FORM1&1A
For
ProposedGroupHousingScheme“PushkarSpringGardens”
At
LandBearingKhNo.274&275atWanadongri,Tahsil‐Hingna,Dist.Nagpur.
ProposedBy
M/s.PushkarHomesPvt.Ltd.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 1
APPENDIX‐I(Seeparagraph–6)
FORM1
(I) BASICINFORMATIONSr.No. Item Details
1 Nameoftheproject/s Proposed Group Housing Scheme “PushkarSpringGardens”atNagpur
2 S.No.intheSchedule 8 (a)3 Proposedcapacity/area/
length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.
TotalPlotArea 30,800 m2NetPlotArea 24,910.863 m2
Built‐upAreaDetails
F.S.Iarea 32,384.121 m2NonF.S.Iarea 16,435.50 m2TotalConstructionArea 48,819.63 m2Detailed Area Statement is attached asAnnexureI
4 New/Expansion/Modernization New5 ExistingCapacity/Areaetc. ‐6 Categoryofprojecti.e.AorB BCategory7 Doesitattractthegeneralcondition?if
yes,pleasespecifyNo
8 Doesitattractthespecificcondition?Ifyes,pleasespecify
No
9 Location NagpurPlot/Survey/KhasraNo. 274&275Village WanadongariTehsil HingnaDistrict NagpurState Maharashtra
10 Nearestrailwaystation/portalongwithdistanceinkms.
RailwayStation:NagpurRailwaystationapprox.13.6kms
11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.
Nagpur
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 2
Sr.No. Item Details
12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)
Nagpur Metro Region under NagpurImprovementtrust
13 Nameoftheapplicant Name:Mr.GauravD.AgarwalM/s.PushkarHomesPvt.Ltd.
14 Registeredaddress Plot No.94, Behind Gupta Towers, CivilLines,Nagpur–440001
15 Addressforcorrespondence:Name Mr.GauravDAgarwalDesignation(Owner/Partner/CEO) DirectorAddress PushkarHomesPvtLtd
Address: Plot No.94, Behind Gupta Towers,CivilLines,Nagpur–440001
Pincode 440001E‐mail [email protected]. 0712‐2540036,2540111FaxNo.
16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.
Village‐District‐State1.2.3.We are developing the proposed project onourownland
17 Interlinkedprojects NotApplicable18 Whetherseparateapplicationof
interlinkedprojecthasbeensubmitted?
No
19 Ifyes,dateofsubmission NotApplicable20 IfNo,Reason Standaloneconstructionproject21 Whethertheproposalinvolves
approval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) TheForest(Conservation)Act,1980?
b) Thewildlife(protection)Act,1972?
c) TheCRZNotification,1991?
NoNo
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 3
Sr.No. Item Details
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
No
23 Forestlandinvolved(hectares) No forest land involved inproposedprojectsite
24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?
a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthecourt
ifanyanditsrelevancewiththeproposedproject.
No such litigation pending against theproject
Capacity corresponding to sectoral activity (such as production capacity for manufacturing,mining lease area and production capacity for mineral production, area for mineralexploration, length for linear transport infrastructure, generation capacity for powergenerationetc.,)
(II)Activity1. Construction, operation or decommissioning of the Project involving actions,
whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)
Sr.No.
Information/Checklistconfirmation
Yes/NoDetails thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
No LandreservedforResidentialDevelopment
1.2 Clearanceofexistingland,vegetationandbuildings?
No1.3 Creationofnewlanduses? No Land is reserved for residential
development.1.4 Pre‐construction
investigationse.g.borehouses,soiltesting?
No
1.5 Constructionworks?
Yes Residentialproject1.6 Demolitionworks?
No
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 4
Sr.No.
Information/Checklistconfirmation
Yes/NoDetails thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
Yes Temporary sheds will be provided forworkers
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
No
1.9 Undergroundworksincludingminingortunnelling?
No
1.10 Reclamationworks? No1.11 Dredging? No1.12 Offshorestructures? No1.13 Productionand
manufacturingprocesses?No
1.14 Facilitiesforstorageofgoodsormaterials?
Yes Onlyconstructionmaterialwillbestored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Mechanical composting for Solid WasteDisposal and Sewage Treatment Plant forsewagedisposal.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
No
1.17 Newroad,railorseatrafficduringconstructionoroperation?
No
1.18 Newroad,rail,airwaterborneorothertransportinfrastructureincludingneworalteredroutesandstations,ports,airportsetc?
No Existing roadwill beused for the transportpurpose.
1.19 Closureordiversionofexistingtransportroutesorinfrastructureleadingtochangesintrafficmovements?
No
1.20 Newordivertedtransmissionlinesorpipelines?
No
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 5
Sr.No.
Information/Checklistconfirmation
Yes/NoDetails thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.21 Impoundment,damming,culverting,realignmentorotherchangestothehydrologyofwatercoursesoraquifers?
No
1.22 Streamcrossings? No1.23 Abstractionortransfersof
waterformgroundorsurfacewaters?
No
1.24 Changesinwaterbodiesorthelandsurfaceaffectingdrainageorrun‐off?
No There will not be any changes in waterbodiesorthelandsurface
1.25 Transportofpersonnelormaterialsforconstruction,operationordecommissioning?
Yes Construction workers and constructionmaterial
1.26 Long‐termdismantlingordecommissioningorrestorationworks?
No
1.27 Ongoingactivityduringdecommissioningwhichcouldhaveanimpactontheenvironment?
No
1.28 Influxofpeopletoanareaineithertemporarilyorpermanently?
Yes Only Constructionworkerswill stay duringconstructionphaseandofficepersonnel
1.29 Introductionofalienspecies?
No Nointroductionofalienspecieswilloccurasthisisresidentialproject
1.30 Lossofnativespeciesorgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions?
No No2 UseofNaturalresourcesforconstructionoroperationoftheProject(suchasland,
water,materialsorenergy,especiallyanyresourceswhicharenon‐renewableorinshortsupply):
Sr.No. Information/checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
2.1 Landespeciallyundevelopedoragriculturalland(ha)
No
2.2 Water(expectedsource&competingusers)unit:KLD
Yes TotalWaterdemandwillbe334 KLDThedetailedwaterbalanceisattachedas
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 6
AnnexureIV2.3 Minerals(MT) No2.4 constructionmaterial–
stone,aggregates,sand/soil(expectedsource–MT)
Yes Stoneaggregatesdemandwillbesourcedfromnearbylocalvendors
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)2.6 Energyincludingelectricity
andfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes Totaldemandload:3.2MW SourceofElectricity:MSEDCL
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concernsaboutactualorperceivedriskstohumanhealth.
Sr.No. Information/Checklistconfirmation
Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes Used oil from DG sets will be given toauthorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)
No
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No ProposedProjectwillnotaffectthewelfareofpeople
3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,
No Proposed Project will not affect hospitalpatients, children etc. as these are locatedawayfromprojectsite
3.5 Anyothercauses No4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)
Sr.No. Information/Checklist
confirmationYes/No Detailsthereof (withapproximate
quantities/rates,whereverpossible)withsourceofinformationdata
4.1 Spoil, overburden orminewastes
No
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 7
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes TotalSolidWasteGenerationwillbe1235kg/day
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
No Used oil from DG set will be given toauthorisedrecyclers.
4.4 Other industrial processwastes
No No,ThisisaResidentialProject4.5 Surplusproduct No NotApplicable4.6 Sewagesludgeorother
sludgefromeffluenttreatment
Yes Usedasmanure
4.7 Construction ordemolitionwastes
No NotApplicable4.8 Redundantmachineryor
equipmentNo NotApplicable
4.9 Contaminatedsoilsorothermaterials
No NotApplicable4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)
Sr.No.Information/Checklistconfirmation
Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources
No NotApplicable
5.2 Emissionsfromproductionprocesses
No NotApplicable5.3 Emissions from materials
handling including storageortransport
Yes Fugitiveemissionfromhandlingsuchassand,aggregates,cementetc.
5.4 Emissions fromconstruction activitiesincluding plant andequipment
Yes Transportationofconstructionmaterial,DGsetsetc.
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedust
5.6 Emissionsfromincinerationofwaste
No NotApplicable5.7 Emissions from burning of
wasteinopenair(e.g.slashmaterials, constructiondebris)
No NotApplicable
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 8
Sr.No.
Information/Checklistconfirmation
Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.8 Emissions from any othersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No.Information/Checklistconfirmation
Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdatawithsourceofinformationdata
6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers
Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets
6.2 From industrial or similarprocesses
No NotApplicable6.3 Fromconstructionor
demolitionYes Increase in noise levels due to operation of
construction equipments & vehicularmovement emissions from vehicles & DGsets
6.4 Fromblastingorpiling No OpenFoundation6.5 Fromconstructionor
operationaltrafficYes Traffic during construction phase is
negligible and during operation phase ismore.
6.6 From lighting or coolingsystems
No NotApplicable6.7 Fromanyothersources No NotApplicable
7. Risks of contamination of land or water from releases of pollutants into the
groundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
Yes DuetospillageofusedoilfromDGset
7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)
No STPwillbeused.SurplusTreatedWaterwillbedischargedinMunicipalSewerLines
7.3 By deposition ofpollutantsemittedtoairinto the land or intowater
No NotApplicable
7.4 Fromanyothersources No NotApplicable7.5 Is there a risk of long No NotApplicable
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 9
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
term build up ofpollutants in theenvironmentfromthesesources?
8. RiskofaccidentsduringconstructionoroperationoftheProject,which
couldaffecthumanhealthortheenvironment
Sr.No. Information/Checklistconfirmation
Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
No NotApplicable
8.2 Fromanyothercauses
No NotApplicable8.3 Couldtheprojectbe
affectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
No The proposed structure is designed as perSeismicZoneIIIstandards.
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which
could leadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
9.1
Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment
No
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 10
•extractiveindustries•supplyindustries•other
9.2 Lead to after‐use of thesite,which couldhaveanimpact on theenvironment
No NotApplicable
9.3 Set a precedent for laterdevelopments
No NotApplicable9.4 Havecumulativeeffects
duetoproximitytootherexistingorplannedprojectswithsimilareffects
No NotApplicable
(III)EnvironmentalSensitivity
Sr.No.Areas Name/
IdentityAerialdistance(within15km.)Proposedprojectlocationboundary
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
Yes SonegaonAirport:7.80kmAmbazariLake:8.29KmsPhutalaLake:9.9Kms
2 Areaswhichareimportantor sensitive for ecologicalreasons ‐ Wetlands,watercourses or otherwaterbodies,coastalzone,biospheres, mountains,forests
Yes Ambazari Lake:8.29KmsPhutalaLake:9.9Kms
3 Areas used by protected,important or sensitivespecies of flora or faunafor breeding, nesting,foraging, resting, overwintering,migration
No
4 Inland, coastal, marine orundergroundwaters
Yes Ambazari Lake:8.29KmsPhutalaLake:9.9Kms
5 State,Nationalboundaries No6 Routesorfacilitiesusedby
thepublicforaccesstorecreationorothertourist,pilgrimareas
No
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 11
Sr.No.
Areas Name/
IdentityAerialdistance(within15km.)Proposedprojectlocationboundary
7 Defenceinstallations No8 Densely populated or
built‐upareaYes Fullyurbanisedarea
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
Yes Hospitals, schools, colleges, communityfacilities& places of worship are presentaround the Project site. These places fallunderNagpurMunicipalCorporation
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
No
11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
No
12 Areas susceptible tonatural hazard whichcouldcausetheprojectto present environmentalproblems(earthquakes, subsidence,landslides, erosion,floodingor extreme or adverseclimaticconditions)
No
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
(IV). ProposedTermsofReferenceforEIAstudies
Iherebygivenundertakingthat thedata&informationgivenintheapplication&enclosuresare true to thebest ofmyknowledge&belief& I amaware that if anypartof thedataandinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:18.01.2017Place:Nagpur GauravDAgarwal PushkarHomesPvt.Ltd.
Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:
1) The projects involving clearance under Coastal Regulation Zone Notification, 1991 shallsubmitwiththeapplicationaC.R.Zmapdulydemarcatedbyoneoftheauthorizedagencies,showingtheprojectactivities,w.r.tC.R.Z(atthestageofTOR)andtherecommendationsoftheStateCoastalZonemanagementAuthority(atthestageofEC).SimultaneousactionshallalsobetakentoobtaintherequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.
2) The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere
Reserves,MigratoryCorridorsofWildAnimals, theprojectproponent shall submit themapduly authenticated by Chief Wildlife Warden showing these features vis‐avis the projectlocationandtherecommendationsorcommentsofthechiefWildlifethereon.(atthestageofEC)
3) All correspondence with the ministry of Environment & Forests including submission ofapplication forTOR/Environmental Clearance, subsequent clarifications asmaybe requiredfromtimetotime,participationintheEACmeetingonbehalfoftheprojectproponentshallbemade by the authorised signatory only. The authorised signatory should also submit adocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 13
APPENDIX‐II(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)1.1 Willtheexistinglanduseget
significantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.ProposeddevelopmentisinlinewithD.PFollowingdocumentsareattachedassupportingdocuments.1. ConceptualPlanisattachedasANNEXUREII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
TotalPlotArea 30,800 m2
NetPlotArea 24,910.86 m2
Built‐upAreaDetails
F.S.Iarea 32,384.12 m2
NonF.S.Iarea 16,435.50 m2
TotalConstructionArea 48,819.63 m2
WaterConsumption
TotalWaterConsumption
334 KLD
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 14
EnergyConsumption
TotalEnergyConsumption
764 kW
ParkingProvided
Details Parking(Nos)ParkingProvided
4Wheeler 2902Wheeler 1060Bicycle 1060Connectivity Locationplanisattached
asANNEXUREIII1.3 Whatarethelikelyimpactsofthe
proposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
Theprojectbeingawellplannedactivitywillresultin organized open spaces and green areas. Thebiodiversity in the area will increase due toproposedgreenareas.Communitycumrecreationalfacilitieswillbedevelopedhencenostressontheexistingfacilityisanticipated.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themainreasonsforerosionareoverexploitationofgroundwater,instableslopes,landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas,whichwouldreduce thechancesoferosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
Theproposeddevelopmentisplannedinsuchamannerthatitwillnotaltertheexistingdrainagepatternofthearea.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 15
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
Cuttingandfillingforconstructionactivity arebalanced,sonotransportationofearthwillberequired
1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.
SupplySource:NIT,Existingwell
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
Nowetlandsandlow‐lyingareasonthesite.
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazard.Minorquantityofconstructiondebriswillbegeneratedwhichwillbesentoutside.
2. WATERENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreak‐upofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
EnclosedasANNEXUREIVSOURCE:NIT,Existingwell
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
TheproposedwaterdemandwillbemetfromNIT,Existingwell
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
Waterwillbesourced:NIT,Existingwell
2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesand
TreatedwaterfromSTPwillbeusedforflushingintoiletandgardeningTotalsewagegenerated 311 KLDTotalSTPcapacity 325 KLD
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 16
usage)
Treatedwaterrecycledforflushing
112 KLD
Treatedwaterforgardening 15 KLDSludgegenerated 3 KLDExcesstreatedwater 180 KLD
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total sewage of about 311 KLD will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatmentParameters Values UnitspH 7‐8 mg/lBOD 250‐300 mg/lCOD 450‐600 mg/lO&G/ABS 10‐20 mg/lTSS 100‐200 mg/lMitigation measures: Domestic Effluent will betreated in the SewageTreatment plant of capacity325m3. The treated sewage water will be reusedforflushingandgardening.
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
Theprojectactivityshallhaverainwaterharvestingonly of rainfall on terraces.Surface rainwaterwillbeconnectedtothestormwaterdrainagesystem
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
ProposeddevelopmentisintunewithD.PofNITTheprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 17
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasNIT,Existingborewell.Rainwaterharvesting schemewill bepracticed forgroundwater recharge, which will have a positiveimpactonthegroundwatertable.
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
Topreventdegradationandmaintainthequalityofwatersource,adequatecontrolmeasureshavebeenproposed to check the surface run‐off, as well asuncontrolledflowofwaterintoanywaterbody. Avoidexcavationduringmonsoonseason. Rainwater harvesting can serve as a solution towaterprobleminworstcasescenario.
Following methods can increase efficiency ofrainwaterharvestingandrecharginggroundwater. Catchdrainageall along theperipheryofplot topreventsurfacerunoff.
Reduceandfiltersurfacerunoff. Usevegetatedswalesanddepressions to reducerunoff.
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
Duringrainyseason,aftertherainfallsomepartoftherainwaterpercolates into thegroundand joinsground water table, a part is retained as soilmoisture, some part is lost in evapotranspirationand the remaining part overflows as stormwaterrunoff. The quantity of runoff reaching the sewersordrainsisconsiderableascomparedwithsanitarysewageTheprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcerned authority. So therewill not be problemofwaterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No, the deployment of construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soak pits. Solid waste will be disposed off inmunicipalwastedisposalsystem.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 18
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
The Sewage Treatment Plant (STP) is designed totreat the raw waste water generated fromResidentialbuildingSewagegeneration:311KLDTreatedwatertoberecycledforgardening:15KLDTreatedwaterrecycledforflushing:112KLD
2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.
Yes,dualplumbingwillbeprovided
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithitsuniquefeatures,ifany)
Thereisnosensitiveecosystempresentatsitethatwill be disturbed by the project, as existing landuseinsurroundingareaisResidential
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
About 3086.50 m2 of areas are provided for thedevelopment of Green belt in the premises. Thegreen belt will be developed for control ofpollutionandaestheticviewofthecomplex
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 19
5. AIRENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
TheProjectwillresult innegligible increase intheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic.Theproposedactivitywillnot result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM,NOX and COemissions are expected due to fuel combustion ingeneratorsets.
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
TotalParkingprovided:4wheelers:290nos.2Wheelers:1060nos.Bicycles:1060nos.
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.TheDGSetsshallbeaspertheguidelineslaiddownby EPR for specific noise emission standards.Measures shall be taken for reduction of noise byusingacousticenclosures.Noise emissions are expected from variousconstructionequipmentandmachinerybutwillnotresultinanimpact.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 20
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
The proposed land use of the site would beresidentialand will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganisedopenareas and landscapedareas are atthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Internal roads, footpaths/ pedestrian pathwayshavebeenplannedwithintheproposedcomplex
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites orartefactsarefoundnearthesitearea.
7. SOCIO‐ECONOMICASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majorityof the labourwillbe recruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Projectwill havepositive impact on localcommunities.
8. BUILDINGMATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterials
Yesthebuildingmaterialswithhighembodiedenergywillbeused.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 21
andtheirenergyefficiency)8.2 Transportandhandlingof
materialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill beused.Regularmaintenance ofthe equipments will be carried out. Theconstruction activities will be carried out duringthe daytime only. The workers exposed to highnoisegeneratingwouldbeprovidedwithearplugsearmuffs.AsperEnvironmentalManagementPlan.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Fly ash in cement concrete. Typically 20‐ 25%offlyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Solidwastegenerated:1235kg/day
9. ENERGYCONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.TotalEnergyConsumption
764 kW
DGSetCapacity 200 kVA9.2 Whattypeof,andcapacityof,
powerback‐uptoyouplantoprovide?
DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.Total 200 kVA
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
Reflective+A12+6mmdoubleglazing
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such away that solar light can be utilised maximum fordaytime.
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 22
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas suchas/openspaces/commonarea/pathways/RG/etcSolarhotwatersystemswillbeprovided
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Yes.Shadinghasbeeneffectivelyusedtoreducethecoolingloads.
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes. The rooms will be so dimensioned thateffectiveairconditioningcanbecarriedout.Publicareas will be cooled by natural ventilation. Thedesign of the buildingwill be such that maximumuse of natural ventilation can be achieved. Thewalls, roofs and openingswill be so designed thatinfluxofheatisminimum.
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heatemission from theproposedconstruction canbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheatgeneratedwillnotbesignificantandwillbedissipated in the lushgreensandopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/CRoof 0.409 Watts/hr/m2/C
Wall 0.44 Watts/hr/m2/C
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedprojectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 23
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall comprise of hydrantsystemandportableextinguishers.Smokedetectorswill be provided along with manual call points.Externalyardhydrantsshallbeinstalledaroundallbuildings in the complex in galvanized steel firehose cabinet (weather proof). All external yardhydrantsshallbeatonemeterheightfromfinishedgroundlevelasperNationalBuildingCode.Externalfirehydrants shall be located such that noportionofanybuilding ismore than45m fromahydrant,and the external hydrants are not vulnerable tomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat
thewindowsaresealed,willbeprovided. Summer cross section ventilation will be
maximum.9.13 Towhatextentthenon‐
conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
EnclosedasAnnexureV
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 24
ANNEXUREIAreaStatement
Sr.No. Details m2
1 F.S.IArea 32,384.1212 NonF.S.IArea 16,435.503 TotalConstructionArea 48,819.63
Details of the layout Sq. Mt.
Total land as per 7/12 abstract 30800.000Total land as per K‐Prat abstract 30800.000Land under layout (Gross Area) 30800.000
For Group Housing Area StatementArea of land as per 7/12 30800.000Minimum area of land as per K‐prat 30800.000Gross Area Under Layout 30800.000 100.000%Area under open space 3086.500 10.021%Area under Amenity space 3121.264 10.134%Area under service road/ road widening, as per clause 24.1 0.000
NA1 ‐ Net plot area for layout @ 90% of area excluding amenity space, & area for road widening and service road as per clause 24.1, from Gross area under layout, as per clause 13.4.1 of SDCPR = 90% (30800 ‐ (3121.264+0.00) sqmt. = 90% (3800‐3121.264)=90% 27678.736 sqmt. =
24910.863
NA2 ‐ Area under D.P. / R.P. Roads + Area for road widening and service road as per clause 24.1
0.000
NA = Net Plot Area = NA1 + NA2 24910.863
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur
ANNEXUREIIConceptualPlan
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 26
ANNEXUREIIILocationPlan
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 27
ANNEXUREIV
WaterBalanceStatement
*BasisforwatersupplyistakenfromBIS:NationalBuildingCodeofIndia2005:Part9Page19
Particulars No of Flats /rooms /Cars Occupancy Total
Population
Water Requirement
Basis (in lpcd)*
Total Water Requirement/
person
Water Demand KLD
Domestic Flushing Residential Wings 488 5 2,440 90 45 135 329
Shops 26 3 78 15 30 45 4
Total 333 Swimming pool 1 Total 2,518 334
Sewage Generation
90 % of Domestic & 100 % of Flushing Requirement 311
Sludge 1 % of Sewage Generation 3
Recycling for Flushing
Residential Wings 488 5 2,440 45 45 110
Shops 26 3 78 30 30 2 Total 2,518 112 Recycling for Gardening 3,086.50 5l/m2 15Total Recycled Water 128Excess Treated Water 180
-
ApplicationformforEnvironmentalClearanceProjectName:ProposedProjectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 28
ANNEXUREVEnvironmentalManagementPlanduringConstructionPhase
Sr.No.
EnvironmentalComponents PredictedImpacts ProbablesourceofImpact MitigationMeasures Remarks
CONSTRUCTIONPHASE1. AmbientAir
QualityNegativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise Negativeimpactnearnoisegenerationsourcesinsidepremises.Nosignificantimpactonambientnoiselevelsinthesurroundingarea.
NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets
Useofwellmaintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.
Temporaryimpactsduringconstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.
3. Water Nosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,wastefromlabourcamp.
Reutilizationandrecyclingofconstructiondebris
Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. Aesthetics Minornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
-
ApplicationformforEnvironmentalClearance ProjectName:ProposedProjectatNagpur
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 29
EnvironmentalManagementPlanDuringFunctionalPhaseSr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact MitigationMeasures Remarks
FUNCTIONALPHASE
1. AmbientAirQuality MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
UseoflowsulphurgoodfuelPeriodicmaintenanceofDGsetsUseofCNG/LPGasafuelshouldbeencouraged.
DGsetswillbeused.
2. Noise Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsetsinbuildingswithappropriateacoustics.TrafficmanagementmeasurestoreducenoiseAppropriatetreeswhichwillactasnoisesbarrierswillbeplantedinthepremisesandalongroadside.
‐‐
3. Water Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater
Sewagewaterwillbetreatedandrecycled.Rainwaterharvestingandrechargeofgroundwateraquiferisproposed.Goodhousekeepingandstormwatermanagementwillbefollowed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. Land Nonegativeimpact
Storageanddisposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.
Treatmentandreuseofsewagewater.IntegratedwastemanagementandspillcontrolplanDrygarbagewillbesentforrecyclingandwetgarbagewillbecomposted.
Segregationofdryandwetgarbagebeforewillbedonebeforedisposal.
5. Biological OverallPositiveimpact
Habitatdisturbance Greenspacesinsidethepremiseswillhelptocompensatetheearliereffectfromvegetation.Landscapingandextensiveplantationinthepremises.
Landscapingwillhelpinreducinganyadverseimpactsonairandnoisequality.
6. Socio‐economic Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐ Positiveandlongtermimpact‐
7. TrafficPattern NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
TrafficManagementpractiseswillbeemployed.Adequateparkingspacewillbeprovidedinthepremises.