GIS: Improvements to DNR Permitting and Floodplain Management
Lacey DuncanMay 2012
![Page 2: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/2.jpg)
Improvements in 2011
• DNR Permitting – Public Freshwater Lakes
• Floodplain Analysis / Regulatory Assessment (FARA) Maps
• LiDAR/Orthoimagery Availability
![Page 3: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/3.jpg)
Public Freshwater Lake Permits
IC 14-26-2 Lake Preservation Act
*Underwater Beaches**SeawallsDredgingBoatwells
Group PiersFish Attractors
Aerators
*Shoreline classification required**Shoreline delineation and classification required
![Page 4: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/4.jpg)
Year Permits Inspected
2011 56%
2010 57%
2009 67%
2008 68%
2007 73%
2006 73%
2005 77%
2004 88%
2003 93%
2002 96%
2001 93%
• Rule Changes
• Improved research capabilities
• Triage
• Overall Development on PFL
Inspection Reduction
![Page 5: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/5.jpg)
Transfer of Inspections to Central Office
2000-2010 1 field inspector
2011 8 inspectors
Creation of 3 Regions
![Page 6: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/6.jpg)
Total Public Freshwater Lake Permits
Region 3 Region 2 Region 1
![Page 7: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/7.jpg)
Lake Inspections
![Page 8: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/8.jpg)
Old Method of Shoreline Delineation
• Triangulate every measurement– Required 3 measurements for 1 shoreline break
• Final sketch skewed without compass• IntelliCAD 2000
![Page 9: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/9.jpg)
Old Method of Shoreline Delineation
![Page 10: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/10.jpg)
Lake Inspection Need
• Efficient data collection prior to inspection• Decrease time in field • Little commitment in office upon return• Keep re-inspections to a minimum• Improved quality product for customer
![Page 11: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/11.jpg)
Inspection Preparation
• Prepare lake sketch– Identify 250’ range for site
• Locate staff gage and legal lake level data• Research relevant permits
– Shoreline Classification– Permitted Seawalls– Unresolved Violations
![Page 12: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/12.jpg)
Inspection Preparation
Permit Application
![Page 13: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/13.jpg)
Inspection Preparation
Using routefinder9:31 Total Travel Time5:45 Drive Time
![Page 14: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/14.jpg)
Final Lake Sketch
![Page 15: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/15.jpg)
Final Lake Sketch
![Page 16: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/16.jpg)
Long Lake Sketch
West
East
Old Method
New Method
Breaks in Shoreline 18 18
Tie Points Needed 72 54
![Page 17: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/17.jpg)
Floodplain Analysis and Regulatory Assessment (FARA)
A thorough approach to the response letter
– Connect the FARA to the legend in the map– Address floodway and flood insurance– Electronic signatures– Emailed Response
![Page 18: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/18.jpg)
Old Method
![Page 19: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/19.jpg)
Pre-DFIRM
![Page 20: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/20.jpg)
The Driving Forces
April 201232 Counties
March 201111 Counties
New Floodplain Mapping
Electronic Submittals
![Page 21: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/21.jpg)
INdiana Floodplain Information Portal
![Page 22: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/22.jpg)
New DFIRM
![Page 23: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/23.jpg)
New FARA Format
![Page 24: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/24.jpg)
Development of the .mxd
• Getting the Shapefiles– Published Special Flood Hazard Area– Preliminary Special Flood Hazard Area– Ohio River Floodway
• Improving the Process– Using the DFIRM Political Areas to determine
local Floodplain Administrator
• Developing the map language
![Page 25: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/25.jpg)
The .mxd
![Page 26: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/26.jpg)
DNR Floodplain Map
Zone AE/Floodway
![Page 27: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/27.jpg)
DNR Floodplain Map
Zone A
![Page 28: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/28.jpg)
2011 LiDAR and Orthoimagery
• New Imagery for DNR Floodplain Map and Lake Sketches
• Increasing Hydraulic Ratings
20112005
![Page 29: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/29.jpg)
3D Analyst
2011
![Page 30: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/30.jpg)
Improving the Accuracy of the FARA
2005
![Page 31: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/31.jpg)
Improving the Accuracy of the FARA
2011
2005
![Page 32: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/32.jpg)
Increasing Elevation Determinations
Tot
al N
umbe
r
Year
![Page 33: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012](https://reader035.vdocuments.us/reader035/viewer/2022062500/568153dc550346895dc1d580/html5/thumbnails/33.jpg)
Lacey [email protected]