Fixed EquipmentReliability Standards,Practices & Industry
Activities
Gregory AlvaradoVice-President and Sr. Consultant
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 2/36
Presenter – Greg Alvarado
VP and Sr. Consultant – The Equity Engineering Group, Inc.
30 Years Global Experience Fixed Equipment Reliability
23 Year Voting Member API ISC – 510, 570, etc.
Original Member of RP 580, both editions
Original Member RP 581, both editions
NACE Refining and Chemical Committees Member 12 years
First Chair NACE sub-committee on AE
API RP 580/581 Instructor for 12 years
Founder and Chief Editor of the Inspectioneering Journal
Invited Participant in 2003 Rand Study on Critical
Infrastructure for US Refining Industry
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 3/36
Main Points
•
Industry Goals - Reliability• Losses continue to happen
• Are we learning from the past?
• Various programs should provide “layers” of
protection
Focused information from various sourcesIndustry standards
Industry certifications
Management Systems
Management Leadership
PracticesManaging uncertainty, the role of inspection
Metrics and Gap Analyses
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 4/36
Introduction
Losses in the refinery industry have continued
to increase over the last few years and the causes
highlight the aging facilities in this category. A
significant number of larger losses (over
$10,000,000) have been caused by piping failuresor piping leaks, leading to fires and/or explosions.
Several large losses due to piping failures were
due to corrosion issues or using the wrong
metallurgy…..
4
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 5/36
Introduction
The explosion occurred when employees were
attempting to isolate a leak on a condensate line
between the NGL plant and the refinery. Three
crude units were damaged and two reformers
were destroyed. The fire was extinguished
approximately nine hours after the initial explosion. Five people were killed and 50 others
were injured. Initial investigation into the loss
indicates a lack of inspection and maintenance of
the condensate line.
June 25, 2000Mina Al-Ahmadi, Kuwait$412,000,000 (2000 dollars) $433,000,000 (2002dollars)
From the Marsh and McLennan Report, The 100 Largest Losses 1972-2001, 20th
Edition: February 2003, a publication of Marsh’s Risk Consulting Practice 5
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 6/36
“The Goal”
Achieve regulatory and corporatecompliance (business, safety,
environmental), and ensurereliable use of fixed equipment forfinite run times, by understanding,
identifying, measuring, and
managing risks and eliminatingnon-value adding activities and
costs.
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 7/36
Improvement is Needed
“The significant problems we have
cannot be solved at the same level of thinking
with which we created them. “
~Albert Einstein
• Plants are aging
– Failure rates will increase without effective
change – See latest Marsh Consulting Report© 2010
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 8/36
Marsh Report Observations
• …As risk management techniques grow increasingly complex, and oil, gas, and chemical companies continue to seek new ways to managetotal cost of risk, it has become even moreimperative to have a firm grasp on the nature of operational losses that have historically occurred.
Indeed, when planning ahead, one step involveslooking back to the future. No one who has been inthese industries for very long would ever say “that will never happen again!” James R. Pierce,Chairman Energy Practice, Marsh Consulting
• Five year loss totals in the refinery industry havecontinued to trend upwards over the last fewyears. Piping failures or leaks (corrosion orincorrect metallurgy) and start-up and shut-downevents continue to be significant causes.
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 9/36
API 754 – NEW PSM Metrics
Released April 2010
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 10/36
What Are IM ProtectiveBarriers?
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 11/36
Swiss Cheese Model
• Hazards are contained by multipleprotective barriers.
• Barriers may have weaknesses or “holes”.
• When holes align, the hazard passes
through the barriers resulting in thepotential for harm.
• Barriers may be physically engineeredcontainment or behavioral controlsdependent upon people.
• Holes can be latent, incipient or activelyopened by people.
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 12/36
IM PBs in Facility PSMProgram
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 13/36
Examples of Tier 4 Items
• Process Safety Action Item Closure - Percentage and/or number
of past-due process safety actions. This may include items fromincident investigations, hazard evaluations or compliance audits.
• Training Completed on Schedule - Percentage of process safetyrequired training sessions completed with skills verification.
• Procedures Current and Accurate - Percent of process safetyrequired operations and maintenance procedures reviewed orrevised as scheduled.
• Safety Critical Equipment Inspection - Percent of inspections of safety critical equipment completed on time. This may includepressure vessels, storage tanks, piping systems, pressure relief devices, pumps, instruments, control systems, interlocks andemergency shutdown systems, mitigation systems, and emergencyresponse equipment.
• Safety Critical Equipment Deficiency Management - Responseto safety critical inspection findings (e.g. nonfunctional PRDs andSISs). This may include proper approvals for continued safeoperations, sufficient interim safeguards, and timeliness of repairs,replacement, or rerate.
• Management of Change (MOC) and Pre Start-up SafetyReview (PSSR) Compliance - Percent of sampled MOCs andPSSRs that met all requirements and quality standards.
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 14/36
• Improved reliability
• Fewer leaks
• Fewer surprises during turnarounds
• Shorter turnarounds• Proactive behavior = Planning, strategies,
health, safety and business result – From FEEDthrough end of life
• Elimination of non-value adding activities
• Effective life-cycle planning and management of equipment
• Predictable outcomes
• Effective spending
• Better intentional directives
Examples of Best PracticesImplementation & Benefits
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 15/36
Construction CodeASME VIII-1, VIII-2, I, B31.3, B31.1
Commissioning(Baseline Inspection)
In-Service Inspection(Establish Inspection Interval)
Prescriptive (API 510/570/653,NBIC)
Risk-Based (API 580/581,PCC3)
InspectionResults
Fitness-For-Service
API 579/ASME FFS-1
Run/Rerate ReplaceRepair
ASME PCC2
Continue Service T e c h n o l o g y
I n t e g r a t i o n
AnticipatedDamage
Specify Design Conditions and IdentifyDamage Mechanisms (API 571,
WRC 488, WRC 489, WRC 490),Select Materials of Construction
Identify Damage Mechanisms(API 571, WRC 488, WRC 489, WRC 490)
UnanticipatedDamage
Life CycleManagement
of FixedEquipment
Sample components of ASME PTB-2-2009Guide to Life Cycle Management of Pressure
Equipment Integrity
June 5, 2009
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 16/36
Best Practices UnderConstruction
The API Pressure Vessel Inspection Code,510, is undergoing a massive re-write tomake it consistent with the other standardsand capture industry best practices to date.
Construction of the following new referencesis under way:
• RP 583 Corrosion Under Insulation
• RP 584 Integrity Operating Windows• RP 585 Pressure Equipment Investigation
• API 691 RBI of Rotating Equipment
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 17/36
Newly released documents include:
• API RP 580 Risk-Based Inspection, 2nd Edition,November 2009
• API RP 576 Inspection of Pressure RelievingDevices, 3rd Edition November 2009
• API RP 574 Inspection Practices for PipingComponents, 3rd Edition, November 2009
• API RP 572 Inspection Practices for Pressure
Vessels
• API 570 Piping Inspection Code: In-serviceInspection, Rating, Repair, and Alteration of Piping Systems, 3rd Edition, November 2009
Best Practices NewlyReleased
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 18/36
Inspector Certifications
Basic
• 510 Pressure Vessel
• 570 Piping
• 653 Above Ground Storage Tanks
• 936 Refractory
• QUTE
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 19/36
Inspector Certifications
• Advanced Supplemental
– 580 RBI
– 571 Damage Mechanisms
– 577 Welding & Metallurgy
– Meaning of supplemental certifications
• API DB Searchhttp://www.api.org/certifications/ICP/
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 20/36
PEI Management Systems
Inspectioneering® Journal Article SeriesJanuary/February 2010 Issue
Management Leadership and Support for PEI, by John Reynolds
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 21/36
Management Leadership & Support for PEI
Inspectioneering® Journal Article SeriesJanuary/February 2010 Issue
Management Leadership and Support
for PEI, by John Reynolds
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 22/36
PEI Program - 101 ElementsInspectioneering® Journal Article Series Published
• Ammonium Salt Corrosion
• Auditing of PEIM Programs
• Bad Actor Pumps
• Brittle Fracture Prevention
• Carbon – ½ Moly Equipment
• Cathodic Protection
• Cast Iron
• Certification of Inspectors
• Chloride Cracking (External) of Stainless Steel Piping and Vessels
• Contamination of Process Streams(Sudden Inadvertent)
• Corporate Failure Memory
• Corrosion Rate and Remaining LifeCalculations (Timely)
• Corrosion Rate and ProcessCondition Monitoring
• Corrosion Under Insulation (CUI)
• Corrosive Mix Points
• Critical Check Valves
• Dummy Leg Corrosion
• Deadlegs (Inspection of)
• Dew Point Corrosion
• Electric Resistance Welded (ERW) Pipe
and Tubing• Exchanger Bundle Classification
• External Corrosion Prevention
• Inspection for Environmental Cracking
• Gray Zone Equipment
• Fabrication QA/QC
• Failure Analysis
• Fatigue Failures• Field Surveillance
• Fitness for Service (FFS) Analysis
• Flange Bolting Procedures
• Flange Gasket Selection and QA
• Flare System Inspection
• Fraudulent and Counterfeit Materials
• Furnace Monitoring and Inspection
• Handling of Pressure Relief Devices
• Heat Tracing in Safety Systems
• Hot Spots
• Hot Tapping and Welding on Equipment-in-Service
• Hydrostatic Overpressures
• Hydrotest Water Quality
• Hydrotesting Safety
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 23/36
• Idle and Retired Equipment
• Incidents Associated with Installation of Pollution Control Equipment
• Injection Point Inspection
• Inspection Recommendation Tracking
• Inspection Scheduling
• Inspection Procedures
• Inspection Staffing
• Inspection for Inaccessible Locations
• Inspection Record Keeping Systems(Effective)
• Key and Critical (K/C) MaterialsDegradation Variables
• Knowledge Transfer to Operators
• Leak and Failure Investigation Reporting
• Leak and/or Pressure Testing
•
Line of Authority and ManagementLeadership for Inspection
• Localized Corrosion (Inspection of)
• Management of Change (MOC) for PEIIssues
• Materials and Corrosion Engineering
• Material Degradation Risk Management
• Mixed Metallurgy Piping Systems
• NDE Specialists
• NDE versus Pressure Testing
• Non-blowout Proof Valve Stems
•
• On-Stream Inspection (OSI)
• Overdue (Equipment) for Inspection
•
• Paint and Coatings QA/QC
• Participation on Industry
Standardization Committees
• Performance Testing of NDEExaminers
• Pipe Plugs
• Pipe Rack Inspections
• Piping Inspection
• Plugged Vents on Storage Tanks
• Positive Material Identification (PMI)
• Post Weld Heat Treatment• Pressure Equipment and Inspection
Codes / Standards
• Pressure Equipment RegulatoryActivities
• Pressure Relief Device Auditing
• Process Creep
PEI Program - 101 ElementsInspectioneering® Journal Article Series Published
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 24/36
• Qualified Suppliers and Fabricators
• Relief Valve Prepopping
• Repair and Testing Procedures
• Risk Based Turnaround and InspectionPlanning
• Root Cause Analysis, FailureInvestigations, and SolutionDevelopment
• Selection and Placement of CorrosionMonitoring Locations (CML’s)
• Shared Ownership of PressureEquipment Assets
• Small Bore Piping (SBP) Inspection
• Soil-to-Air Interfaces of Buried Piping
•
Structural Inspections• Surface Cleaning for Inspection
• Tank Bottom Inspection
• Temporary Repairs and TemporaryInstallations
• Thickness Measurement Accuracy andReproducibility
• Third Party Owned Equipment
• Total Cost of Ownership
• Training of Inspectors
• Transient Piping Loads
• Tank Roofs (Inspection of)
• Valve Quality Problems
• Water Drop Out Points
• Welding Quality Assurance and QualityControl
• Wire Wrapping / Boxing of Flange Leaks
PEI Program - 101 ElementsInspectioneering® Journal Article Series Published
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 25/36
Managing UncertaintyIntentionally
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 26/36
Additional BenefitsInspection Planning & CBA
-$400,000
-$200,000
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
Unit A Unit B Unit C Unit D Unit E
Current Inspection Costs
Current Maintenance Costs
Total Current Costs
RBI Inspection Costs
RBI Maintenance Costs
RBI Total
Total Savings
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 27/36
LERU RBI Cost BenefitInspection Planning & CBA
Unit TypeCBI
(% Reduced)RBI
(% Reduced)Risk Mitigation
(% Improvement)
431 DIB/Deprop 11 85 74
866 Heavy HDS 2 50 48
867 SRU 21 93 72
231 Gulfiner 22 50 28
531 Amine 30 68 388733 SWS 30 83 53
137 Crude 4 6 2
210B Crude 53 91 38
210C Vac 40 68 28
865 Kero HDS 9 49 40
860 Reformer 35 91 56
862 LERU 17 85 68
864 Unifiner 10 63 53
210A Crude 32 74 42
868 FCC 4 66 62
869 Sulfuric Alky 16 60 44
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 28/36
Inspection Planning
0 2 D A
2 0 1 T
0 2 F A
2 2 9
0 2 D A
2 1 3 T
0 1 E A
1 0 5 F
s s
0 2 E A
2 3 4 s s
0 2 F A
2 1 4
0 2 F D
2 0 2
0 2 E A
2 0 2 A
s s
0 2 E A
2 3 2 s
s
0 1 E A
1 0 5 E
s s
0 1 E A
1 1 2 A
/ E i h d
r
0 2 F A
2 1 3
0 2 E A
2 4 0 A
s s
0 2 D A
2 1 0 B
New
0
500
1000
1500
2000
2500
3000
3500
4000
R i s k ( S q .
F t / y r )
• Green risk profile is with API RBI implemented in this process unit
• Blue risk profile is with traditional API 570/510 program in place
• Blue plan yields 1.7’sq./year/$$ of risk reduction over 4 years
• Green strategy yields 2.7’sq./year/$$ risk reduction over 4 years
• Net benefit is ~40% improvement in risk reduction
• ROI >> 10X
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 29/36
Gap CheckFixed Equipment Reliability
• Gap Analysis
– FERMI™ Process
• Best Practices
• Observations/recommendations• Roadmap – Strategy
• Cross-functional team with owner/operatorexperience and SME’s
• Trained team members
• Metrics and Priorities – Jointly developed,may also use company HSE risk matrix
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 30/36
Sample FERMI™ Focus Areas
Broad Categories
• Data Management
• Engineering &
Maintenance• Equipment
Planning
• Inspection
Management• Inspection
Planning
• InspectionPrograms
• Metallurgy• Plant Processes
• ReceivingInspections
• Welding andRepairs
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 31/36
Benchmarking
• Working Practices• Procedures
• Understanding
• Utilization of best practices
• Synergies & interdependent practices,processes & programs
• Metrics
• Kudos – Good practices recognized
• Areas of vulnerability• Recommendations for improvement
• Benchmarking metrics
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 32/36
Practices & Implementation
• Scoring is based on a rating from 1 to 5 where:1 = No awareness, nor implementation
2 = Awareness, but not implemented or significantly lowercaliper vs. refining industry common practice
3 = Limited implementation (25%) or modestly lower calibervs. refining industry common practice
4 = Partial implementation (25-90%) or similar to refiningindustry common practice
5 = Totally implemented and part of routine business, similarto pacesetter refinery practices.
• The resulting scores are based both on the
interview results, as well as, the file review.• Each of the subject area statements are also
weighted for relative importance. These weightnumbers are used for the benchmarking of onefacility versus another.
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 33/36
Scoring
• One of the objectives of an assessmentshould be to provide a means of measuringthe FER (Fixed Equipment Reliability)program performance of a facility, initiallyand over time.
• The scoring enables an owner to:
– Compare the facility performance against atop performers
– Measure the change in performance as a
result of closing the identified gaps for eachFERMI focus area
– Compare the site to other company sites andto compare against itself at periodic intervals
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 34/36
Assessment Methodology –File Review
• The file review is performed after the initialinterviews to verify the information obtained throughthe interview process.
• E2G’s specialists have reviewed fixed equipmentgroups and programs from many refineries.
• The mix of subject matter experts and seasonedfacility technical staff are able to not only determineif a particular MI procedure is in use, but are alsoable to determine a relative quality of the writtenmaterial. For instance:
– The interview determines that the facility does have a “root cause” culture. Follow up file review finds that theroot cause analysis was performed, but the conclusionsmade were not reached in a logical manner. Generallythis means that the “obvious, immediate” cause wasdetermined to be the “root” cause.
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 35/36
To keep up-to-date with industry best practices, visit
http://www.api.org
Or better yet, participate and have a “voice” in their
development by visiting the API Fall and Spring Refining
Meetings and becoming a committee member.
Learn more by visiting sites like:
http://www.api.org/
http://www.asme.org
http://www.nace.org
http://www.hse.gov.uk/
http://www.inspectioneering.com
http://forengineers.org
http://www.absa.ca/
http://www.highpressure.jp/english/
Best Practices SampleResources
8/6/2019 G Alvarado Fixed Equipment
http://slidepdf.com/reader/full/g-alvarado-fixed-equipment 36/36
Greg Alvarado
281-537-8848
www.equityeng.com