R. Assmann for the LHC MD coordination team
(R. Assmann, Frank Zimmermann, Giulia Papotti)LPC, 03.10.2011
R. Assmann
Schedule
4.10.: Discussion in LSWG with input/clarifications/requests from MD teams (round-table)
5.10.: Discussion of draft list in LMC
Week 2.10.-8.10.: Large pile-up MD. Floating MD #1: 25ns setup
Week 9.10.-15.10.: Floating MD #2: 25ns setup
18.10.: Discussion in LSWG with detailed presentations from MD teams. Start MP procedure.
19.10.: Discussion in LMC. Approval of plan for MD#4.
MD#4: Oct 30, 6am - Nov 4, 6am.
R. Assmann03/10/2011
Introduction
Scheduled 168h of more MD time in 2011: 120h in MD block #4. 48h in floating MD‘s (scheduled during physics run).
We could have scheduled another 230h (see list) and more (in your requests that we already reduced)...
Not everything can be done! We will also have MD time in 2012! Will ask for new requests
for next year, which should take into account results achieved in 2011.
All this depends on your input to us!
R. Assmann03/10/2011
Present Draft List (to be discussed this week)
R. Assmann03/10/2011
Short MD description Time Time from MD#4
Time from floating MD
[h] [h] [h]
Theme: Running with 25ns or 50ns?
Large Pile-Up (from MD3, on physics time) (3.5TeV) 9 0 025ns: injection + ADT set-up (450GeV) 12 0 1225ns: setup up to ≥48b, quality check, ramp 24b, squeeze, collision, SB (3.5TeV) 12 0 1225ns: 450GeV, observation, e-cloud (450GeV) 4 4 025ns: ramp 48b, squeeze, collide, LR beam-beam test, scraping test for beam shape (3.5TeV) 8 8 0Theme: Operational efficiency, new working points, preparation for ions Ions: p-Pb test, rephasing, radial loop (450GeV) 16 16 0Combined ramp and squeeze (3.5TeV) 8 8 0Beam instrumentation (3.5TeV) 8 8 0Tune working points: integer to half-integer (450GeV) 8 8 0TDI vacuum issues (450GeV) 8 8 0
Theme: Machine analysis, future upgrades
Injection stability and losses for HW upgrades (LIU) (450GeV) 8 0 8ATS optics dry run (HL-LHC) (3.5TeV) 3 0 3ATS pre-squeeze to 0.4m and tight collimation settings (LHC) (3.5TeV) 10 10 0ATS squeeze to 0.1m in IR1 and IR5 (HL-LHC) (3.5TeV) 6 6 0Quench margin at injection (LHC) (450 GeV) 4 4 0Quench margin at 3.5 TeV (HL-LHC) (3.5TeV) 8 8 0Longitudinal RF stability (LHC) (3.5TeV) 8 8 0Large Piwinsky Angle (HL-LHC) (450GeV) 8 0 8Non-linear dynamics (LHC) (450GeV) 8 8 0
Overhead/Reserve 21 16 5
Total 177 120 48Available 120 48
This week
To be moved to regular MD?
Present Draft List
R. Assmann03/10/2011
Short MD description Time Time from MD#4
Time from floating MD
[h] [h] [h]
Theme: Running with 25ns or 50ns? Large Pile-Up (from MD3, on physics time) (3.5TeV) 9 0 025ns: injection + ADT set-up (450GeV) 12 0 1225ns: setup up to ≥48b, quality check, ramp 24b, squeeze, collision, SB (3.5TeV) 12 0 1225ns: 450GeV, observation, e-cloud (450GeV) 4 4 025ns: ramp 48b, squeeze, collide, LR beam-beam test, scraping test for beam shape (3.5TeV) 8 8 0
Theme: Operational efficiency, new working points, preparation for ions
Ions: p-Pb test, rephasing, radial loop (450GeV) 16 16 0Combined ramp and squeeze (3.5TeV) 8 8 0Beam instrumentation (3.5TeV) 8 8 0Tune working points: integer to half-integer (450GeV) 8 8 0TDI vacuum issues (450GeV) 8 8 0
Present Draft List
R. Assmann03/10/2011
Short MD description Time Time from MD#4
Time from floating MD
[h] [h] [h]
Theme: Machine analysis, future upgrades Injection stability and losses for HW upgrades (LIU) (450GeV) 8 0 8ATS optics dry run (HL-LHC) (3.5TeV) 3 0 3ATS pre-squeeze to 0.4m and tight collimation settings (LHC) (3.5TeV) 10 10 0ATS squeeze to 0.1m in IR1 and IR5 (HL-LHC) (3.5TeV) 6 6 0Quench margin at injection (LHC) (450 GeV) 4 4 0Quench margin at 3.5 TeV (HL-LHC) (3.5TeV) 8 8 0Longitudinal RF stability (LHC) (3.5TeV) 8 8 0Large Piwinsky Angle (HL-LHC) (450GeV) 8 0 8Non-linear dynamics (LHC) (450GeV) 8 8 0
Overhead/Reserve 21 16 5
Total 177 120 48Available 120 48
Received Requests: Not Scheduled I
Short MD description Time[h]
Beam-Based Measurement of the Waveform of the LHC Injection Kickers 6
Improving Collimator Setup Speed at 3.5 TeV 8
Measurement combined cleaning efficiency 8
Crossing schemes 24
Instability and transverse impedance 24
Quench test at 1.38 TeV 5
Wire breakage with ion beams 2
Q' decay vs powering history 17
R. Assmann03/10/2011
Received Requests: Not Scheduled II
Short MD description Time
[h]UFO's at MKI's 8Quench test with wire scanner 8Collimation scraping 8Tight collimator settings: orbit control 12
Commissioning 1T feedback 8Rephasing tests (RF) 4Movements of the inner triplet with beam at injection 8
TCDQ alignment and TCT transmission during asynchronous dump 8
R. Assmann03/10/2011
Received Requests: Not Scheduled III
Short MD description Time[h]
Transverse noise 8Tune scane WP 8Beam loss measurements with different collimator settings 16
Alignment and protection of long absorbers (can be done 2012) 845 degree crossing at LHCb (25ns) 16
Transfer and injection of Q20 beam into LHC (first part can be done in shadow if LHC down) 825ns studies 8
Total 230R. Assmann03/10/2011
Present Draft List
R. Assmann03/10/2011
Short MD description Time Time from MD#4
Time from floating MD
[h] [h] [h]
Theme: Running with 25ns or 50ns? Large Pile-Up (from MD3, on physics time) (3.5TeV) 9 0 025ns: injection + ADT set-up (450GeV) 12 0 1225ns: setup up to ≥48b, quality check, ramp 24b, squeeze, collision, SB (3.5TeV) 12 0 1225ns: 450GeV, observation, e-cloud (450GeV) 4 4 025ns: ramp 48b, squeeze, collide, LR beam-beam test, scraping test for beam shape (3.5TeV) 8 8 0
Theme: Operational efficiency, new working points, preparation for ions
Ions: p-Pb test, rephasing, radial loop (450GeV) 16 16 0Combined ramp and squeeze (3.5TeV) 8 8 0Beam instrumentation (3.5TeV) 8 8 0Tune working points: integer to half-integer (450GeV) 8 8 0TDI vacuum issues (450GeV) 8 8 0
Present Draft List
R. Assmann03/10/2011
Short MD description Time Time from MD#4
Time from floating MD
[h] [h] [h]
Theme: Machine analysis, future upgrades Injection stability and losses for HW upgrades (LIU) (450GeV) 8 0 8ATS optics dry run (HL-LHC) (3.5TeV) 3 0 3ATS pre-squeeze to 0.4m and tight collimation settings (LHC) (3.5TeV) 10 10 0ATS squeeze to 0.1m in IR1 and IR5 (HL-LHC) (3.5TeV) 6 6 0Quench margin at injection (LHC) (450 GeV) 4 4 0Quench margin at 3.5 TeV (HL-LHC) (3.5TeV) 8 8 0Longitudinal RF stability (LHC) (3.5TeV) 8 8 0Large Piwinsky Angle (HL-LHC) (450GeV) 8 0 8Non-linear dynamics (LHC) (450GeV) 8 8 0
Overhead/Reserve 21 16 5
Total 177 120 48Available 120 48
Discussion
What should NOT be done and what MUST still be done in 2011? Scheduled 168h of more MD time in 2011. We could have scheduled another 230h (see list) and more (in your
requests that we already reduced)...
R. Assmann03/10/2011
Thank you...
R. Assmann03/10/2011
Scheduled & not yet scheduled MD Requestsstatus August 2011
times in hours (incl. possible ramp down) allocated in:1st MD block2nd MD block3rd MD block
Appendix 1 – MD List (Status Aug. 2011)
8/22/2011 R. Assmann 14
MD title Requester # MD's Total time
2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
45 degree crossing at LHCb (25ns)
W. Herr and T. Pieloni
2 0 163500 physics LHC
nominalRA, GP
Beam-Beam LimitsW. Herr and T. Pieloni 5 40 0 450, 3500 5e12
LHC nominal RA, GP
Crossing SchemeF. Zimmermann, R. Calaga, W. Herr and T. Pieloni 2 0 24 450, 3500 1.7e13 HL-LHC SR, RA, GP
Large Piwinski Angle (LPA)
S. Fartoukh, F. Zimmermann
2 8 8 450 3e11 HL-LHC SR
Transverse noise, coherent beam-beam instability and beam-beam emittance growth W. Herr and T. Pieloni 1 8 0 3500 5e12
LHC nominal RA, GP
Operation tune close to half-Integer R. Calaga, W. Herr, T.
Pieloni, R. Steinhagen 2 0 16 450, 3500 1e12 HL-LHC RA, GPTune scan for beam-beam optimization, lifetime and losses
W. Herr, T. Pieloni, R. Assmann, R. Steinhagen 2 8 8 450, 3500 6e12
LHC nominal +
HL-LHC RA, GP
beam-beam MD’s
total: 134 h
6 (EOF)
8+17+16
1
8
8/22/2011 R. Assmann 15
optics MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
ATS S. Fartoukh6 24 24 450, 3500 1e10 HL-LHC SR
Un-squeeze to 90 m Helmut Burkhardt 1 8 0 3500 1e10Commissioning
leftover SR
Emittance growth. Life-time and emittance dependence on chromaticity at 450 and 3.5 TeV
R. Steinhagen, F.Roncarolo, V.Kain, B. Goddard 2 8 0 450, 3500 2e13 LHC nominal VK
Non-linear dynamics studies: various studies. Measurement of single-particle dynamic aperture F. Schmidt, M.
Giovannozzi 3 8 16 450, 3500 1e10 LHC nominal SR
Collision tunes at injection and ramp R. Tomas 1 6 0 450 1e10 LHC nominal SR
Single beam parameter evolution G. Papotti 1 4 0 3500 1.15e11 LHC nominal GP
total: 98 h
14+1410
8
12
8/22/2011 R. Assmann 16
e-cloud MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 36 h
Intensity limitations from electron cloud in the LHC G. Arduini 1 36 36 450 3e14
Commissioning leftover x
7mC priority
8/22/2011 R. Assmann 17
operational MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 12 h
Combined ramp and squeeze S. Redaelli 2 6 6 450, 3500 1e10
Commissioning leftover SR
8/22/2011 R. Assmann 18
IR MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 32 h
Movements of the inner triplet with beam at injection S. Redaelli 1 0 8 450 1e10
Commissioning leftover SR
BPM offset determination for triplet BPMs J. Wenninger 2 16 0 450 1.2e11 LHC nominal x
Triplet aperture measurements at 3.5 TeV S. Redaelli 1 0 8 3500 1e10
Commissioning leftover SR
8
10
8/22/2011 R. Assmann 19
injection & injection protection MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
Beam based alignment issues with long protection devices, injection losses & mitigation in other beam
Wolfgang Bartmann and Chiara Bracco 2 8 8 450
1.2e11 and 1.5e13
Commissioning leftover VK
TCDQ alignment and TCT transmission during asynchronous dump
Wolfgang Bartmann and Chiara Bracco 1 8 0 450
pilot beam (beam 2)
Commissioning leftover VK
Injection studies for different SPS beam parameters
Brennan GODDARD 2 16 0 450
1.2e13, 144 bunches at
25 ns LIU VK
Injecting nominal emittanceLene Drosdal 1 9 0 450
12, 36 bunches LHC nominal VK
Transverse blow-up, longitudinal blow-up and SPS scraping and injection losses Verena Kain 1 8 0 450 1.3e11 LIU VK
Detailed injection matching studies
Malika Meddahi
2 6 6 450 1.3e11 LHC nominal VK
Beam-Based Measurement of the Waveform of the LHC Injection Kickers
Mike BARNES 1 6 0 450 1e10
Commissioning leftover x
MKI UFOs at injectionT. Baeer, J. Uythoven 1 8 0 450
up to 1.5e14 LHC nominal x
sensitivity of injection quality & injection protection to TL steering
Verena Kain, Lene Drosdal, 1 12 0 450
1-12 b at 50 ns, at
~1.2e11 LHC nominal x
transfer and injection with SPS Q20 optics
Wolfgang Baartmann, 2 16 0 450
1e10-3e11, single to 36, 1-4 batches LIU x
8
6+7
9
total: 111 h
(4+)10
8/22/2011 R. Assmann 20
collimation MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 72 h
Scraping scans for beam shape
Daniel Wollmann, Daniel Deboy, Florian Burkart 1 8 0 450, 3500 3e11
LHC nominal + HL-LHC SR
Improving Collimator Setup Speed at 3.5 TeV
Gianluca Valentino
2 8 8 3500 1.2e11 LHC nominal SR
Nominal and tighter collimation settings, single bunch tune shift
R. Assmann, B. Salvant, N. Mounet, E. Metral 2 16 0 3500 3e11
LHC nominal + HL-LHC SR
Feasibility test beta*=1 m
R. Bruce, R. Assmann
1 8 0 3500 pilot LHC nominal SR
Beta* reach from collimation
Roderik Bruce
2 8 8 3500 1e12 LHC nominal SR
combined cleanup 1 5 LHC nominal SR
BLM quench threshold test at 3.5 TeV in the DS of IR7 S. Redaelli, R. Assmann 2 16 0 3500 1e13 LHC nominal SR
10
10+10
45
5
10mC priority
8/22/2011 R. Assmann 21
MD’s on passive protection for stored beamMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 16 h
Beam loss measurements with different collimator settings (TCTs, TCLAs, …), TCDQ/TCSG/TCT protection levels and tolerance Adriana Rossi, Chiara
Bracco 2 8 8 450 1.5e11 LHC nominal VK, SR
8/22/2011 R. Assmann 22
impedance MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 48 h
Coupled-bunch instability rise times at injection&flat top and stabilization by Landau octupoles, with collimators N. Mounet, E. Metral,
collimation team 3 16 8 3500 6e13LHC nominal + HL-
LHC SR
Multi-bunch tune shift at 450 GeV and 3.5 TeV, with collimators N. Mounet, E. Metral,
collimation team 3 16 8 450, 3500 6e13LHC nominal + HL-
LHC SR
10
(5?)
8/22/2011 R. Assmann 23
R2E MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 8 h
Slow controlled losses for RadMon application benchmark M. Calviani (EN/STI) 1 8 0 450 1e10 LHC nominal MP
8
8/22/2011 R. Assmann 24
instrumentation MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 31 h
Optimization of BGI parameters Mariusz Sapinski 4 4 0 450 1e11
Commissioning leftover x
BSR studies at 1.38 TeV F. Roncarolo 2 2 0 1380 2e13Commissioning
leftover MP
Continuous beta-beat measurement at injection and squeezed optic Ralph Steinhagen 1 0 8 450, 3500 7e12 LHC nominal x
Quench Test at 1.38 TeV Agnieszka Priebe 1 5 0 1380 1.2e11 LHC nominal x
Quench test with wire scanner Mariusz Sapinski 1 2 0 3500 1e14 LHC nominal x
Cross calibration of BSRT/WS/BGI F. Roncarolo 2 2 0 450, 3500
>1e10 & <2e13 LHC nominal MP
High bunch intensity F. Roncarolo 1 8 450, 3500 LHC nominal
direct-dump BLM calibration, new BPM firmware, stripline crosstalk, BCT/FBCT, BSRT. BSRA, Schottky, emittance vs Q' F. Roncarolo 1 8 4,503,500
1-24 bunches, 0.5e10 to
1.3e11 LHC nominal x
10
10
8/22/2011 R. Assmann 25
RF MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
RF noise induced beam diffusion E.
Shaposhnikova 4 8 8 450, 3500 1e12
LHC nominal + Commissioning
leftover GP
Synchronous phase shift E. Shaposhnikova 4 8 8 450 1e13
Commissioning leftover GP
Longitudinal beam stability E. Shaposhnikova 3 8 4 450, 3500 1e12 LHC nominal GP
long bunch length E. Shaposhnikova 1 8 0 450, 3500 1e12 LHC nominal GP
RF feedback optimization with circulating beam P. Baudrenghien 4 8 8 450, 3500 1e12
Commissioning leftover x
Longitudinal damper commissioning P. Baudrenghien 2 8 0 450 5e12
Commissioning leftover x
Voltage (capture/ramp/Physics) and Blow-Up Optimization P. Baudrenghien 3 12 6 450, 3500 1.3e13
Commissioning leftover GP
1-T feedback commissioning P. Baudrenghien 3 8 4 450, 3500 6e13
Commissioning leftover x
Rephasing P. Baudrenghien 3 8 4 3500 5e12Commissioning
leftover GP
Controlled transverse blowup
R. Schmidt, W. Hoefle, S. Redaellie 1 6 0 450 safe beam
Commissioning leftover SR
total: 124 h
8+1010
68
as operational development
8/22/2011 R. Assmann 26
ion MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 26 h
Feasibility of p-Pb operation John Jowett 3 24 0 450 p, ion LHC ions x
Wire Breakage with ion beam Mariusz Sapinski 1 2 0 450, 3500
50 nom ion b LHC ions x
not ready?
8/22/2011 R. Assmann 27
experiment MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 12 h
maximum pile up in single bunches Physics coordinators 1 6 0 3500
2 bunches with ~2e11 LHC nominal x
25-ns test run with physics Physics coordinators 1 8 0 3500
a few trains with 25-ns
spacing LHC nominal x
6
in MD block 4?
mC priority
8/22/2011 R. Assmann 28
magnet MD’sMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
total: 41 h
Investigation on CODs Nuria 1 8 0 450 1e11 LHC nominal
RQ6.L8 quench limit investigation
Chiara Bracco, Rudiger Schmidt, Matteo Solfaroli 1 8 0 450
1e10, 2e10, 3e10 LHC nominal
quench margin at injection
Rudieger Schmidt, Brennan Goddard, Mariusz Sapinski 2 8 0 450 3e9-1.2e11 LHC nominal
Q' decay vs powering history Ezio Todesco 1 17 0 450, 3500
probe bunch, 1e10 LHC nominal
6
6+4
not in MD
8/22/2011 R. Assmann 29
EOF studiesMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
Transverse noise, coherent beam-beam instability and beam-beam emittance growth W. Herr and T. Pieloni 4 EOF 4 3500 5e12 LHC nominal RA, GP
TCP alignment test for different orbit settings S. Redaelli 3 EOF 6 3500 4e13 LHC nominal SR
Halo scrapingDaniel Wollmann, Daniel Deboy, Florian Burkart 16 EOF 8 450, 3500 physics LHC nominal SR
Debunched beam following klystron trip P. Baudrenghien 4 EOF 8 3500 physics
LHC nominal + Commissioning
leftover GP
Emittance from lumi scan (eof, many) G. Papotti 0 0 3500 physics LHC nominal GP
Tight collimator settings for beta*=1 m at high intensity S. Redaelli 1 2 3500 physics LHC nominal
8/22/2011 R. Assmann 30
operational development studiesMD title Requester # MD's Total
time 2010 [h]
Total time
2011 [h]
Energy Max Intensity
Theme OP link
beta*= 1 m w/o beam M. Lamont? 1 4 3500 no beam LHC nominal SR
beta*=1 m with beamM. Lamont?, R. Tomas? 1 8 3500 pilot LHC nominal SR
SPS Q20 extraction to downstream TED (w/o LHC) W. Bartmann, H.
Bartosik 1 8 450 LIU VK?
8/22/2011 R. Assmann 31