badapaka nallah
near village Mudrabeda in
Ghatagoan Block for the
year 2017-18.
66 P1
/2017-18
i) Use vibrator regular
interval as 0.3m depth.
ii)Adopt covering
curing by Gunny
bags/Hessian clothes.
Check Dam Kantibeda
over Hanumatia nallah
near village Penthadihi in
Harichandan Pur Block
for the year 2017-18.
17
P1/2017-
18.
i) Use vibrator regular
interval as 0.3m depth.
ii) Adopt covering
curing by Gunny
bags/Hessian clothes.
Check Dam Ganjeidhara
over Hanumatia nallah
near village Penthadihi in
Harichandan Pur Block
for the year 2017-18.
32
P1/2017-18
The work is completed
which looks
satisfactory.
Improvement of
Distribution system of
Kureijodi M.I.P under
State Plan in Harichandan
Pur Block for the year
2017-18
110
P1/2017-18
i) Use vibrator regular
interval as 0.3m depth.
ii) Adopt covering
curing by Gunny
bags/Hessian clothes.
3
20.04.201
8
Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Renovation and
Improvement to Ganda
M.I.P in Ghasipura Block
under CLSRP Scheme for
the year 2017-18.
80
P1/2017-18
i) Alignment of Lining
should be proper.
ii) Adopt covering
curing by Gunny
bags/Hessian clothes.
4
24.04.218
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Bank protection work to
scoured bank at
Mahadeidia.
124
P1/2017-18
It is instructed to
remove other stones
visible at site except
hard granite stones as
per agreement
Restoration to
Chhachinadia- Deuli-
Bajapur saline
embankment
100 P1
/2017-18
Work is in completed
stage
restoration to
parinuapada-
Parimukundapur TRE 0 to
5.20 km.
Instructed to maintain
Activity register, site
order book and QC
related register.
13
Bank protection to
scoured bank at
Mahurigaon on Bajarpur
saline embankment.
85 P1/ 18-
19
It is instructed to
remove the skinned
stones as well as
Quartz types of stone
visible at site
5
9.5.2018
Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Renovation and
Improvement to Ganda
M.I.P in Ghasipura Block
under CLSRP Scheme for
the year 2017-18.
80
P1/2017-18
i) Alignment of Lining
should be proper.
ii) Adopt covering
curing by Gunny
bags/Hessian clothes.
Check Dam Gonda-8 on
Gonda nallah near village
Nanikabahali in
Ghasipura Block for the
year 2016-17.
109
P1/2016-17
i) It is instructed to
remove the weather
skinned stones from
site.
Renovation and
Improvement to Ganda
M.I.P in Ghasipura Block
under CLSRP Scheme for
the year 2017-18(Reach-
II)
81
P1/2017-18
i) Use vibrator regular
interval as 0.3m depth.
ii)Adopt covering
curing by Gunny
bags/Hessian clothes.
6
11.7.2018
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank of Brahmani left
embankment near
Gopalpur kandia
13P1/18-19 i) Stone packing work
is in progress.
ii) No QC testing
report is available at
site.
Protection to scoured
bank on K.K right near
Tunga.
08P1/18-19 i) Stone packing work
is in progress.
Protection to scoured bank on
K.K. right near Kalanada.
96P1/17-18 It is instructed to
remove other stones
visible at site except
hard granite stones as
per agreement
Protection to K. k. right
embankment near Sana
arka and Kalanada.
Bank protection work and
construction of spur near
Sanagiri of Kharasuan
right.
14P1/18-19
26P1/18-19
It is instructed to
remove other stones
visible at site except
hard granite stones and
maintain the slope
properly as per
agreement.
i) Stone packing work
is in progress.
ii) No QC testing
report is available at
site.
7 20.7.218 Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank on jamboo
Baulakani saline
embankment on Gobri
right
16P1/18-19 i) It is instructed to
remove the skinned
stones visible at site as
per agreement.
ii) No QC testing
report is available at
site. Protection to scoured
bank of Mahakalapada
01P1/
NCB/RIDF
Packing should be
done properly and
14
chhapali saline gherry
with construction of new
saline embankment.
/17-18 interstices
Should be filled up by
small stones.
protection to scoured
bank of river Gobri in
Mahakalapadablock of
Kendrapara Dist.
54P1/
NCB/RIDF
/17-18
i) i) Stone packing
work is in progress.
ii) No QC testing
report is available at
site.
8 21.7.218 Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Slope protection to
Patasala right on Satagaon
saline embankment
93P1/2017-
18
NO Quality Control
register is available at
site during inspection.
Raising and strenghtening
of Satagaon saline
Embankment.
127P1/201
7-18
Work is in completed
stage.
Slope protection to
Patasala right
embankment.
110P1/201
7-18
Work is in completed
stage.
9 14.12.201
8
Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Field Channel at Sunguda
of Bhadrak sub division
under Salandi Left
Comman
d.
K2 158-
159/2018-
19
The work is completed
which looks
satisfactory.
Field Channel at
Sanamaitapur-III of
Bhadrak sub division
under Salandi Left
Command.
K2 137-
138/2018-
19
The work is completed
which looks
satisfactory.
Field Channel at Bari-
II(Part-III) of Bhadrak
sub division under
Salandi Left Command.
K2 111-
112/26.5.18
The work is completed
which looks
satisfactory.
Field Channel at
Barinayada of Bhadrak
sub division under
Salandi Left Command.
K2119/26.5
.2018
The work is completed
which looks
satisfactory.
Field Channel at Kutari of
Bhadrak sub division
under Salandi Left
Command.
K2 139-
140/26.5.20
18
The work is completed
which looks
satisfactory.
Field Channel at
Dianpurusottampur of
Bhadrak sub division
under Salandi Left
Command.
K2141-
142/26.5.20
18
The work is completed
which looks
satisfactory.
10 20.1218
Er.Swapna
priyadarsini
Acharya AEE
Drainage
Division,
Bhadrak
Construction of Two nos
of foot over bridge over
rebo drainage channel at
Kalyani, Kadimahara
&Breach closing at
Hatanagar
12P1/2018-
19
It is observed that 10%
of work done has been
completed. It is
instructed to replace
the coarse
agreegets(oversized) at
site being used by the
agency before
commencement of
further concrete wok
and Lafarge cement
must not be
used.Gradation test of
15
20mm down graded is
not satisfing IS 383 at
site.
11 26.12.201
8
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank of Brahmani right
near Lokanath prasad
with launching apron in
Rajnagar Block.
40/
NCB/RIDF
/P1/18-19
It is instructed to
remove the skinned
stones at site before
executing of earthwork
and the borrow earth
must be tested.
Protection to scoured
bank of river Patasala
near Junagadi
71P1/18-19
It is instructed to
remove the skinned
stones as well as
Quartz types of stone
visible at site
12 27.12.201
8
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank of Gobri left near
Badadanua of Radhia
kansara saline gherry in
Mahakalapada block.
35/
NCB/RIDF
/P1/18-19
It is instructed to
remove other stones
visible at site except
hard granite stones as
per agreement
protection to scoured
bank of Gobri left near
Olia of Orta Sahabajpur
saline gherry
Mahakalapada block.
73P1/18-19
It is instructed to
remove other stones
visible at site except
hard granite stones and
maintain the slope
properly as per
agreement. Protection to scoured
bank at Barunadiha,
Badhajhar, Panki and
Mahurigaon on river
Kharasuan.
76/
NCB/RIDF
/P1/18-19
It is instructed to
remove the skinned
stones visible at site as
per agreement
13 3.01.2019
Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Jajpur
Renovation to Kalakala
M.I.P in Badachana Block
under DPIW Scheme for
the year 2018-19.
12P1/2018-
19
It is instructed to
remove the weather
skinned stones and
some Quartz type
stones being used for
the work as well as
uproot bushes before
packing work.
Renovation to Gopal Sahu
Bandha M.I.P in
Badachana Block under
Critical grant for the year
2018-19.
16P1/2018-
19
It is instructed to
rectify the honey comb
part.
14 04.1.19
Er.Swapna
priyadarsini
Acharya AEE
Drainage
Division,
Bhadrak
Improvement to Drainage
cum creek system of
Bahupokhari creek/
Kalidaspur creek of
Andola,Balimed,Rajgharp
okhari and Birasa GPS of
Basudevpur block in
Kansabansa-mantei Doab
no-XI
08P1/2018-
19
It is observed that 10%
of work done has been
completed. It is
instructed to replace
the coarse
agreegets(oversized)
and fine agreegate at
site being used by the
agency before
commencement of
further concrete
wok.Gradation test of
16
20mm down graded
and gradation of FA
are not satisfying IS
383 at site.The
moisture content found
2% at site.an dthe
compaction is 78.4%
15 05.01.201
8
Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Field Channel at
Susiladeipur-2 of Bhadrak
sub division under
Salandi Left Command.
K2 103-
104/26.5.18
The work is completed
which looks
satisfactory.
Field Channel at Erada-3
of Bhadrak sub division
under Salandi Left
Command.
K2
56/17.5.18
The work is completed
which looks
satisfactory.
Field Channel at
Dianpurusottampur of
Bhadrak sub division
under Salandi Left
Command.
K260-
61/17.5.18
The work is completed
which looks
satisfactory.
16 11.01.201
9
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Improvement to storm
water Drainage Channel (
Concrete Drain in
Bhadrak Muncipality in
Salandi-Baitarani Doab
No-XIII)
02P1/2018-
19
It is observed that 25%
of work done has been
completed.It is
instructed to replace
the coarse
agreegets(oversized)an
d fine aggregate at site
being used by the
agency before
commencement of
further concrete work.
Gradation test of
20mm down graded
and fine aggregate are
not satisfing IS 383 at
site.
17 16.1.2019 Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Improvement to storm
water Drainage Channel
(Concrete Drain in
bhadrak Muncipality in
Salandi –baitarani Doab
No- XIII)
02P1/2018-
19
It is observed that 30%
of work done has been
completed. It is
instructed to replace
the coarse
agreegets(oversized)an
d fine aggregate at site
being used by the
agency before
commencement of
further concrete work.
Gradation test of
20mm down graded
and fine aggregate are
not satisfing IS 383 at
site.
17
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank of Gobri left near
Badadanua of Radhia
kansara saline gherry in
Mahakalapada block.
35/
NCB/RIDF
/P1/18-19
It is instructed to remove the
weather skinned stones.
protection to scoured
bank of Gobri left near
Olia of Orta Sahabajpur
saline gherry
Mahakalapada block.
73P1/18-19 interstices to be filled
up by small stones
with proper
hammering as per
Agreement
18 18.1.2019
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Improvement to storm
water Drainage Channel
(Concrete Drain in
bhadrak Muncipality in
Salandi –baitarani Doab
No- XIII)
02P1/2018-
19
Accompanied with Er
Satrughana Das,
Consultant Advisor.
He advised to test Fine
and Coarse aggregates
stacked at site later
and again instructed to
remove flacky
aggregates.
19 21.1.2019
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Improvement to storm
water Drainage Channel
(Concrete Drain in
bhadrak Muncipality in
Salandi –baitarani Doab
No- XIII)
02P1/2018-
19
It is observed that 30%
of work done has been
completed.. Gradation
test of 20mm down
graded and fine
aggregate are
satisfiing IS 383 at
site.
Sri Sumanta
Kumar
Madhei,AEE
Jajpur
Irrigation
Division,
Jajpur
296
P1(E.E) of
2015-16
It is instructed to
remove the weather
skinned stones and
interstices to be filled
up by small stones
with proper
hammering as per
Agreement.
Protection to Kachila left
Embankment from
Athagharia to Pangata
under NABARD
Assistance (RIDF-XX).
Renovation to Baikunthi
Sluice on Baitarani left
for the year 2018-19.
102
P1(E.E) of
2017-18
The work is completed
which looks
satisfactory.
Renovation to Sendhapur
Sluice on Baitarani left
for the year 2018-19.
26 P1(E.E)
of 2017-18
The work is completed
which looks
satisfactory.
18
22.01.201
8
Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Protection to Scoured
bank on OAE No-12
(abcd) B on Baitarani left
near village Dasandhikula
to Dasandhikula Ghery
under NABARD
Assistance (RIDF-XX).
200
P1(E.E) of
2015-16
It is instructed to
remove the weather
skinned stones and
interstices to be filled
up by small stones
with proper
hammering as per
Agreement.
Protection to Scoured
bank on Baitarani left
from Anandapur to
Gaurangapur Escape
under NABARD
Assistance (RIDF-XX).
02 P1(E.E)
of 2016-17
The work is completed
which looks
satisfactory.
Protection to Scoured
bank on OAE No-12
(abcd) B on Baitarani left
near village Mishrapur for
the year 2018-19.
14 P1(E.E)
of 2018-19
It is instructed to
remove the weather
skinned stones and
interstices to be filled
up by small stones
with proper
hammering as per
Agreement.
Field Channel at
Sahupada-1 of Bhadrak
sub division under
Salandi Left Command.
K2 153-
154/26.5.18
The work is completed
which looks
satisfactory.
Field Channel at
Sahupada-2 of Bhadrak
sub division under
Salandi Left Command.
K2 70-
71/17.5.201
8
The work is
completed which looks
satisfactory.
Field Channel at
Balikanaof Bhadrak sub
division under Salandi
Left Command.
K2 67-
68/17.5.18
The work is completed
which looks
satisfactory.
Field Channel at Telnati
of Bhadrak sub division
under Salandi Left
Command.
K2 73-
74/17.5.18
The work is completed
which looks
satisfactory.
Field Channel at Aliha of
Bhadrak sub division
under Salandi Left
Command.
K2 34-
35/17.5.201
8
The work is completed
which looks
satisfactory.
19
Field Channel at Aptira
Sarangi of Bhadrak sub
division under Salandi
Left Command.
K2 209-
210/2.11.18
The work is completed
which looks
satisfactory.
21 25.01.201
9
Sri Sumanta
Kumar
Madhei,AEE
Jajpur
Irrigation
Division,
Jajpur
Raising,Strengthening and
Protection to leftbank of
river Baitarani from
Balighai to Dehudi
Ananadapur under
NABARD Assistance
(RIDF-XXII)
04 P1(E.E)
of 2018-19
It is instructed to
compact the earth
properly as well as
watering properly.
Renovation of Distry No-
02 of Jajpur Main Canal
under CLSRP (Working
from RD 0.00Km to
8.925Km)
03 P1(E.E)
of 2018-19
i) It is instructed to
compact the slope area
properly by watering.
ii) Adopt covering
curing on slope area
and ponding on Bed.
22 30.01.201
9
Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Field Channel at
Nimapada(AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2 417-
418/26.9.20
18
The work is 70%
completed which is
seen satisfactory.
Field Channel at
Brundabanpur (AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2408-
409/18.9.18
The work is 90%
completed which is
seen satisfactory.
Field Channel at
Solpata(AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2 422-
425/26.10.1
8
The work is 30%
completed which is
seen satisfactory.
Field Channel at
Rampur(E.O.M) of
Bhadrak sub division
under Salandi Right
Command.
K2
217/13.11.1
8
The work is 95%
completed which is
seen satisfactory.
Field Channel at
Salania(E.O.M.) of
Bhadrak sub division
under Salandi Right
Command.
K2
218/13.11.1
8
The work is 99%
completed which is
seen satisfactory.
Field Channel at
Dhoniojha(E.O.M.) of
Bhadrak sub division
under Salandi Right
Command.
K2
214/13.11.1
8
The work is 90%
completed which is
seen satisfactory.
23. 5.2.2019 Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Field Channel work at
Bati-2(part-2)(EOM) of
Bhadrak sub division
under Salandi left
Command.
K2120&12
1/26.5.2018
It is seen that concrete
work is in progress. It
is instructed to remove
flacky aggregates. The
work done is 90%
completed.
20
Drainage
Division,
Bhadrak
Improvement to link
drains of river
Kansabansa and
construction of VRB with
protection wall over
Kansabasna drainage
channel near village
Jadibanka of kabirpur of
G.P. in Simulia Block in
Kansabansa-Manteidoab
No-XI
55p1/2018-
19
It is observed that 10%
of work done has been
completed. It is seen
that piling work is in
progress. F.A
deposited at site are
seen satisfactory. CA
are not satisfactory. It
is instructed to
remove flacky coarse
aggregates.
Improvement to drainage
channels and construction
of Guard wall with stone
packing in Sabaranga GP
under Simulia
constituency of Balasore
district in kansabansa-
Mantei Doab No-XI
1P1/2018-
19
It is observed that 50%
of work done has been
completed. It is seen
that stone packing
work is in progress
and concrete work
done has been
completed completely
which was seen
satisfactory.
24. 6.2.2019 Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Bank protection work to
scoured bank at
Mahurigaon on Baitarani
69P1/18-19 i) Stone packing work
is in progress.
Protection to scoured
bank at Barunadiha,
Badhajhar, Panki and
Mahurigaon on river
Kharasuan.
76/
NCB/RIDF
/P1/18-19
i) Stone packing work
is in progress.
ii) No QC testing
report is available at
site.
Protection to scoured
bank from Dahianta to
sahira village on
Brahmani left.
106/
NCB/RIDF
/P1/18-19
i) Stone packing work
is in progress.
ii) Instructed to
remove the skinned
stones at site. Protection to scoured
bank from Sorisada to
Patrapur village on
Brahmani left.
108/
NCB/RIDF
/P1/18-19
i) Stone packing work
is in progress.
ii) Instructed to
remove the skinned
stones at site
ii) No QC testing
report is available at
site.
25
7.2.2019
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Construction of protection
wall over link drain to
Baitarani River near
village Khaparapada
&construction of FB over
Ankira DC ( Link Drain
to Baitarani River ) near
village Amritpur.
11P1/2018-
19
It is observed that 10%
of work done has been
completed. It is seen
that FA and CA are
satisfying IS:383. It is
instructed to remove
the flacky coarse
aggregate.
21
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Restoration to Satagaon
saline gherry with
construction of 5 nos
sluice.
78/
NCB/RIDF
/P1/18-19
i) Earthwork is under
progress.
ii) Instructed to
remove all kinds of
dedris from earth soil.
iii) Q.C testing report
yet not received from
Govt. laboratory.
Protection to scoured
bank on Keredagada
Alatanga S/E on river
Hansua right near
Jagannathpur, Badkote &
Koilpur.
112/
NCB/RIDF
/P1/18-19
i) The dumping work
is in progress.
ii) No QC testing
report is available at
site.
Restoration to Rajnagar
gopalpur saline
embankment Hansua left
at Rajnagar, Bijulia &
Praharajpur.
113/
NCB/RIDF
/P1/18-19
i) Raising of
embankment
earthwork is in
progress.
ii) No QC testing
report is available at
site.
iii) Compaction shuld
be done properly.
Protection to scoured
bank on Brahmani right
near Sathapada.
110/
NCB/RIDF
/P1/18-19
i) The dumping work
is in progress.
ii) The weight of used
stone should be
measured as per
agreement.
Protection to scoured
bank of Gobri left near
Chandipali of Orta
sahabajpur saline ghery in
Mahakalapada block of
Kendrapara Dist.
104/
NCB/RIDF
/P1/18-19
i) Dumping work is
under progress.
ii) Instructed to
remove the skinned
stones at site.
iii) No QC testing
report is available at
site.
Protection to scoured
bank of river Nuna near
Gopalpur.
109/
NCB/RIDF
/P1/18-19
i) The dumping work
is in progress.
ii) The packing should
be done properly by
minimizing interstices
using small stones.
iii) No QC testing
report is available at
site.
26 08.02.201
9
Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Jajpur
Renovation tof Gagarpatia
nallah with its link drain
of Jajpur District in
Brahmani-Baitarani
DOAB No -XIV.
41
P1/2017-18
Some area Small and
Quartz type stone
should be removed and
interstices filled by
small stone with
22
proper hammering.
Renovation of Belpal
nallah of Jajpur District in
Brahmani-Baitarani
DOAB No -XIV.
50
P1/2017-18
Alignment of
protection wall should
be proper and to do
proper curing on wall.
Water supply to Tail end
of 1 A 1 distributary and
Talia minor of Japur canal
system for stabilization of
lost ayacut.
27 11.02.201
9
Sri Sumanta
Kumar
Madhei,AEE
Jajpur
Irrigation
Division,
Jajpur
28 P1(E.E)
of 2018-19
It is instructed to
i) Use plate vibrator in
bed concreting.
ii) Curing should be
proper and regular
interval.
Renovation of 1 D and 1
Main Extension
distributary of Jajpur
canal system
Protection of Baitarani
Right Embankment near
Kuanrsahi
26 P1(E.E)
of 2018-19
It is instructed to
proper sectioning of
the Embankment and
proper watering and
compaction.
Protection of Baitarani
Right Embankment near
Kuanrsahi
18 P1(E.E)
of 2018-19
It is instructed to filled
the intersticesby small
stone with proper
hammering.
28 12.02.201
9
Sri Sumanta
Kumar
Madhei,AEE
Jajpur
Irrigation
Division,
Jajpur
Renovation and
Comunication facility to
Nuamahara left TRE from
RD 0.00 Km to 20.00 Km
from Nuabanka to
Gahiapal (Construction of
5 No. Sluice) under
NABARD Assistance
(RIDF-XIX).
29 P1(E.E)
of 2018-19
During visit only
foundation excavation
was under progress.
Instructed to test earth
before construction.
Restoration and
Protection to left Saline
Embankment over river
Baitarani from Bodak to
Tintarghat under
NABARD Assistance
(RIDF-XXII).
09 P1(E.E)
of 2017-18
It is instructed to
maintain the slope
properly as well as
compact the spreading
earth properly.
29 13.2.2019 Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Constuction of Sluice
cum Foot Bridge over
Sarusagar Nallah near
village Gopalpur RD
6660 MTR
50P1/2018-
19
It is observed that 60%
of work done has been
completed. It is seen
that FA gradation is
satisfying IS:383 and
CA gradation is not
satisfying IS:383.
cement is satisfying IS
norms. Slump test
report came 75mm. It
23
is instructed to remove
the flacky coarse
aggregate deposited at
site.
Construction of Check
Dam over Khandia Nallah
(Khandakosi) near Village
Goramati.
52P1/2018-
19
It is observed that 30%
of work done has
completed. It is seen
that FA gradation and
CA gradation are seen
satisfying IS:383.
cement is satisfying IS
norms. Plate vibrater is
using for PCC. No
quality control testing
report is available with
the field officer of the
concerned field
division at site.
30 14.2.2019 Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Construction of
Checkdam over DC from
Ghohadabandha to
Balichaturi Nallaa via
Satuk House
13P1/2018-
19
It is observed that 35%
of work done has been
completed. It is seen
that FA gradation and
CA gradation are
satisfying IS:383.
It is instructed to use
SAIL 16mm dia bars
instead of local brands.
It is also instructed to
remove flacky coarse
aggregates from work
site.
Construction of Check
dam over DC Kathapaka
Nallah near village
Talabandha of Saya G.P.
14P1/2018-
19
It is observed that 35%
of work done has been
completed. It is seen
that FA gradation and
CA gradation are
satisfying IS:383.
It is instructed to use
SAIL 16mm dia bars
instead of local brands.
It is also instructed to
remove flacky coarse
aggregates from work
site.
31 18.2.19 Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Field Channel at
Kargola(AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2436-
440/2.11.18
It is observed that the
work done is 80 %
completed. It is
instructed to rectify the
honey Comb found in
some places of FC
Field Channel at K2432- It is observed that the
24
Sankho(AIBP) of
Bhadrak sub division
under Salandi Right
Command.
435/2.11.18 work done is 80 %
completed. It is
instructed to rectify the
honey Comb found in
some places of FC
Field Channel at
Inchol(AIBP) of Bhadrak
Sub Division under
Salandi Right Command.
K2 460-
462/13.11.1
8
It is observed that the
work done is 15 %
completed. Earth
work Excavation work
is in progress and the
work done is seen
satisfactory
Field Channel at
Nilok(AIBP) of Bhadrak
Sub Division under
Salandi Right Command.
K2 399-
401/18.09.1
8
It is observed that the
work done is 10 %
completed. Earth
work Excavation work
is in progress and the
work done is seen
satisfactory Field Channel at
Radhanagar(EOM) of
Bhadrak sub division
under Salandi Right
Command.
K2
215/13.11.2
018
It is observed that the
work done is 80 %
completed. The work
done is seen
satisfactory.
Field Channel at Village
Kumbaria (AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2
215/26.10.2
018
It is observed that the
work done is 10 %
completed. Earth
work Excavation work
is in progress and the
work done is seen
satisfactory
Field Channel at Village
Gharapada (AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2 392-
395/18.9.20
18
It is observed that the
work done is 10 %
completed. Earth
work Excavation work
is in progress and the
work done is seen
satisfactory
Field Channel at
Khetuali(AIBP) of
Bhadrak sub division
under Salandi Right
Command.
K2 413-
416/18.9.20
18
It is observed that the
work done is 100 %
completed. It is
instructed to rectify the
honey Comb found in
some places of FC
32 19.2.19
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Improvement to storm
water Drainage Channel
(Concrete Drain in
bhadrak Muncipality in
Salandi –baitarani Doab
No- XIII)
02P1/2018-
19
It is observed that 30%
of work done has been
completed. It is
instructed to replace
the coarse
aggregates(oversized)a
nd fine aggregate at
site being used by the
agency before
commencement of
25
further concrete work.
Gradation test of
20mm down graded
CA and gradation test
of fine aggregate are
not satisfying IS 383 at
site. It is instructed to
provide minimum
clear cover of 40 mm
to the reinforcement.
Slump test report came
105mm. It is instructed
to maintain W/C ratio
as per IS codes. Improvement to Kapali
DC near village
Ansarapur, Tankuni,
Balabhadrapur,
Baburigaon and Kasimpur
in Doab no-XIII.
61P1/2017-
18
The work done is seen
not satisfactory. It is
instructed to proceed
with stone packing
work properly.
Sri Sumanta
Kumar
Madhei,AEE
Jajpur
Irrigation
Division,
Jajpur
Raising,Strengthening and
Protection to left bank of
river Baitarani from
Balighai to Dehudi
Ananadapur under
NABARD Assistance
(RIDF-XXII)
04 P1(E.E)
of 2018-19
It is instructed to
compact the earth
properly as well as
watering properly.
Repair and Restoration of
Flood protective
Embankment on Baitarani
right from Raghupur to
Mathurapur
03 P1(E.E)
of 2018-19
It is instructed to
i) Finishing of the
packing work should
be uniform.
ii) Stones other than
H.G stones should be
removed.
iii) Interstices to be
filled up by small
stones with proper
hammering as per
agreement.
Raising,Strengthening and
Protection to left flood of
river Balungapatia from
Madhiali to Dihasahi
under NABARD
Assistance (RIDF-XXII)
02 P1(E.E)
of 2018-19
It is instructed to
i) Execute the work in
layer with proper
watering and
compaction.
ii) Test the suitability
of soil being used in
work.
iii) Maintain proper
profile for the work.
26
33 20.2.2019 Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak Improvement to Drainage
cum creek system of
Bahupokhari creek/
Kalidaspur creek of
Andola,Balimed,Rajgharp
okhari and Birasa GPS of
Basudevpur block in
Kansabansa-mantei Doab
no-XI
08P1/2018-
19
It is observed that 20%
of work done has been
completed..Gradation
test of 20mm down
graded and gradation
of FA are satisfying IS
383 at site.It is
instructed to use
mobile during
shuttering to get
smooth finishing of
RCC works.
Improvement to drainage
channels and construction
of Guard wall with stone
packing in Sabaranga GP
under Simulia
constituency of Balasore
district in kansabansa-
Mantei Doab No-XI
1P1/2018-
19
It is observed that 52%
of work done has been
completed. It is seen
that stone packing
work is in progress. It
is instructed to fill up
moorum layer below
stone packing.
Construction of protection
wall over link drain to
Baitarani River near
village Khaparapada
&construction of FB over
Ankira DC ( Link Drain
to Baitarani River ) near
village Amritpur.
11P1/2018-
19
It is observed that 12%
of work done has been
completed. It is
instructed to provide
wipe hole in zig zag
manner..
34 22.2.2019 Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Jajpur
Renovation of Gadagadi
mahahra with its link
drain of Jajpur District in
Brahmani-Baitarani
DOAB No-XIV under
D.I.P.
18P1/2018-
19
It is instructed to
i) Replace the Sand
which is not coming
under
IS: 383.
ii) Curing should be
done by covering
Hessian clothes/Gunny
bags.
35 01.3.2019 Sri Sumanta
Kumar
Madhei,AEE
M.I.
Division,
Jajpur
Renovation to Right Main
Canal of Kalakala M.I.P
in Badachana Block under
State Plan .
41 P1 of
2018-19
It is instructed to
i) Maintain w/c ratio.
ii) Adopt covering
curing on wall and
ponding on Bed. Renovation to
Baitalukencha M.I.P in
Danagadi Block under
Critical Scheme.
26 P1 of
2018-19
It is instructed to
i) Maintain w/c ratio.
ii) Adopt covering
curing on wall and
ponding on Bed.
27
36
7.3.2019
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Construction of
Checkdam at RD 100m
over Simulia Jore Drain
near village Badabazar
under Chandabali Block.
35P1/2018-
19
It is observed that 20%
of work done has been
completed .It is
instructed to remove
oversized and Flacky
CA from work site. It
is instructed to use
SAIL bars for
reinforcement instead
of bars from local
brands
Construction of
Checkdam at RD 100m
over Sialapada Drain
near village
Sialapadaunder
Chandabali Block.
33P1/2018-
19
It is observed that 75%
of work done has been
completed . It is
instructed to use SAIL
bars for reinforcement
instead of bars from
local brands.
Gradation test of
20mm down graded
and gradation of FA
are satisfying IS 383 at
site. It is instructed to
use proper w/c ratio
according to code.
Construction of
Checkdam cum Sluice at
RD 100m over
Panchapada Drain near
village Panchapada
Chandabali Block.
34P1/2018-
19
It is observed that 70%
of work done has been
completed. It is
instructed to use SAIL
bars for reinforcement
instead of bars from
local brands.
Gradation test of
20mm down graded is
not satisfying IS 383 at
site. It is instructed to
replace CA deposited
at site. It is instructed
to maintain proper w/c
ratio according to IS
code. It is instructed to
provide wipe holes in
zig zag manner.
Gradation of FA is
satisfying IS:383.
28
Construction of
Checkdam cum Sluice at
RD 100m over Ghusura
Drain near village
Kuanarasara Chandabali
Block
32P1/2018-
19
It is observed that 60%
of work done has been
completed . It is
instructed to use SAIL
bars for reinforcement
instead of bars from
local brands. It is
instructed to provide
wipe holes in zig zag
manner. It is instructed
to use proper w/c ratio
according to IS
code.The gradation of
FA and CA are
satisfying IS:383.
Construction of
Checkdam cum Sluice at
RD 100m over
Badaharipur to Begunia
Jore at RD 4300m near
village Nichinta
Chandabali Block
56P1/2018-
19
It is observed that 15%
of work done has
beencompleted .
It is instructed to use
SAIL bars for
reinforcement instead
of bars from local
brands. The gradation
of FA is satisfying
IS:383. It is instructed
to use CA as per
IS:383.
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Restoration to Balarampur
saline gherry with
construction of 4 nos
drainage sluice.
77/
NCB/RIDF
/P1/18-19
Work is not started.
Only materials have
been stacked at site.
Protection to scoured
bank on Baitarani right
near Padmanabhpur.
114/
NCB/RIDF
/P1/18-19
i) The dumping nd
packing works are in
progress.
ii) The packing should
be done properly and
interstices to be
properly filled up.
iii) Materials for
testing have been sent
to Q.C. Div. cuttack
but test result yet not
received
29
Protection to scoured
bank of Brahmani right
near Jharakata with
launching apron in
Rajnagar block.
111/
NCB/RIDF
/P1/18-19
i) The dumping and
packing work are in
progress.
ii) Stones other than
H.G. stone must be
removed.
Protection to scoured
bank of Gobri left near
Chandipali of Orta
sahabajpur saline ghery in
Mahakalapada block of
Kendrapara Dist.
104/
NCB/RIDF
/P1/18-19
Work is not started,
only materials have
been stacked at site.
Protection to scoured
bank of Gobri left near
Chandipali of Orta
sahabajpur saline ghery in
Mahakalapada block of
Kendrapara Dist.
MOU NO.
01/18-19.
i) The dumping and
packing work are in
progress ii) Packing
should be done
properly.
Protection to scoured
bank of river Nuna near
Gopalpur.
109/
NCB/RIDF
/P1/18-19
i) The dumping and
packing work are in
progress ii) Packing
should be done
properly. iii) materials
for testing have been
sent to cuttack but test
result yet not received.
Iv) Stone other than
hard granite should be
removed.
37. 8.3.2019 Er.Swapna
priyadarsini
Acharya
AEE
CAD
DIVISION
NO-3,
Bhadrak
Field Channel at Kusan
Nagar of Bhadrak sub
division under Salandi
Right Command.
K2 547-
549/27.02.1
9
It is observed that the
work done is 70 % .It
is instructed to
maintain proper w/c
ratio as per IS codes.
And it is further
instructed to maintain
proper alignment as
per estimate and
drawing.
Field Channel at
Bankatira-II of Bhadrak
sub division under
Salandi Right Command.
K2 522-
524/21.02.1
9
It is observed that the
work done is 65 % .It
is instructed to
maintain proper w/c
30
ratio as per IS codes.
And it is further
instructed to maintain
proper alignment as
per estimate and
drawing.
Field Channel at
Paramanandapur of
Bhadrak sub division
under Salandi Right
Command.
K2 544-
546/27.02.1
9
It is observed that the
work done is 85 % .It
is instructed to
maintain proper w/c
ratio as per IS codes.
And it is further
instructed to remove
flaky and oversized
coarse aggregates from
work site.
38
12.3.2019
Er.Swapna
priyadarsini
Acharya
AEE
Drainage
Division,
Bhadrak
Improvement to drainage
channels and construction
of Guard wall with stone
packing in Sabaranga GP
under Simulia
constituency of Balasore
district in kansabansa-
Mantei Doab No-XI
1P1/2018-
19
It is observed that 73%
of work done has been
completed. It is
instructed to maintain
slope of stone packing
work properly as per
drawing and maintain
proper alignment of
guard wall as per
drawing and
agreement.
Improvement to
DSrainage Channels,
construction of FB and
Guard wall with stone
packing in Kanchpada
Andheri,
Shyamasundarpur,
Khirkona,Jamojhadi and
Bati GPs of Simulia
Block in Kansabannsa-
Mantei Doab No-XI
4p1/2017-
18
It is observed that 80%
of work done has
completed. It is
instructed to use SAIL
bars for reinforcement
instead of bars from
local brands. It is
instructed to use
proper w/c ratio
according to IS
code. It is instructed to
use FA and CA as per
IS:383.
Improvement to link
drains of river
Kansabansa and
construction of VRB with
protection wall over
Kansabasna drainage
channel near village
Jadibanka of kabirpur of
G.P. in Simulia Block in
Kansabansa-Manteidoab
No-XI
55p1/2018-
19
It is observed that 27%
of work done has
completed. It is
instructed to use CA
as per IS:383 and
reinforcement rod as
per agreement. It is
also instructed to use
mobile during centring
and shuttering.
31
39
12.03.201
9
Sri Sumanta
Ku. Madhei
(AEE)
Jajpur
Irrigation
Division,
Jajpur
Renovation of Distry No-
02 of Jajpur Main Canal
under CLSRP (Working
from RD 17.500 Km to
24.180 Km)
23 P1(E.E)
of 2018-19
It is instructed to
i) Curing the Bed part
by ponding and slope
part by covering
Hessian clothes/Gunny
bags.
ii) Weep holes should
be provided at regular
interval.
Improvement to Right
side Flood Embankment
of river Kharasua fron
village Banilo to Mallipur
under NABARD
Assistance (RIDF-XXIV).
33 P1(E.E)
of 2018-19
It is instructed to
i) Execute the work in
layer with proper
watering and
compaction.
ii) Test the suitability
of soil being used in
work.
iii) Maintain proper
profile for the work.
Repair and Restoration of
Flood protective
Embankment on Baitarani
right from Raghupur to
Mathurapur
03 P1(E.E)
of 2018-19
It is instructed to
i) Finishing of the
packing work should
be uniform.
ii) Stones other than
H.G stones should be
removed.
iii) Interstices to be
filled up by small
stones with proper
hammering as per
agreement.
39
15.3.2019
Sri Sumanta
Kumar
Madhei,AEE
Jajpur
Irrigation
Division,
Jajpur
Renovation of Distry No-
4 of HLC Range -III for
the year 2018-19.
25 P1(E.E)
of 2018-19
The work is completed
which looks
satisfactory.
Restoration and
Protection to Scoured
bank on Genguti right
from Dehudi Anandapur
to Nandipur under
NABARD Assistance
(RIDF-XXIV).
31 P1(E.E)
of 2018-19
It is instructed to
remove debrishes and
roots from the work
sites.
32
40 19.03.201
9
Sri Prasanna
Kumar
Dash,AEE
Aul
Embankment
Division, Aul
Protection to scoured
bank on Keredagada
Alatanga S/E on river
Hansua right near
Jagannathpur, Badkote &
Koilpur.
112/
NCB/RIDF
/P1/18-19
i) The dumping work
is in progress.
ii) No quality control
testing report is at site
during inspection.
Restoration to Rajnagar
gopalpur saline
embankment Hansua left
at Rajnagar, Bijulia &
Praharajpur.
113/
NCB/RIDF
/P1/18-19
i) The dumping and
launching work are in
progress.
ii) Small stones should
be removed and
surface packing should
be done properly and
provide wave baker.
iii) The edge of slope
should be in line.
Bank protection to
scoured bank of
kharasuan right near
Rathsahi.
126P1/18-
19
i) It is instructed to
remove quartz types of
stone other than H.G.
stone.
ii) Interstices should
be filled up and
hammer properly.
Bank protection of
kharasuan right near
Madhuban Harijan sahi.
130P1/18-
19
i) Work is not started
on the date of
inspection.
ii) Some amount of
stone sample have
been stacked. Protection to scoured
bank on K.K. right near
Bhuinpur Balisahi.
82P1/18-19 i) Berm of the
embankment must be
done properly as per
approved drawing.
33
LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES
(HIGHER AUTHORITIES/SQM)
Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK
SI
No
Date of
Visit
Name of
Inspecting
Authorities
Name of
the
Division
Name of the Work Agt. No.
Observation
&
Remarks
1 26.11.20
18
To
27.11.20
18
Er.
Birendra
Kumar
Ray(SQM)
Aul
Embankm
ent
Division,
Aul
Protection to
scoured bank of
Jamboo Baulakani
Mahakalapada
chhapali saline
gherry with
construction of
new saline
embankment i)
Badatubi to
Nipania (12 km)
ii) Bagagahana to
Tarapadaghata(13
km) iii) Fishery jet
to Alekhanahakani
(1.1 km) iv)
Kandarapatia to
sunity (4 km) v)
Paschimakhanda
saline gherry.
01NCB/RID
F/P1/2017-18
i) No site laboratory
is established.
ii) As large quantity
of stones used in site,
why only 3 samples
have been tested
iii) Why borrow area
soil used in
embankment has not
benn tested.
iv) Quality control
testing reports is not
available at site.
Protection to
scoured bank on
Gobindpur hadua
madhuban samal
sahi to sanagiri,
construction and
restoration of bed
bars and one no.
of control slice at
Maharakul.
30NCB/RID
F/P1/2017-18
2 29.12.20
18
Er.
Surendra
Kumar
Sahu (CE)
Aul
Embankm
ent
Division,
Aul
Protection to sea
side slope of
retard
embankment of
rajnagar gopalpur
saline
embankment from
Geo-tube near
Petha.
i) The launching &
dumping work is in
progress.
ii) Embankment shall
be formed
conforming to clause
6.6.1 and 6.6.2 of IS
code code
iii) The agreement of
all work should be
available to the EE,
QC division for
necessary correction
before execution of
agreement.
Protection to
scoured bank of
river Brahmani
right near
Lokanathprasad
with launching
apron in Rajnagar
block.
40NCB/RID
F/P1/2018-19
Protection to
scoured bank on
Brahmani left near
13P1/2018-
19
34
Gopalpur
Protection to
scoured bank near
village
Jagannathpur.
31NCB/RID
F/P1/2018-19
3
09.01.20
19
Sri Khirod
Kumar
Mohanty,
S.Q.M
M.I.Divisi
on,
Jajpur
Renovation to
Kalakala M.I.P in
Badachana Block
under DPIW
scheme for the
year 2018-19.
Renovation to
Gopal Sahu
Bandha M.I.P in
Badachana Block
under Critical
grant for the year
2018-19.
Renovation to
Dholapathar M.I.P
in Sukinda Block
under State Plan
Scheme.
Renovation to
Patapur M.I.P in
Sukinda Block
under DMF grant
for the year 2018-
19
12P1/
2018-19
16 P1/
2018-19
32 P1/
2018-19
118 P1/
2018-19
On visual
observation and from
QC reports concrete
and U/S rip rap
packing seems good.
It is instructed to
remove as stone
packing is depressed.
The said work needs
more inspection as
work for this season
has just started.
4 15.01.20
19 to
16.01.20
19
Er. S.S.
Bhagat(SQ
M)
Aul
Embankm
ent
Division,
Aul
Bank protection
work and
construction of
spurs near sanagiri
to kharasuan right.
26P1/18-19
Bank protection to
scoured bank of
river Kani right
near village
kusumi Shiva
temple.
65P1/18-19
Protection to
scoured bank of
Brahmani right
near
Lokanathprasad
with launching
aprons in rajnagar
40NCB/RID
F/P1/2018-19
35
block
Protection to
scoured bank
Gobri near village
Badadanua of
Radhia kansara
saline gherry in
Mahakalapada
block.
35NCB/RID
F/P1/2018-19
Protection to scoured
bank of Gobri left
near village Olia of Orta sahabajpur
saline gherry in
Mahakalapada block
73P1/2018-
19
5
19.02.20
19
Er.
K.C.Bali,
S.Q.M
Drainage
Division,
Bhadrak
02P1/
2018-19
I)Form work should
be leak proof and
properly placed.
II) Proper blending
of 20mm and 10mm
aggregates should be
done as per
specification as it
does not satisfy the
gradation test.
8 23.02.20
19
Sri K.K.
Mohanty,
S.Q.M
Drainage
Division,
Jajpur
Renovation of
Chhota Genguti
Drainage channel
and its link drain.
33 P1/
2017-18
Renovation of
Matagunjar
Drainage channel
and its link drains
in Jajpur District
under DOAB No -
IV.
17 P1/
2018-19
36
Renovation of
Gadagadi Mahara
with its link drain
of Jajpur District
in Brahmani-
Baitarani DOAB
No-IV under
D.I.P.
18 P1/
2018-19
9.
26.03.20
19
Er.
H.K.Mishra
,
Director, R
&QC,BBS
R
Drainage
Division,
Bhadrak
Improvement to
storm water
Drainage Channel
( Concrete Drain
in Bhadrak
Muncipality in
Salandi-Baitarani
Doab No-XIII)
02P1/2018-
19
I) It is noticed that
there is no agreement
of curing of concrete
which leads to satisfy
lower strength of
concrete as required.
II) The
reinforcement by
using Sritist steel has
not been tested by
any QC laboratory .
III) As learnt by QC
staff that W/C ratio
is not being
maintained
IV) Approximately
1100 cum of
concrete has been
executed without
any specimen cube
tested by the Q.C.
The site incharge is
instructed to intimate
E.E., QC to collect
sample cube for
getting 7/28 day
strength of concrete.
V) Centring and
shuttering should be
rigid and of approved
quantity.
Photo Gallery (Inspected by Quality Control Officers)
37
Name of the work-Field Channel at Erada-3 of Bhadrak sub division under Salandi Left Command.
Visited the work site of CAD Division no-3 by AEE, QCD along with EE, QCD,Bhadrak and LA, QCD, Bhadrak in
presence of AEE and JE of Concerned field sub division i.e.Bhadrak CAD Sub-division, Bhadrak
Name of the work-Improvement to Kapali DC near village Ansarapur, Tankuni, Balabhadrapur, Baburigaon and
Kasimpur in Doab no-XIII.Visited the work site of Drainage Division ,Bhadrak by Er. Satrughana Das, Advisior of
DOWR, Odisha along with EE, AEEs and LA, QCD, Bhadrak in presence of SE, EE ,AEEs and JEs of Concerned
field Division.
38
Name of the work-Construction of Check Dam over Khandia Nallah (Khandakosi) near Village Goramati..Visited
the work site of Drainage Division, Bhadrak by AEE, QCD along with EE, QCD,Bhadrak in presence of JE of
Concerned field sub division i.eDrainage Sub-division no-3, Bhadrak
Name of the work- Improvement to Drainage cum creek system of Bahupokhari creek/ Kalidaspur creek of
Andola,Balimed,Rajgharpokhari and Birasa GPS of Basudevpur block in Kansabansa-mantei Doab no-XI .Visited
the work site of Drainage Division, Bhadrak by Er. K.C.Bali ,SQM, along with EE, AEE and LA of QCD,Bhadrak
in presence of EE, AEE and JE of Concerned field sub division i.eDrainage Sub-division no-4, Markona
39
Name of the Work: -Raising,Strengthening and Protection to leftbank of river Baitarani from Balighai to Dehudi
Ananadapur under NABARD Assistance (RIDF-XXII)along with EE, AEE and LA of QCD, Bhadrak in presence
of AEE and JE of Concerned field sub division .
Name of the Work:-Renovation of Distry No-02 of Jajpur Main Canal under CLSRP (Working from RD 0.00Km to
8.925Km)along with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of Concerned field sub-
division .
40
Name of the Work:-Water supply to Tail end of 1 A 1 distributary and Talia minor of Japur canal system for
stabilization of lost ayacut along with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of
Concerned field sub division .
Name of the Work:-Protection of Baitarani Right Embankment near Kuanrsahialong with EE, AEE and LA of
QCD, Bhadrak in presence of AEE and JE of Concerned field sub division .
41
Name of the Work:-Repair and Restoration of Flood protective Embankment on Baitarani right from Raghupur to
Mathurapuralong with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of Concerned field sub
division .
Name of the Work:-Repair and Restoration of Flood protective Embankment on Baitarani right from Raghupur to
Mathurapuralong with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of Concerned field sub
division .
42
Name of the Work:-Renovation of Chhota Genguti Drainage channel and its link drain Inspected byEr. Khirod
Kumar Mohanty ,SQM, along with EE, AEE and LA of QCD,Bhadrak in presence of EE, AEE and JE of
Concerned field sub division i.eDrainage Sub-division no-2, Chandikhol
Name of the Work:-Renovation of Gadagadi Mahara with its link drain of Jajpur District in Brahmani-Baitarani
DOAB No-IV under D.I.P Inspected by Er. K.K Mohanty ,SQM, along with EE, AEE and LA of QCD, Bhadrak in
presence of EE, AEE and JE of Concerned field sub division i.eDrainage Sub-division no-3, Binjharpur.
43
Name of Work: Restoration to Satagaon saline gherry with construction of 5 nos sluice along with
Executive Engineer, QC Division, Bhadrak.
Name of Work: Protection to scoured bank of river Nuna near Gopalpur. in Mahakalapada block alongwith Executive Engineer, QC Division, Bhadrak.
44
Name of Work: Protection to scoured bank at Barunadiha, Badhajhar, Panki and Mahurigaon on river Kharasuan.left
along with Executive Engineer, QC Division, Bhadrak.
Name of Work: protection to scoured bank from Sorisada to Patrapur village on Brahmani left along with
Executive Engineer, QC Division, Bhadrak.