Page 1: Fukushima Daiichi NPS Survey Map As of 5:00 PM …...2014/07/11  · Fukushima Daiichi NPS Survey Map (As of 5:00 PM on July 8, 2014)Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B

Fukushima Daiichi NPS Survey Map ( As of 5:00 PM on July 8, 2014)

Unit 1R/B Unit 2

R/BUnit 3R/B

Unit 4R/B

Unit:mSv/h

2.0

0.28

0.75

0.055

0.35

0.32

Transfer pipe100 (surface)

1.0 (Atmosphere)

Transfer pipe1.2 (surface)

0.80 (atmosphere) Transfer pipe0.10(surface)

0.060(atmosphere)Transfer pipe80(surface)

10(atmosphere)

Transfer pipe0.18 (surface)

0.18 (atmosphere)

Transfer pipe0.35 (surface)

0.065(atmosphere)

0.15

0.10

July 2011

70~100

Units 1-2 SGTS pipe

>10,000

October 2012

0.26

0.30

0.060

0.21

0.10

0.90

0.65

0.170.25

0.38

0.17

0.20

0.050

0.25 0.30 0.20

June 2012

July 2012

0.25

0.4

1.3

0.50

0.20

0.50(Roof top)

1.0

0.20

0.300.05 0.43

0.24

1.3

0.500.60

0.21

0.10

0.200.20

0.60

1.0 0.7 0.20

November 2012

December 2012

March 2013

0.020

0.050 0.020

0.070

0.0300.025

0.18

0.050

0.040

0.15

0.150.3

0.80.3

1.30.200.27

Upper part of concrete-filled vertical shaft

0.25(After gravel installation)

0.14

0.10

0.10

0.040

0.090

0.050

0.20

0.90

1.0

1.0

0.50

0.092

0.0600.47

0.085

0.10

0.30

0.80

0.026

Bottom of side ditch

30(Surface)1.3

( Atmosphere )

0.12

0.068

0.20

2.3

0.10

0.200.10

June 2013

0.35

July 2013

0.20

2.0

2.5

4.0

Atmosphere 1.8Surface: 8.5

1.5

Atmosphere 1.7Ground surface 8.5

1.0

September 2013

November 2013

0.4 2.7

0.0450.35

0.050

0.045

0.085

0.055

0.090

0.050April 2014

0.030

0.050

0.050

0.026

0.0250.050

0.040

0.055 0.090 0.20

July 2014

June 2014

0.11In front of the doorof carry-in entrance

3.5