Total Total Productive Productive MaintenancMaintenanc
ee
![Page 2: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/2.jpg)
Group MembersGroup Members
Yogesh Kamat 42Priyanka Kamath 43Trupti Kapadia 44Ajinkya Lavate 49
![Page 3: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/3.jpg)
What is Total Productive What is Total Productive Maintenance ( TPM ) ? Maintenance ( TPM ) ? • Total Productive Maintenance (TPM) is a maintenance program which involves a newly defined concept for maintaining plants and equipment.
•The goal of the TPM program is to markedly increase production while, at the same time, increasing employee morale and job satisfaction.
•TPM brings maintenance into focus as a necessary and vitally important part of the business.
•It is no longer regarded as a non-profit activity.
![Page 4: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/4.jpg)
Why TPM ? Why TPM ? TPM was introduced to achieve the
following objectives. The important ones are listed below.
i. Avoid wastage in a quickly changing economic environment.
ii. Producing goods without reducing product quality.
iii. Reduce cost. iv. Produce a low batch quantity at the
earliest possible time. v. Goods send to the customers must
be non defective.
![Page 5: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/5.jpg)
Types of maintenance :Types of maintenance :
![Page 6: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/6.jpg)
Types of maintenance :Types of maintenance :
1. Breakdown maintenance : It means that people wait until equipment
fails. and repair it.When failure occurs , repair it .
ExampleReplace light switches when they fail.
Use whenBreakdown cost is low.Components are cheap.Replacement is easy . Inspection is difficulty.
![Page 7: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/7.jpg)
Types of maintenance :Types of maintenance :
2. Preventive maintenance:• It is a daily maintenance ( cleaning,
inspection, oiling and re-tightening ), design to retain the healthy condition of equipment and prevent failure through the prevention of deterioration. Just like human life is extended by preventive medicine, the equipment service life can be prolonged by doing preventive maintenance.
Example• Inspect for visible cracks while lubricating.
Use when• Inspection is easy • Incipient failure is evident before actual
failure.• Wearout highly variable.
![Page 8: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/8.jpg)
Types of maintenanceTypes of maintenance
2a. Periodic maintenance ( Time based maintenance - TBM) :
Time based maintenance consists of periodically inspecting, servicing and cleaning equipment and replacing parts to prevent sudden failure and process problems.
![Page 9: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/9.jpg)
Types of maintenanceTypes of maintenance
2b. Predictive maintenance :This is a method in which the service life of
important part is predicted based on inspection or diagnosis, in order to use the parts to the limit of their service life. Predictive maintenance is condition based maintenance. It manages trend values, by measuring and analyzing data about deterioration and employs a surveillance system, designed to monitor conditions through an on-line system.
ExampleOverhaul aircraft engine after 5000 hours.Use whenWear out is predictable.Replacement is inexpensive.
![Page 10: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/10.jpg)
Types of maintenanceTypes of maintenance3. Corrective maintenance : It improves equipment and its components
so that preventive maintenance can be carried out reliably. Equipment with design weakness are redesigned to improve reliability or improving maintainability .
Example Motor starter size increased.Use whenFailure rate is high Inspection is difficult.
![Page 11: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/11.jpg)
Types of maintenanceTypes of maintenance4. Maintenance prevention : It indicates the design of a new equipment. Weakness of current machines are
sufficiently studied ( on site information leading to failure prevention, easier maintenance and prevents of defects, safety and ease of manufacturing ) and are incorporated before commissioning a new equipment.
![Page 12: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/12.jpg)
Procedure for introducing Procedure for introducing TPM in organisationTPM in organisation
Stage A - PREPARATORY STAGE Stage B - INTRODUCTION STAGEStage C - IMPLEMENTATIONStage D - INSTITUTIONALISING STAGE
![Page 13: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/13.jpg)
Stage A:Stage A: PREPARATORY PREPARATORY STAGE STAGE
STEP 1 - Announcement by ManagementSTEP 2 - Initial educationSTEP 3 - Setting up TPM and
departmental committeesSTEP 4 - Establishing the TPM working
system and targetSTEP 5 - A master plan for
institutionalizing
![Page 14: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/14.jpg)
Pillars of TPMPillars of TPM
![Page 15: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/15.jpg)
PILLAR 1 - 5S PILLAR 1 - 5S
TPM starts 5S.
SEIRI - Sort out SEITON - Organise SEISO - Shine the workplace SEIKETSU - Standardization SHITSUKE - Self discipline
![Page 16: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/16.jpg)
PILLAR 2 - JISHU HOZEN PILLAR 2 - JISHU HOZEN ( Autonomous maintenance ) :( Autonomous maintenance ) :
This pillar is geared towards developing operators to be able to take care of small maintenance tasks, thus freeing up the skilled maintenance people to spend time on more value added activity and technical repairs. The operators are responsible for upkeep of their equipment to prevent it from deteriorating.
![Page 17: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/17.jpg)
PILLAR 3 - KAIZEN :PILLAR 3 - KAIZEN :
Basically kaizen is for small improvements, but carried out on a continual basis and involve all people in the organization. Kaizen requires no or little investment. The principle behind is that "a very large number of small improvements are move effective in an organizational environment than a few improvements of large value. This pillar is aimed at reducing losses in the workplace that affect our efficiencies. By using a detailed and thorough procedure we eliminate losses in a systematic method using various Kaizen tools.
![Page 18: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/18.jpg)
PILLAR 4 - PLANNED PILLAR 4 - PLANNED MAINTENANCE MAINTENANCE
It is aimed to have trouble free machines and equipments producing defect free products for total customer satisfaction. This breaks maintenance down into 4 "families" or groups which was defined earlier.
1. Preventive Maintenance 2. Breakdown Maintenance 3. Corrective Maintenance 4. Maintenance Prevention
![Page 19: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/19.jpg)
PILLAR 5 - QUALITY PILLAR 5 - QUALITY MAINTENANCE MAINTENANCE
It is aimed towards customer delight through highest quality through defect free manufacturing. Focus is on eliminating non-conformances in a systematic manner, much like Focused Improvement. We gain understanding of what parts of the equipment affect product quality and begin to eliminate current quality concerns, then move to potential quality concerns. Transition is from reactive to proactive (Quality Control to Quality Assurance).
QM activities is to set equipment conditions that preclude quality defects, based on the basic concept of maintaining perfect equipment to maintain perfect quality of products. The condition are checked and measure in time series to very that measure values are within standard values to prevent defects. The transition of measured values is watched to predict possibilities of defects occurring and to take counter measures before hand.
![Page 20: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/20.jpg)
Policy :Policy :1. Defect free conditions and control of
equipments. 2. QM activities to support quality
assurance. 3. Focus of prevention of defects at source 4. Focus on poka-yoke. ( fool proof
system ) 5. In-line detection and segregation of
defects. 6. Effective implementation of operator
quality assurance.
![Page 21: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/21.jpg)
PILLAR 6 - TRAINING PILLAR 6 - TRAINING
It is aimed to have multi-skilled revitalized employees whose morale is high and who has eager to come to work and perform all required functions effectively and independently. Education is given to operators to upgrade their skill. It is not sufficient know only "Know-How" by they should also learn "Know-why". By experience they gain, "Know-How" to overcome a problem what to be done. This they do without knowing the root cause of the problem and why they are doing so. Hence it become necessary to train them on knowing "Know-why". The employees should be trained to achieve the four phases of skill. The goal is to create a factory full of experts. The different phase of skills are
Phase 1 : Do not know.Phase 2 : Know the theory but cannot do.Phase 3 : Can do but cannot teachPhase 4 : Can do and also teach.
![Page 22: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/22.jpg)
Steps in Educating and Steps in Educating and training activitiestraining activities
Setting policies and priorities and checking present status of education and training.
Establish of training system for operation and maintenance skill up gradation.
Training the employees for upgrading the operation and maintenance skills.
Preparation of training calendar.Kick-off of the system for training.Evaluation of activities and study of
future approach
![Page 23: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/23.jpg)
PILLAR 7 - OFFICE TPM PILLAR 7 - OFFICE TPM
Office TPM must be followed to improve productivity, efficiency in the administrative functions and identify and eliminate losses. This includes analyzing processes and procedures towards increased office automation. Office TPM addresses twelve major losses. They are
Processing loss Cost loss including in areas such as procurement, accounts,
marketing, sales leading to high inventories Communication loss Idle loss Set-up loss Accuracy loss Office equipment breakdown Communication channel breakdown, telephone and fax lines Time spent on retrieval of information Non availability of correct on line stock status Customer complaints due to logistics Expenses on emergency dispatches/purchases
![Page 24: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/24.jpg)
Benefits of Office TPMBenefits of Office TPM
Involvement of all people in support functions for focusing on better plant performance
Better utilized work areaReduce repetitive workReduced inventory levels in all
parts of the supply chainReduced administrative costsReduced inventory carrying cost
![Page 25: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/25.jpg)
PILLAR 8 - SAFETY, HEALTH AND PILLAR 8 - SAFETY, HEALTH AND ENVIRONMENT ENVIRONMENT
Target : Zero accident, Zero health damage Zero fires.
In this area focus is on to create a safe workplace and a surrounding area that is not damaged by our process or procedures. This pillar will play an active role in each of the other pillars on a regular basis.
A committee is constituted for this pillar which comprises representative of officers as well as workers. The committee is headed by Senior vice President ( Technical ). Utmost importance to Safety is given in the plant. Manager (Safety) is looking after functions related to safety. To create awareness among employees various competitions like safety slogans, Quiz, Drama, Posters, etc. related to safety can be organized at regular intervals.
![Page 26: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/26.jpg)
TPM in Insurance SectorTPM in Insurance Sector
TPM was introduced to achieve the following objectives. The important ones are listed below.
Avoid wastage in a quickly changing economic environment.
Producing services without compromising on quality.
Reduce cost.Services provided should satisfy customers.
![Page 27: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/27.jpg)
Marketing:Marketing:Need for alternate distribution channelsNeed to streamline traditional agent distribution
modelCore replacement of older legacy systems with
next generation insuranceStraight through payment processing of
premiums, claims, and reinsurance.Need to aggregate exposures and produce
single view of the client.Need to move IT accounting from capital
expense to operating expense
![Page 28: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/28.jpg)
New ChannelsNew ChannelsMicro InsuranceBanc AssuranceDirect Marketing – INTERNETDigital TV/Satellite SellingSupermarkets and other retail outletsAffinity Channels and GroupsInsurance specific debit/credit cardsCall Centres
![Page 29: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/29.jpg)
Labelling SystemLabelling SystemEvery item that is stocked or collected in
piles/bins/cabinets/racks must be labelled. The labels must be designed such that they follow the rules given below:
Label the Locations:easier for all employees to understand.
Use Visual Labels:Pictures are sometimes better than words
![Page 30: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/30.jpg)
Colour CodingColour CodingEasier to know where they belong and when
they are out of place. Department wise COLOR CODING for filesTime saverFollowing are certain colour codes that can be
followed:
![Page 31: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/31.jpg)
Filing StandardsFiling StandardsPrimary classification systems for filing.Critical to ensure that records are easily found
and refiled.
1. Alphabetic Filing Systems (a,b,c....z)
2. Numeric Filing Systems (1,2,3....n)
3. Alphanumeric Filing Systems (combination)
4. Department wise
5. Zone wise
6. Branch wise
7. Combination of above Filing Standards
![Page 32: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/32.jpg)
PokayokePokayokePoka yoke for files/ mistake proofing.Sticking a diagonal ribbon across the files. Advantage of this arrangement is that one can
tell at a glance if a file is missing or in wrong place. Moreover the files must be placed in ‘ascending order of usage’
![Page 33: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/33.jpg)
Data Recovery and Data Recovery and Backup Mechanism:Backup Mechanism:
1. The proposal forms are maintained in scanned format.
2. Email backup is maintained on tapes.
3. Disaster Recovery Server for maintaining all important tape information for future use.
Indexes allow easy retrieval of documents and files.
Type of indexes:
1) Master index gives the area in which the document is stored
2) Location index gives the exact co-ordinates of document location.
![Page 34: FINAL PPT OF SCM TR](https://reader033.vdocuments.us/reader033/viewer/2022061120/546c3c38b4af9f07628b4cbd/html5/thumbnails/34.jpg)
Training:Training:IRDA -100 hours of training
Training also imparted by insurance companies.
Agent attrition rate is as high as 70% and the productivity is approximately 1.5 policies per active agent per month.