GLENN SPRINGS HOLDINGS, INC. 3 7 5 Armand Hammer Blvd., Pot ts town, PA 19464
%
Dave Madeira Facility Manager
Telephone (610) 327-4174 Facsimile (610) 327-9043
SDMS DoclD
November 9,2010
VIA OVERNIGHT COURIER
Mr. Tim Gallagher USEPA Region III Mail CaU 3HS21 1650 Arch Street Philadelphia, Pemisylvania 19103-2029
Re: Progress Report No. 182 - October 2010 Occidental Chemical Corporation Site Lower Pottsgrove Township - Montgomery County, Pennsylvania EPA Unilateral Order No. III-94-26-DC Administrative Settlement Agreement and Order on Consent CERC-03-2005-0090DC
Dear Mr. Gallagher:
This progress report is provided in accordance with Section XIII, A of the Administrative Order for the Remedial Design/Remedial Action and the Administrative Settlement Agreement and Order on Consent for Occidental Chemical Corporation's (OxyChem's) Pottstown facility.
1.0 PROJECT SCHEDULE
Table 1 presents the schedule and percent completion of the current remedial activities.
2.0 ACTIVITIES COMPLETED
2.1 GROUNDWATER:
i) The total and average monthly flows from the individual recovery weUs are
summarized monthly for 2010 in Table 2. In October 2010, the average groundwater
pumping rate was approximately 211 gpm.
ii) RW-8, RW-8A, and RW-C were down on October 4 due to a minor computer
hardware problem that has since been resolved. The pump in RW-A was pulled and
cleaned on October 19 to address fouling that was adversely affecting capacity and
was returned to service within several hours.
iii) The mass removal of contaminants of concern for the Groundwater Treatment
System (GWTS) during October is presented in Table 3.
iv) The recovery wells were sampled on October 12, 2010. The analytical results for the
recovery wells samples during October are presented in Table 4.
^
2137410
An affiliate of Occidental Chemical Corporation
AR300311
v) Attachment A presents groundwater contour maps for groundwater level
measurements collected during October 2010 from all bedrock wells at the site. Wells
used in the contouring for each map are noted as blue dots.
vi) The Discharge Monitoring Report (DMR) for the Groundwater Treatment System
(GWTS) (Outfall 005 in Permit #0010944) for October is presented in Attachment B.
The sample results for volatile organic compounds (VOCs) for Outfall 005 were all
within the required limits.
3.0 PLANNED ACTIVITIES
3.1 GROUNDWATER:
i) Work continues on an upgrade to the ground water treatmeiit control system.
Completion is plaiuied for early November.
3.2 COMMUNITY RELATIONS:
i) Upon request, GSH will cooperate with the EPA in providing information regarding
this project to the public.
4.0 OTHER ACTIVITIES
i) The voluntary pilot SVE system was restarted on October 19. Operations for the year
wiU continue as long as favorable weather conditions exist.
If you have any questions, please do not hesitate to caU.
Sincerely,
David Madwra Facility Manager
l.^y^jP^^t^jf^/X\ -^j^«^fH.'^-/-^-0'' ^ i tifv under penalty of law that this document and all attachments j ^ e prepared under my direction or supervision in accordance with a system designed to assure that qualified persormel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directiy responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisoimient for knowing violations.
Attachment
cc: Thomas Sheehan, PADEP Ralph Boedeker, Tebra Tech NUS John Garges, CRA George Luxbacher, GSH Richard Passmore, GSH
AR300312
TABLE 1 - PERCENT COMPLETE OF RD/RA SCHEDULED ACTIVITIES PROGRESS REPORT NO. 182 - OCTOBER 2010
RD/RA Activity Percent
Complete
100
100
100
100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100
100
100 100
Expected Start
Monthly
—
—
—
—
— — — — — — — — — — — —
—
—
—
—
Expected Completion
—
—
—
—
— — — — — —
— — — — — —
—
—
—
—
• Actual Completion
10th of month
Mar. 27, 2007
Sept. 2007
Dec. 2007
Dec. 20, 2007 June 25, 2008
July 28, 2008 Oct. 2, 2008 Oct. 21, 2008 Oct. 2, 2008
Oct. 29, 2008 Jan. 2008
Feb. 19, 2009 Apr. 2, 2009
May 2009 June 8, 2009 July 30, 2009
Nov. 2009 Dec. 2009 Feb. 2010
July 1,2010
July 2010 August 2010
PROGRESS REPORT GROUNDWATER EPA Approval of Recovery Well (RW) Optimization Work Plan Revise O&M Manual to Add Post-Stripper Liquid Phase Carbon Treatment and Discharge Implement Step 1A of RW Optimization (Shutdown RW-04 & reduce RW-06 flow rate by 50%) Submittal of Step 1A RW Optimization Report EPA comments regarding the Step 1A RW Optimization Report Response to EPA comments EPA follow-up comments on the Step 1A Report Response to EPA comments EPA Approval to commence Step 1B of RW Optimization Implement SVE System for 2008 Implement Step IB of RW Optimization (Shutdown RW-06) RW Optimization and PMP Groundwater Sampling Event Submittal of Step 1B RW Optimization Report RW Optirnization and PMP Groundwater Sampling Event EPA-approval for Step 2 of RW Optimization Response to EPA comments RW Optimization and PMP Groundwater Sampling Event Implement SVE System for 2009 Implement Step 2A of RW Optimization (Reduce RW-05 flow rate by 50%) Implement Step 2B of RW Optimization (Complete shutdown of RW-05) Submittal of Step 2A Interim Status Report Conduct 3"* Quarter PMP groundwater sampling
EARTHEN LAGOONS AOC forPFS finalized 100 EPA Approval of Final FFS Work Plan 100 Identification of Candidate Technologies Memorandum 100 Receipt of Approval for Disposal of PVC Material at Facility 100
in Quebec (USEPA and Ministry of Environment Canada) DraftFFS 100 Response to EPA Comments on FFS and Final FFS Report 100 Submission of Remedial Design/Remedial Action Work Plan 100 Response to EPA cominents and Revised FFS Report 100 EPA Review and Approval of FFS 100 EPA Review and Approval of RD/RA Work Plan 100 Remediation 100 Receive Closure Approval from EPA 100 Final Inspection 100 Post-Construction Report 100 EPA cornments on Post-Construction Report 100 Response to EPA comments on Post-Construction Report IOO EPA Approval of Post-Construction Report 100 EPA Final Inspection of Earthen Lagoons 100
Oct. 7, 2005 Aug. 11,2006 Dec 21, 2006 Mar. 6, 2007
Mar. 30, 2007 May 25, 2007 Nov. 6, 2007 Feb. 20, 2008
Mar. 2008 June 2008
Sept. 26, 2008 Sept. 26, 2008 Nov. 24, 2008 Feb. 13,2009 Mar. 5, 2009
April 21,2009 May 19, 2009 June 19,2009
AR300313
TABLE 2 AVERAGE GROUNDWATER PUIVIPING RATES
PROGRESS REPORT 182 - OCTOBER 2010
Recovery Wells
Zone A
RW-A
RW-B
RW-C
RW-4
RW-5
RW-8A
Subtotal, Zone A
Recovery Wells
Zone B
RW-8
RW-9A
RW-10A
Subtotal, Zone B
Recovery Wells
ZoneC
RW-6
RW-g.
Subtotal, Zone C
Total Recoverv Wells
Plant Production Wells
RW-1
RW-1R
Total Production Wells
Recoverv & Production Wells
January-10
Total Gallons (X 1,000)
251
264
494
880
1,767
281
3,937
1,112
830
2,170
4,112
13
661
674
8,722
--
.
8,722
Average (gpm)
6
6
11
20
40
6
88
25
19
49
92
0
15
15
195
0
0
0
195
February-IO
Total Gallons (X 1,000)
159.426
569.771
352.303
1,167.340
1,554.209
260.719
4,064
947.436
670.848
1,820.500
3,439
10.708
583.735
594.443
8,097
--
.
8,097
Average (gpm)
4
14
9
29
39
6
101
23
17
45
85
0
14
15
201
0
0
0
201
March-10
Total Gallons (X 1,000)
294
762
• 697
2,467
1,699
126
6,046
1,085
907
2,063
4,055
15
637
653
10,754
--
.
10,754
Average (gpm)
7
17
16
55
38
3
135
24
20
46
91
0
14
15
241
0
0
0
241
April-10
Total Gallons (X 1,000)
297
646
530
2,460
1,640
223
5,797
1,046
830
1,963
3,840
9
621
630
10,267
- •
-
.
10,267
Average (gpm)
7
15
12
57
38
5
134
24
19
45
89
0
14
15
238
0
0
0
238
May-10
Total Gallons (x 1,000)
175
525
419
2,530
1,742
264
5,656
935
721
2,125
3,781
3
540
544
9,980
--
.
9,980
Average (gpm)
4
12
9
57
39
6
127
21
16
48
85
0
12
12
224
0
0
0
224
June-10 1
Total Gallons (X 1,000)
132
470
379
2,388
1,713
280
5,363
1,050
732
2,066
3,848
5
642
646
9,858
--
.
9,858
Average (gpm)
3
11
9
55
40
6
124
24
17
48
89
0
15
15
228
0
0
0
228
9904-05-PRGRPT-182-Table 2 page 1 of 2 AR300314
TABLE 2 AVERAGE GROUNDWATER PUMPING RATES
PROGRESS REPORT 182 - OCTOBER 2010
Recovery Wells
Zone A
RW-A
KW-B
RW-C
RW-4
RW-5
RW-8A
Subtotal, Zone A
Recoverv Wells
Zone B
RW-8
RW-9A
RW-lOA
Subtotal, Zone B
Recoverv Wells
ZoneC
RW-6
RW-9
Subtotal, Zone C
Tofa( Recovery Wells
Plant Production Wells
RW-1
RW-1R
Total Production Wells
Recoverv & Production Wells
July-10
Total Gallons (X 1,000)
210
555
437
2,655
6
304
4,167
1,080
745
' 2,125
3,950
9
647
657
8,773
--.
.
8,773
Average (gpm)
5
12
10
59
0
7
93
24
17
48
88
0
15
15
197
0
0
0
. 197
August-10
Total Gallons (X 1,000)
250
523
410
2,636
2
308
4,128
1,098
730
2,062
3,890
6
659
665
8,683
.
8,683
Average (gpm)
6
12
9
59
0
7
92
25
16
46
87
0
15
15
195
0
0
0
195
September-10
Total Gallons (X 1,000)
168
468
373
2,463
5
311
3,788
1,326
693
1,922
3,942
5
616
621
8,351
--
.
8,351
Average (gpm)
4
11
9
57
0
7
88
31
16
44
91
0
14
14
193
0
0
0
193
October-10
Total Gallons (X 1,000)
302
770
541
2,636
10
261
4,520
1,166
953
2,122
4,241
8
660
668
9,429
. -
,
9,429
Average (gpm)
7
17
12
59
0
6
101
26
21
48
95
0
15
15
211
0
0
0
211
November-10
Total Gallons (X 1,000)
.
.
.
.
. -
.
0
Average (gpm)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
December-10 |
Total Gallons (X 1,000)
.
.
-
.
. -
.
0
Average (gpm)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9904-05-PRGRPT-182-Table 2 page 2 of 2 AR300315
TABLE 3 RECOVERY WELL PUMPING RATES AND COC MASS RECOVERY
OCTOBER 2010 Occidental Chemical Corporation
Pottstown, Pennsylvania
Recovery Well
Volume Pumped
(thousand gallons)
Average Total COC* Cone.
(mg/L)
COC Mass Removed
(lbs) RW-A RW-B RW-C RW-4 RW-5 RW-6 RW-8
RW-8A RW-9
RW-9A RW-lOA
302 770 541
2,636 10 8
1,166 261 660 953
2,122
5.987 1.366 0.024 0.004 0.003 0.003 0.011 0.003 0.003 0.029 0.010
15.098 8.775 0.109 0.077 0.000 0.000 0.103 0.007 0.019 0.231 0.168
Total 9,429 24.59
c
Q
• a
> o E (U cc in O O O
CC 20
18
^ 16
i 14 o
12
10
6 -
2 -
cc
o
oc i cc cc oc cc
< oo
DC CC
<
cc
< o
DC
* COCs include: trans-l,2-DCE; ethylbenzene; styrene; TCE; vinyl chloride; and cis 1,2-DCE. Concentrations of COCs that were non-detects were assumed to be one-half of the detection Umit.
9904-05-PRGRPT-181 -table 4
AR300316
TABLE 4 Page 1 of 1
ANALYTICAL RESULTS SUMMARY MONTHLY RECOVERY WELLS
GLENN SPRINGS HOLDINGS, INC. POTTSTOWN
OCTOBER 2010
Sample Location:
Sample ID:
Sample Date:
Parameters
Volatile Organic Compounds ds-l,2-Dichloroethene
Ethylbenzene Styrene
Tetrachloroethene
trans-l,2-Dichloroethene Trichloroethene
Vinyl chloride
Notes: J - Estimated value.
Units
ug/L
ug /L ug /L
ug /L
ug/L ug /L
ug /L
Maximum Contaminant
Level
70
700 100
5
100 5
2
U - Analyte was analyzed but not detected. Boxed results exceed applicable MCL.
RW-4
GW-9904-101210-
RW4
10/12/2010
0.63]
l.OU l.OU
6.8
l.OU 0.88 J
l.OU
RW-5
GW-9904-101210-
RW5 10/12/1010
l.OU
1.0 u 1.0 u
l.OU
l.OU 0.61 J
l.OU
RW-6
GW-9904-101210-
RW6
l(yi2/2010
l.OU
l.OU l.OU
l.OU
l.OU l.OU
l.OU
RW-8
GW-9904-101210-
RW8 10/12/1010
5.8
1.0 U l.OU
l.OU
0.36 J 3.0
0.43 J
RW-SA
GW-9904-101210-RW8A
10/12/2010
0.48 J
l.OU l.OU
l.OU
l.OU 0.74 J
l.OU
RW-9
GW-9904. 101210-
RW9
lO/12/lOlO
0.87]
l.OU 1.0 U
1.0 U
1.0 U l.OU
l.OU
RW-9A
GW-9904-101210-RW9A
10/12/2010
16.7
l.OU l.OU
l.OU
l.OU 10.2
0.61 J
RW-lOA
GW-9904. 101210-RWIOA
lO/12/lOlO
4.1
l.OU l.OU
1.0 U
l.OU 3.4
l.OU
RW-A
GW-9904-101210-RWA
10/12/2010
3580
4.6] 10 U
10 U
12.8 2380
10 U
RW-B
GW-9904-101210-
RWB
10/12/2010
139
385 718
l.OU
.0.65] 123
0.69 J
RW-C
GW-9904-101210-RWC
10/12/2010
11.3
l.OU l.OU
l.OU
0.36] 11.1
l.OU
9904-05-PRGRPT-182-Table 4 AR300317
ATTACHMENT A
GROUNDWATER CONTOUR MAPS OCTOBER 2010
AR300318
15 gpm.
46 gpm
106.62
82.08
Recovery well in RW-06 pumped interval and daily average pumping rate (red >MCL, blue <=MCL)
Recovery well not in RW-06 pumped interval and daily average pumping rate (not color coded)
Monitoring well in RW-06 pumped interval and groundwater elevation (red >MCL, blue <=MCL)
Monitoring well not in RW-06 pumped interval and groundwater elevation (not color coded)
RW-06 Pumped Interval Subcrop
Groundwater Elevation Contour (ft msl)
Notes: • River elevations at subcrops are estimated based
on an approximate river gradient. • Analytical data average of 2010 sampling events.
River -110.5
O X Y Glenn Springs Holdings
figure A. 1
POTENTIOMETRIC SURFACE FORTHE RW-06 PUMPED INTERVAL: 10/22/2010 PROGRESS REPORT
GSH, Pottstown, Pennsylvania
AR300319
48 gpmd
4.4 gpm
107.66
82.08
Recovery well in RW-08 pumped interval and daily average pumping rate (red >MCL, blue <=MCL)
Recovery well not in RW-08 pumped interval and daily average pumping rate (not color coded)
Monitoring well in RW-08 pumped interval and groundwater elevation (red >MCL, blue <=MCL)
Monitoring well not in RW-08 pumped interval and groundwater elevation (not color coded)
RW-08 pumped interval subcrop area
Groundwater Elevation Contour (ft msl)
Notes: • River elevations at subcrops are estimated based
on an approximate river gradient. • Analytical data average of 2010 sampling events.
River -110.3
O X Y Glenn Springs Holdings
figure A.2
POTENTIOMETRIC SURFACE FORTHE RW-08 PUMPED INTERVAL: 10/22/2010 PROGRESS REPORT
GSH, Pottstown, Pennsylvania
AR300320
12 gpmg
48 gpm
82.08
116.09
River -110.2
Recovery well in RW-ABC pumped interval and daily average pumping rate (red >MCL, blue <=MCL)
Recovery well not in RW-ABC pumped interval and daily average pumping rate (not color coded)
Monitoring well in RW-ABC pumped interval and groundwater elevation (red >MCL, blue <=MCL)
Monitoring well not in RW-ABC pumped interval and groundwater elevation (not color coded)
RW-ABC Pumped Interval Subcrop
Groundwater Elevation Contour (ft msl)
Notes: • River elevations at subcrops are estimated based on an
approximate river gradient. • Analytical data average of 2010 sampling events.
O X Y Glenn Springs Holdings
figure A.3
POTENTIOMETRIC SURFACE FORTHE RW-ABC PUMPED INTERVAL: 10/22/2010 PROGRESS REPORT
GSH, Pottstown, Pennsylvania
AR300321
ATTACHMENT B
DISCHARGE MONITORING REPORTS OCTOBER 2010
AR300322
PERMITTEE NAME ADDRESS (include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FacUity Name / Location if different) DISCHARGE MONITORING REPORT (DMR)
PRIMARY FAOLITY: OCCIDENTAL CHEMICAL GROUNDWATER REMEDUTION STTE
CLIENT: GLENN SPRINGS HOLDINGS, INC.
ADDRESS: 5005 LBJ FREEWAY, STE 13S0
DALLAS, TX 75244
STTE ADDRESS; 375 ARMAND HAMMXR BOULEVARD
MUNICIPALITY: LOWER POTTSGROVE TOWNSHIP
COUNTY: MONTGOMERY
Parameter
FLOW
pH
IKIKACHLOROETHENE
T R A N S - U -DICHLORETHENE
CIS-U-DICHLOROETHENE
CHLOROFORM
TRICHLOROETHENE (TCE)
ETHYLBENZENE
Sample Measuicment
Pennit Requirement
Sample Measurement
Pemut Requiiement
Sample Measuiemcnt
Rcquuwnent Sample
Measuiemcnt Pcimit
Requiiement Sample
Measurement Peimit
Requiiement Sample
Measuiemcnt Peiimt
Requiiement Sample
Measuiemcnt Pemut
Requiiement , Sample
Measuiemcnt Penmt
Requirement NAME/niLE PRINCIPAI. EXEOmVE OFFICER
GEORGE LUXBACHER VPOPERATIONS-GSHI
TYPEORPRINT
PAOOl 0944
PERMITNUMBER
005 DISCHARGE NUMBER
MONITORING PERIOD
YEAR
•zm MO
!1<1
DAY
m QU A i m T Y OR LOADING
MONTHLY AVERAGE
mm MONnOR«EPORT
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
DAILY MAXIMUM
mss MONTTORrtlEPORT
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
UNITS
mgd
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
TO YEAR
2tfJ'0 MO
•a DAY i%
Southeast Region Facsimile
nCthnfonB
QUAUTV OR CONCENTKATIGN
INST. MINIMUM
XXXX
XXXX
731
6.0
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX I CERTIFY UNDER PENALTY OF LAW THAT 1 HAVE PERSONALLY EXAMINED AND AM FAMIUAR WITH THE INFORMATION SUBMITTED HEREIN AND BASED ON MT INQUIRY OF THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINwA THE INFORMATION, 1 BEUEVE THE SUBMITTED INFORMATION IS TRUy ACCURATE AND COMPLETE. 1 AM AWARE THAT THERE ARE SlCNfflOUfr, PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDINO THE POSSlflll&Y OF FINE AND IMPRISONMENT SEE 18 U.S.C. SlOOl AND 33 U.S.C. S1319. (Penalties under these stalules may include fines up Co $10,000 and or maximum imprisonment of between 6 months and 5 years)
MONTHLY AVERAGE
XXXX
XXXX
XXXX
XXXX
S.K0Q4
NON-DETECT
<o:oo-E
NON.DErECT
<.aooi! 0.00275
.<tt,OOT
NON-DETECT
<o.oor
0.00445
<; 0:007
NON-DETECT
msT. MAXIMUM
XXXX
XXXX
?iiSI INST. MAX.
9.0
mm NON-DETECT
SROM'
NON-DETECT
•?.0;TTO
0.0041
sfOiOOl
NON-DETECT
SKQOI
O.0O7O
g?o;0O7
NON-DETECT
SIGNATURE OF PRINCIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
UNTTS
XXXX
STD UNITS
MCM.
MG/L
MGrt.
MGA.
MGIL
uai.
NO. EX
0
0
0
0
0
0
0
0
FREQUENCY OF
ANALYSIS
DAILY
DAILY
1/MONTH
1/MONTH
1/MONTH
l/MONTH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
l/MONIH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
l/MONTH
TEUEPHONE
610-327-4174
AREA CODE NUMBER
20V0
YEAR
SAMPLE TYPE
RECORDED
RECORDED
GRAB
CJSAB
GRAB
CRAB
GRAB
GRAB
GRAB
CRAB
GRAB
GRAB
GRAB
CRAB
GRAB
GRAB DATE
MO
02
DAY
COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all aoacluiients here) pERMlT EXPIRES August31,2014 . SUBMIT RENEWAL BY February 28, 2014
EPA FORM 3320-1 (Rev 9 - 88) previous edition may be used R e 3 0 ( G J £ 0 9 ) 2 2 6 - 8
(REPLACES EPA FORM T -40 WHICH MAY NOT BE USED) Page 1 of2
AR300323
P b K M l l l E t NAME ADUKhSS (mclude NA 1 lONAL PULLU 1 AN 1 UiSUHAKUt hLIMINA HON SYSl t M (NPDES) Facility Name / Location if dieferent) DISCHARGE MONTrORING REPORT (DMR)
PRIMARY FACILITY: OCCIDENTAL CHEMICAL GROUNDWATER REMEDUTION STTE
CLIENT: GLENN SPRINGS HOLDINGS, INC.
ADDRESS: 5005 LBJ FREEWAY, STE 1350
DALLAS, TX 75244
SITE ADDRESS: 375 ARMAND HAMMER BOULEVARD
MUNICIPALITY: LOWER POTTSGROVE TOWNSHIP
COUNTY: MONTGOMERY
STYRENE
PHENOLS, TOTAL
VINYLCHLORIDE
Sample Measurement
Requiiement Sample
Measurement Permit
Sample Measurement
Pamit Requirement
Sample Measurement
Penmt
Sample Measurement
Permit Requirement
Sample McasuFemcnt
Penmt Requirement
Sample Measmemenl
Peimit Requiiement
Sample
Pemut Requirontnt
NAME/TITLE PRINCIPAL EXECUTIVE OFHCER
GEORGE LUXBACHER, VP OPERATIONS-GSHI
TYPEORPRINT
PA0010944 PERMITNUMBER
005
DISCHARGE NUMBER
MONITORING PERIOD
YEAR
2atO MO
m DAY
to QUANTrrv O R LOADINC
MONTHLY AVERAGE
XXXX
XXXX
XXXX
XXXX
XXXX
DAILY MAXIMUM
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
UNITS
XXXX
XXXX
XXXX
TO YEAR
tm MO
iTii DAY
u QUALITY OR CONCDOBATION
INST. MINIMUM
XXXX
XXXX
XXXX
XXXX
XXXX
1 CERTIFY UNDER PENALTY OF LAW THAT 1 HAVE PERSONALLY EXAMINED AND AM FAMILIAR WITH THE INFORMATION SUBMITTEDy HEREIN AND BASED ON MY INOUKY OF THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING THE INFORMATION, 1 BELIEVE THE SUBMnTED INFORMATION IS TRUE, ACCURATE AND* COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES Fiji ' SUBMITTING FALSE INFORMATION, INCLUDINO THE POSSIBILITY OF FINE AND IMPRISONMENT SEE 18 U.S.C. SlOOl AND 33 U.S.C. S13I9. (Penalties under these statutes may include fines up to SIO.OOO and or maximum imprisonment ofbctwecn 6 months and S years)
MONTHLY AVERAGE
swora NON.DErECT
sroioio MONirORWEPORT
•goaraj NON-DETECT
INST MAXIMUM
WS&
NON-DETECT
SftOJQ
MONTTOR/REPORT
•imm
NOH-DEIECT
SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED ACENT
Soutbeast Region Facsimile
NOTE: Read iulmctiaiu bcfort cAnplcliiig tlus fono
UNITS
MG/L
MG/L
MC/L
NO. EX
0
P
0
FREQUENCY OF
ANALYSIS
l/MONTH
l/MONIH
l/MONTH
l/MONIH
1/MONTH
1/MONTH
TELEPHONE
\ , 610-327-4174
AREA CODE NUMBER
2pro
YEAR
SAMPLE TYPE
CRAB
GRAB
CRAB
GRAB
GRAB
CRAB
DATE
MO
02
DAY
COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
PERMFT EXPIRES August 31,2014 SUBMIT RENEWAL BY Febmai7'28, 2014