Corrections, Department of Projects Summary
($ in Thousands)
State of Minnesota 2014 Preliminary Capital Budget Requests7/15/2013
Page 1
Project Title
2014AgencyPriority
Agency Project Request for State Funds($ by Session)
GovernorsRecommendations
2014GovernorsPlanningEstimate
Ranking 2014 2016 2018 Total 2016 2018MCF- Department Wide Asset Preservation 1 $40,000 $40,000 $40,000 $120,000 $0 $0 $0MCF-SHK - Perimeter Security Fence 2 5,408 0 0 5,408 0 0 0MCF-SCL - New Intake Health Services 3 29,901 0 0 29,901 0 0 0MCF-RC - Behavioral Health Expansion 4 10,631 0 0 10,631 0 0 0MCF-SCL - Perimeter Wall Repair 5 12,600 0 0 12,600 0 0 0MCF-ML - Master Control & Misc. Renovation 6 1,617 0 0 1,617 0 0 0MCF-LL - Building E Renovation for Programming 7 2,679 0 0 2,679 0 0 0MCF-SHK - Offender Monitoring System 8 1,799 0 0 1,799 0 0 0MCF-Department Wide Steam & Gas Meters 9 3,100 0 0 3,100 0 0 0Total Project Requests $107,735 $40,000 $40,000 $187,735 $0 $0 $0
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
2/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
3/16
Corrections, Department of Project Narrative
MCF- Department Wide Asset Preservation
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 3
Project Contact Person
Bill Montgomery, Capital Resources AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200Saint Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066Email: [email protected]
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
4/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
5/16
Corrections, Department of Project Narrative
MCF-SHK - Perimeter Security Fence
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 5
These reports demonstrate an increased risk to the security of the facility andpublic and a recognized lapse in correctional practices and
procedures in managing a facility with over 600 felons with no perimeterbetween the facility and the general public.
Impact on Agency Operating Budgets (Facilities Notes)
Maintenance and utility costs for the fence, lighting and electronics will beongoing and require the addition of one FTE Electronics Systems Specialist.Security staff would be increased by 1.5 FTE due to the increased securitymeasures required for vehicle access and egress through a controlled gate.
Previous Appropriations for this Project
None.
Other Considerations
None.
Project Contact Person
Bill Montgomery, Capital Resources AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200Saint Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066
Email: [email protected]
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
6/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
7/16
Corrections, Department of Project Narrative
MCF-SCL - New Intake Health Services
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 7
Impact on Agency Operating Budgets (Facilities Notes)
There will be an increase in operating expenses for utilities and maintenancedue to the additional square footage of the newly constructed areas. Therewill be some offset gained through enhanced energy efficiencies ofremodeled areas. There will be additional annual expenses associated withongoing repair and replacement of the project infrastructure and securitysystems.
An additional .50 FTE general maintenance worker will be needed to providecustodial care of the increased square footage. An additional 1.7 corrections
officer FTEs will be needed to staff the security control center that willmonitor and control access through the expanded corridor system.
The relocation of the loading dock outside of the secure perimeter will requirean additional 1.0 FTE central services administrative specialist to replace theoffender labor currently utilized within the existing secure perimeter loadingdock.
Previous Appropriations for this Project
None
Other Considerations
None
Project Contact Person
William Montgomery, Capital Resource AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200Saint Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066Email: [email protected]
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
8/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
9/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
10/16
Corrections, Department of Project Narrative
MCF-SCL - Perimeter Wall Repair
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 10
Project Contact Person
William Montgomery, Capital Resource AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200Saint Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066Email: [email protected]
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
11/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
12/16
Corrections, Department of Project Narrative
MCF-ML - Master Control & Misc. Renovation
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 12
Project Contact Person
Bill Montgomery, Capital Resources AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200St. Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066Email: [email protected]
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
13/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
14/16
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
15/16
Corrections, Department of Project Narrative
MCF-SHK - Offender Monitoring System
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 15
regular monitoring throughout the day to ensure all components areoperational. This would require an increase of 1.5 security staff.
Previous Appropriations for this Project
None
Other Considerations
None
Project Contact Person
Bill Montgomery, Capitol Resources AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200Saint Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066
Email: [email protected]
-
8/13/2019 FY14-15 Preliminary Capital Budget Requests: Corrections Dept
16/16
Corrections, Department of Project Narrative
MCF-Department Wide Steam & Gas Meters
State of Minnesota Preliminary 2014 Capital Budget Requests7/15/2013
Page 16
2014 STATE APPROPRIATION REQUEST: $3,100,000
AGENCY PROJECT PRIORITY: 9 of 9
Project Description
The Department of Corrections currently operates 10 facilities (campuses)that all have central steam and hot water systems that serve as many as 30buildings on each campus. Each campus has a central meter for steam andgas usage and individual buildings all have variable operations, uses and
schedules so there is currently no way to determine if a specific improvementto an individual building will produce verifiable energy savings. This projectwill provide the department the meters necessary to better track and reduceenergy usage in a significant way.
In addition, the department is unable to participate in any programs that offerGuaranteed Energy Savings or meet Sustainable Building 2030 EnergyStandards without first obtaining and installing meters that would allow thedepartment the ability to verify that specific improvements to individual
buildings actually produce the reduction of energy usage.
Impact on Agency Operating Budgets (Facilities Notes)
Utility costs should be reduced significantly once the meters are installed, anenergy usage baseline can be established and Improvements identified andimplemented for each building at all ten facilities.
Previous Appropriations for this Project
None
Other ConsiderationsNone
Project Contact Person
Bill Montgomery, Capital Resources AdministratorMinnesota Department of Corrections1450 Energy Park Drive, Suite 200
St. Paul, Minnesota 55108-5219Phone: (651) 361-7100Cell: (651) 331-8743Fax: (651) 632-5066Email: [email protected]
Project At A Glance
The purpose of this project is to obtain and install steam and gas meters soenergy usage can be more accurately determined for each building at eachfacility and thus allow the department to identify specific improvements that
will improve and reduce our energy usage in a verifiable manner.