Fundamentals of
Retro-Commissioning
Tom MeyerCSME, GGP, CBCP, QCP, EBCP
The ESCO Group
![Page 2: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/2.jpg)
Fundamentals of Retro-Commissioning
Fundamentals of Commissioning Existing Buildings
Fundamentals of Optimizing Existing Buildings
![Page 3: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/3.jpg)
Purpose of Retro-Commissioning
Optimization of Existing Buildings
![Page 4: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/4.jpg)
Why Existing Buildings?• Lots of existing buildings• All have opportunities • Benefits range from less
than a month to a year economic payback
• Helps identify capital and rehab projects with economic payback from one to 20 years.
![Page 5: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/5.jpg)
Not ALL Buildings are Candidates
If there is no functional use and you want to save energy – close the building down.
![Page 6: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/6.jpg)
Flavors of Commissioning
• New Construction Commissioning• Re-Commissioning• Continuous
Commissioning• Retro-
Commissioning
![Page 7: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/7.jpg)
Defining Retro-Commissioning
Q: What does “retro-commissioning” mean?1. Returning out of spec equipment back to original
design.2. Commissioning a building again after several
years since it was commissioned as new construction.
3. Commissioning a building never before commissioned to the owner’s current requirements.
![Page 8: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/8.jpg)
Limited in Scope
Most retro-commissioning programs are limited in scope. – System– Equipment– Problem
![Page 9: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/9.jpg)
Motivation
The Building Owner’s motivation is the determining factor of scale and depth of the commissioning process.
![Page 10: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/10.jpg)
Nuts and Bolts of Cx
• Benefits of Retro-Commissioning• Process of Retro-Commissioning• Commissioning Methods• Types of Commissioning
![Page 11: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/11.jpg)
Top 10 Retro-Cx Measures
10. Improve boiler efficiency/controls 9. Reset supply static pressure setpoint 8. Review terminal unit operation 7. Return VFD to variable speed operation 6. Lower condenser water temperature
Courtesy of San Diego Energy Office
![Page 12: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/12.jpg)
Top 10 Retro-Cx Measures
5. Calibrate sensors and instrumentation 4. System level and balance 3. Optimize economizer operation 2. Eliminate simultaneous heating & cooling 1. Turn off equipment when not needed
Courtesy of San Diego Energy Office
![Page 13: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/13.jpg)
Confused?
![Page 14: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/14.jpg)
Get Professional Help!
Any successful commissioning plan starts with the right people led by a person with the proper training and experience.
![Page 15: Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group](https://reader036.vdocuments.us/reader036/viewer/2022062803/56649f295503460f94c427a3/html5/thumbnails/15.jpg)
QUESTIONS?