Download - Final Regulation Workshop
![Page 1: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/1.jpg)
1
Final Regulation Workshop
California’s Electronic Waste Recycling Program
November 2006
CIWMB Electronic Waste Recycling Program
www.ciwmb.ca.gov/electronics www.eRecyle.org
![Page 2: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/2.jpg)
2
Electronic Waste Recycling Act of 2003
• Advance recycling fee (ARF) on retail sales of covered electronic devices • Recovery / recycling payments to qualified handlers of covered electronic wastes (CEWs)• Manufacturer requirements:
–labeling, reporting –product design: ROHS–consumer information
• State purchasing guidelines: EPP• Statewide public education campaign
![Page 3: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/3.jpg)
3
Statutory & Regulatory History
• SB 20 – October 2003– Initial emergency regs April 2004
• SB 50 – September 2004– Revised emergency regs November 2004
• Program start – January 2005– Revised emergency regs November 2005
• Final rulemaking – 2006 – Final regulations adopted by CIWMB July 2006– Final regulations approved by OAL November 27th
![Page 4: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/4.jpg)
4
CEW Payment System at a Glance
Consumer RetailerFee paidat purchase
Remits fee (Quarterly)
Deposits fee
Program Implementation
Permitting+ Inspections
Fee Collection
Recycling payment(48¢/lb)
Recovery payment(20¢/lb)
IWMB
DTSC
BOE
Recyclers Collectors
E-Waste Account
USED item recycled as “E-Waste”
NEW itempurchased
E-Waste
Electronics
$$
Payment Claim
![Page 5: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/5.jpg)
5
CEW Collectors and Recyclers
• CIWMB collaborates with DTSC on approvals
• Requires appropriate notification, authorization, and/or inspections
• ~500 approved collectors
• ~50 approved recyclers / dual entities
• CIWMB pays recyclers; recyclers pay collectors
![Page 6: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/6.jpg)
6
CEW Payment System Volumes
• Activities began January 1, 2005
•2005 volumes:–$31M (65M lbs) in claims received
• 2006 volumes thus far:–$44M (91M lbs) in claims received
![Page 7: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/7.jpg)
7
Program Growth Since Inception
![Page 8: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/8.jpg)
8
Looking Ahead
• Net Cost Reports due March 1, 2007–Web-based training slated for January
• DTSC determines what is a CED/CEW–NEW starting July 2007 – portable DVD players
•Statewide promotion www.eRecycle.org –Objective: awareness, convenience
![Page 9: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/9.jpg)
9
![Page 10: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/10.jpg)
10
Looking Ahead
• Deploy Audit Functions–Assistance with net cost reports–Standardize data tracking–Compliance, enforcement & fraud minimization
• Next Rulemaking...? –You can always build a better mousetrap
![Page 11: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/11.jpg)
11
So, What’s New in the Final Regs?
• New & revised definitions• Limitations on CEWs from illegal disposal• Limitations on recovery payments• Future Net Cost Report flexibility• Certification of regulatory awareness• Maintenance of in-state location• Expanded prohibitions• Ability to suspend participants
![Page 12: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/12.jpg)
12
So, What’s New in the Final Regs?
• Enhanced collection documentation • Inventory tracking requirements• Weighmaster requirement for recyclers• More detailed transfer records• Glass shipment from all claimed CEWs• Refined claim reporting • Claim review standards
![Page 13: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/13.jpg)
13
So, What’s New in the Final Regs?
• Let’s take a closer look…– Please refer to the regs themselves:– www.ciwmb.ca.gov/rulemaking/EWaste/
![Page 14: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/14.jpg)
14
Revised Forms and Documents
• Available on websitewww.ciwmb.ca.gov/Electronics/Act2003/Recovery/Application/
• Application (186)
• Proof of Designation
• Collection Logs (198, 198SA)
• Transfer Receipts, Summary (197, 197S)
• Claim Forms and Worksheets (196, 196A, 196B)
![Page 15: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/15.jpg)
15
Chronic Challenges
Or, how we see the world…
• Collection Logs–Incomplete documentation–Superfluous documentation–Secondary logs from unapproved handlers–Illegibility (unreadable)–Alterations
![Page 16: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/16.jpg)
16
Chronic Challenges
•Transfer Documentation–Incomplete transfer packages (missing logs)–Missing signatures–Missing certified weights (tickets)–Inefficient use of transfer receipts–Illogical dates
•Transfers before collection
•Transfers after cancellation
![Page 17: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/17.jpg)
17
Chronic Challenges
•Cancellation documentation–Dubious links between received material and cancellation activities–Mass balance discrepancies
•New regs require better inventory tracking
![Page 18: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/18.jpg)
18
Chronic Challenges
•Claim Preparation and Submittals–Premature claim reports
•No glass shipments
•Receipts not yet secured from shipping/destinations
–Incomplete claim packages•Missing Collection Logs, Transfers Docs, etc
•Clarity of residuals disposition – BOLs, etc
![Page 19: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/19.jpg)
19
Chronic Challenges
•Claim Packages–Disorganized–Deficient–Superfluous
…a claimant is signing, attesting to completeness and accuracy; it should be!
•If you have questions, please ask!
![Page 20: Final Regulation Workshop](https://reader035.vdocuments.us/reader035/viewer/2022070418/568159a6550346895dc70802/html5/thumbnails/20.jpg)
20
What Can We Do To Help You?
•Information?
•Guidance?
•Tools?