QSF-V30 FILM PROCESSORINSTALLATION SPECIFICATIONS
Electrical 208 VAC Single phase 2.8kVA (15A)220 VAC Single phase 2.9kVA (14A)230 VAC Single phase 3.1kVA (14A)240 VAC Single phase 3.3kVA (14A)
2 wire feed plus separate ground wire.Sensible heat loss 6,390 @ 208 VAC ~ 6,890 @ 240 VAC B.t.u./hourOperating weightExternal dimensions ½" W x 50" H
Cooling water minute
Note:
550 Lbs.42" L x 21
Needs a minimum opening of 22" to move through a door or passage½ gallon per
Cooling water not used when room temperature kept at or below 85 F.
Note:
Note: 0
BACK
FRONT LEFT SIDE
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .. . . . .
. . . . . . . . . . .
. .
. .
42"Minimum
TankAccess
21½"13"
Page 1 of 3
QSF-V30 FILM PROCESSOR
FILM CAPACITY PER HOUR (C-41 RA4NP)
Film size Rolls
110-24 34126-24 32
135-24 26
120 32
220 18Advanced Photo System Film 26
FILM PATH
PROCESS SPECIFICATIONS
C-41RANP CD BL FIX STBProcessing tank capacities 7.6 3.1 5.4 5.7 DRYOperating temperature 100 ±0.25 95~105 95~105 95~105 122 ~ 158Time per step 195 69 136 122 122Replenisher tank capacities 12 12 12 12Water replenisher tank 5.0Waste tank capacities 3.3 8.8
(liters) (2 tanks) (3 tanks)
(Fahrenheit)
(seconds)
(liters)
(liters)
(liters)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .
Page 2 of 3
Film CutterFilm Sensor
Film (in cradle)
QSF-V30 FILM PROCESSOR
NORITSU AMERICA CORPORATIONCorporate Office:
Western Region Office:
Eastern Regional Office:
Midwest Regional Office:
Southern Regional Office:
U.S. Government Sales Office:
Noritsu Canada Ltd:
(714) 521-90406900 Noritsu Ave., Buena Park, CA 90622-5039
(714) 521-90406950 Noritsu Ave., Buena Park, CA 90622-5039
(973) 808-9898336 Route 46 East, Fairfield, NJ 07004-2429
(847) 888-8000755 Tollgate Road, Elgin, IL 60123-9301
(214) 631-24002989 North Stemmons Fwy., Dallas, TX 75247-6193
(703) 821-00071420 Spring Hill Rd., Suite 600, McLean, VA 22102-3006
(905) 567-89822680 Argentia Road, Mississauga, Ontario L5N-5V4 rev. 1.11/02/98
QSF-V30½" = 1'
PowerConnection
(under controlcabinet)
Operator Position
Note: Cooling water not used when roomtemperature kept at or below 85 F.0
Cut out and use with a scaled drawing (½" =1') of your floor plan to determine the bestlocation for the equipment.
Note:
Dimensions and shaded area indicatesclearance to walls, other equipment, etc. Additionalclearance is suggested on all sides (except side to theleft of the operator's position) and may be required bylocal codes.
minimum
20"
45"
4"
Page 3 of 3
Specifications subject to change
QSF-V30SM FILM PROCESSORINSTALLATION SPECIFICATIONS
Electrical 208 VAC Single phase 3.0kVA (15A)220 VAC Single phase 3.0kVA (14A)230 VAC Single phase 3.2kVA (14A)240 VAC Single phase 3.4kVA (14A)
2 wire feed plus separate ground wire.Sensible heat loss 6,390 @ 208 VAC ~ 6,890 @ 240 VAC B.t.u./hourOperating weightExternal dimensions ½" W x 50" H
Cooling water minute
Note:
495 Lbs.42" L x 21
Needs a minimum opening of 22" to move through a door or passage½ gallon per
Cooling water not used when room temperature kept at or below 85 F.
Note:
Note: 0
BACK
FRONT LEFT SIDE
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .. . . . . .
. . . . . . . . . . .
. .
. .
42"Minimum
TankAccess
21½"13"
Page 1 of 3
QSF-V30SM FILM PROCESSOR
PROCESS SPECIFICATIONS
C-41SM CD BL FIX STBProcessing tank capacities 4.1 2.2 3.5 4.3 DRYOperating temperature 100 ±0.25 95~105 95~105 95~105 122 ~ 158Time per step 195 69 136 122 122Water replenisher tank 5.0Waste tank capacities 2.4 0.9 4.3 4.5
(liters) (2 tanks) (3 tanks)
(Fahrenheit)
(seconds)
(liters)
(liters)
FILM CAPACITY PER HOUR (C-41SM)
Film size Rolls
110-24 34126-24 32
135-24 26
120 32
220 18IX240-25 26
FILM PATH
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . .. . . . . . . . . . . .
Page 2 of 3
Film CutterFilm Sensor
Film (in cradle)
QSF-V30SM FILM PROCESSOR
NORITSU AMERICA CORPORATIONCorporate Office:
Western Region Office:
Eastern Regional Office:
Midwest Regional Office:
Southern Regional Office:
U.S. Government Sales Office:
Noritsu Canada Ltd:
(714) 521-90406900 Noritsu Ave., Buena Park, CA 90622-5039
(714) 521-90406950 Noritsu Ave., Buena Park, CA 90622-5039
(201) 808-9898336 Route 46 East, Fairfield, NJ 07004-2429
(847) 888-8000755 Tollgate Road, Elgin, IL 60123-9301
(214) 631-24002989 North Stemmons Fwy., Dallas, TX 75247-6193
(703) 821-00071420 Spring Hill Rd., Suite 600, McLean, VA 22102-3006
(905) 567-89822680 Argentia Road, Mississauga, Ontario L5N-5V4 ©1997 Noritsu America Corporation
rev. 1.10/04/96
QSF-V30SM½" = 1'
PowerConnection
(through bottomof control cabinet)
Operator Position
Note: Cooling water not used when roomtemperature kept at or below 85 F.0
Cut out and use with a scaled drawing (½" =1') of your floor plan to determine the bestlocation for the equipment.
Note:
Dimensions and shaded area indicatesclearance to walls, other equipment, etc. Additionalclearance is suggested on all sides (except side to theleft of the operator's position) and may be required bylocal codes.
minimum
20"
45"
4"
Page 3 of 3
Specifications subject to change