Figure L3Quincy FHP
Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigL3_Quincy_BatteryPlant.vsd
04/12/13
Vendor Shall install new battery in
existing rack.
Page L7 of 7 97
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Appendix M – Tallahassee FHP
98
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page M2 of 6
Appendix M – Table of Contents – Figures and Drawings
Figure M1 – Tallahassee FHP Shelter Floor Plan .................................................... M4 of 6
Figure M2 – Tallahassee FHP -48VDC Power Distribution Rack Profile .................. M5 of 6
Figure M3 – Tallahassee FHP Battery Plant Photo .................................................. M6 of 6
99
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page M3 of 6
Tallahassee FHP Site Requirements
The Vendor shall furnish and install the following equipment at the Tallahassee FHP site located at 2100 Mahan Drive (US-90), Tallahassee, FL.
A. One Exide Absolyte GP series battery plant model number M87-024-09007-014TALV shall
be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.
The new battery plant shall be installed in the same location as the removed battery plant.
The battery modules shall be installed on the existing load spreading plate. Existing battery
cabling between the existing battery plant and DC load center may be reused, provided
sufficient length is available and cable is in good condition. NO SPLICING SHALL BE
PERMITTED. The Vendor shall replace the existing cable with like cable if new or additional
length is required. The cable from the DC load center to battery plant shall be 2/0 AWG
stranded. Red jacketed cable shall be used for -48 VDC connections and black jacketed
cable shall be used for the return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Scope of Services.
IP Address: 172.16.2.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.2.19
TABLE M1 – MAJOR EQUIPMENT LIST
Model Number Description QTY.
M87-024-09007-014TALV Exide Battery 1
AMGBACS 1001 24-2V Master Kit
Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables
1
TCL 024-112DC TracoPower DC/DC Converter 1
DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager
1
ZB24540 Atlantic Scientific Ethernet SPD 2
100
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigM1_TallahasseeFHP_ShelterFloorPlan.vsd7/19/2013
Scale: 3/8" = 1'-0"
GE MASTR II System
ChannelBankRackBR4
DVM6-45Terminal
Radio RackBR6
DVM6-45Terminal
Radio RackBR5
MAS Call Box Base Station/RWIS
Dept. of Agriculture
Radio
Tabl
e
-48 Volt DCBatteryPlant
+
Workstation DeskCPU
&UPS
CPU&
UPS
ASN/DACC Rack
-48 VDCDistribution
Rack
Passport 15000
Rack (FR4)
Page M4 of 6
BPS 2000 Location
101
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigM2_TallahasseeFHP_-48VDCPowerDistributionRack_20130109.vsd
04/12/13
Scale: 1 1/4" = 1'-0"
Figure M2
Tallahassee FHP (3-3424)
-48VDC Power Distribution Rack
Page M5 of 6
BACS
WebManager
DC/DC Converter
102
Figure M3Tallahassee FHP
Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix\FigM3_Tallahassee_BatteryPlant.vsd
03/12/13
Vendor Shall install new battery on existing load spreading plate.
Positive Terminal Shall be at the top right in accordance with original installation
Negative Terminal
Shall be at the top left
in accordance
with original installation
Page M6 of 6 103
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Appendix N – Monticello DOT
104
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page N2 of 7
Appendix N – Table of Contents – Figures and Drawings
Figure N1 – Monticello DOT Shelter Floor Plan........................................................ N5 of 7
Figure N2 – Monticello DOT -48VDC Power Distribution Rack Profile ...................... N6 of 7
Figure N3 – Monticello DOT Battery Plant Photo ..................................................... N7 of 7
105
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page N3 of 7
Monticello DOT Site Requirements
The Vendor shall furnish and install the following equipment at the Monticello DOT site located 0.5 miles north of US-19 and I-10 interchange at maintenance yard in Monticello, FL.
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R19AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable
shall be used for -48 VDC connections and black jacketed cable shall be used for the return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Scope of Services.
IP Address: 172.16.68.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.68.19
C. One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix
and Section 2.4 of this Scope of Services. The new rectifier system shall be installed in the
same location as the removed rectifier system. The two rectifiers shall be wired to separate
20A double pole Square D circuit breakers appropriate for the Square D model
QO140L200G load center. The main load center circuit breakers shall be furnished and
installed by the Vendor. All wiring shall be new and installed. Conduit may be reused.
IP Address: 172.16.68.20
Subnet Mask: 255.255.254.0
Gateway: 172.16.68.19
106
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page N4 of 7
TABLE N1 – MAJOR EQUIPMENT LIST
Model Number Description QTY.
M87-024-05007-R19AALV Exide Battery 19" rack mount 1
AMGBACS 1001 24-2V Master Kit
Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables
1
TCL 024-112DC TracoPower DC/DC Converter 1
DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager
1
Q4820N-F19DB01-VC Integrated Power System 1
225840 Flatpack2 FP2-48/150A 2B 4L LVBD 2AC
1
502666 100A Battery Disconnect breaker 1
502658 35A Circuit breaker 1
241115.105 Flatpack2 Rectifier 2
236408 Flatpack2 Blind Panels 2
507173 LUG, #1AWG, 2 hole 2
LG1D2A8A110 LUG,DH, 5/8" SP,1/4 STUD, 2/0AWG 2
ZB24540 Atlantic Scientific Ethernet SPD 4
107
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigN1_MonticelloDOT_ShelterFloorPlan.vsd7/19/2013
Scale: 1/2" = 1'-0"
-48 VDCDistribution Center
Motorola MSF 5000
DVM6-45 MW Radio
Rack (AR-2)
DVM6-45 MW Radio
Rack (AR-3)
Channel Bank Rack
(AR-7)
NMS Rack (AR-6)
3
2
1
MASCALL BOXSYSTEM
GE MASTR II
Page N5 of 7
BPS 2000 Location
108
Scale: 1 1/4" = 1'-0"
Figure N2Monticello DOT
-48VDC Power Distribution RackG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigN2_Monticello-PwrPlantRack_20130723.vsd
07/24/13
1 10 11 12 24
2 9 14 13 23
+
3 8 15 16 22
4 7 18 17 21
5 6 X 19 20
-
Page N6 of 7
BACS
WebManager
DC/DC Converter
PCP -48 VDC Power Systems
2 RU Blank Panel
Smart Pack BATT LOAD
Flatpack2
Rectifier System
109
Figure N3Monticello DOT
Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigN3_Monticello_BatteryPlant.vsd
04/12/13
Vendor Shall install new battery in existing rack.
Page N7 of 7 110
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Appendix O – Greenville
111
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page O2 of 7
Appendix O – Table of Contents – Figures and Drawings
Figure O1 – Greenville DOT Shelter Floor Plan ....................................................... O5 of 7
Figure O2 – Greenville -48VDC Power Distribution Rack Profile .............................. O6 of 7
Figure O3 – Greenville Battery Plant Photo .............................................................. O7 of 7
112
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page O3 of 7
Greenville Site Requirements
The Vendor shall furnish and install the following equipment at the Greenville site located on the north side of I-10, 0.6 miles west of the intersection of I-10 and US-221.
A. One Exide Absolyte GP series battery plant model number M87-024-05005-R19AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable
shall be used for -48 VDC connections and black jacketed cable shall be used for the return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Scope of Services.
IP Address: 172.16.66.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.66.19
C. One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix
and Section 2.4 of this Scope of Services. The new rectifier system shall be installed in the
same location as the removed rectifier system. The two rectifiers shall be wired to separate
20A double pole Square D circuit breakers appropriate for the Square D model
QO140L200G load center. The main load center circuit breakers shall be furnished and
installed by the Vendor. All wiring shall be new and installed. Conduit may be reused. The
Vendor shall furnish and install blank panels between existing distribution panels and the
Flatpack2 as appropriate and in accordance with this Appendix.
IP Address: 172.16.66.20
Subnet Mask: 255.255.254.0
Gateway: 172.16.66.19
113
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page O4 of 7
TABLE O1 – MAJOR EQUIPMENT LIST
Model Number Description QTY.
M87-024-05005-R19AALV Exide Battery 19" rack mount 1
AMGBACS 1001 24-2V Master Kit
Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables
1
TCL 024-112DC TracoPower DC/DC Converter 1
DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager
1
Q4820N-F19DB01-VC Integrated Power System 1
225840 Flatpack2 FP2-48/150A 2B 4L LVBD 2AC
1
502666 100A Battery Disconnect breaker 1
502658 35A Circuit breaker 1
241115.105 Flatpack2 Rectifier 2
236408 Flatpack2 Blind Panels 2
507173 LUG, #1AWG, 2 hole 2
LG1D2A8A110 LUG,DH, 5/8" SP,1/4 STUD, 2/0AWG 2
ZB24540 Atlantic Scientific Ethernet SPD 4
114
BPS 2000 Location
SCALE: 1/2"=1'
MASMinute ManEnterprise
E750
A/C
Channel Bank/ BPS Network
Rack
DVM6-45RadioRack
-48 VoltPower Plant& Batteries
Figure O1Greenville
Shelter Floor Plan
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigO1_Greenville As Built Floor Plan.vsd07/19/13
Page O5 of 7
115
Scale: 1 1/4" = 1'-0"
Figure O2Greenville
-48VDC Power Distribution RackG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigO2_Greenville-PwrPlantRack_20130724.vsd
07/24/13
Absolyte Battery Bank
Absolyte Battery Bank
Absolyte Battery Bank
Absolyte Battery Bank81 9 16 17 24
72 10 15 18 23
63 11 14 19 22
54 12 13 20 21
+-
Page O6 of 7
BACS
WebManager
DC/DC Converter
Flatpack2
Rectifier System
2RU Blank Panel
Smart Pack BATT LOAD
7RU Blank Panel
116
Figure O3Greenville
Battery Plant
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigO3_Greenville_BatteryPlant.vsd04/12/13
Vendor Shall install new battery in existing rack.
Page O7 of 7 117
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Appendix P – Jacksonville FHP
118
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page P2 of 6
Appendix P – Table of Contents – Figures and Drawings
Figure P1 – Jacksonville FHP Shelter Floor Plan ..................................................... P4 of 6
Figure P2 – Jacksonville FHP -48VDC Power Distribution Rack Profile ................... P5 of 6
Figure P3 – Jacksonville FHP Battery Plant Photo……………………………………… P6 of 6
119
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Page P3 of 6
Jacksonville FHP Site Requirements
The Vendor shall furnish and install the following equipment at the Jacksonville site located at 7322 Normandy Blvd., Jacksonville, FL.
A. One Exide Absolyte GP series battery plant model number M87-024-09009-014TALV shall
be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.
The new battery plant shall be installed in the same location as the removed battery plant.
Existing battery cabling between the existing battery plant and DC load center may be
reused, provided sufficient length is available and cable is in good condition. NO SPLICING
SHALL BE PERMITTED. The Vendor shall replace the existing cable with like cable if new
or additional length is required. The cable from the DC load center to battery plant shall be
2/0 AWG stranded. Red jacketed cable shall be used for -48 VDC connections and black
jacketed cable shall be used for the return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Scope of Services.
IP Address: 172.16.64.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.64.19
TABLE P1 – MAJOR EQUIPMENT LIST
Model Number Description QTY.
M87-024-09009-014TALV Exide Battery 1
AMGBACS 1001 24-2V Master Kit
Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables
1
TCL 024-112DC TracoPower DC/DC Converter 1
DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager
1
ZB24540 Atlantic Scientific Ethernet SPD 2
120
BPS 2000 Location
SCALE: 3/8"=1'
GroundingStrip
MWRadio Rack
AG2
MWRadio Rack
AG1
MW RadioTerminal
AG3
+
-48 Volt DCBatteryPlant
-48V DCDistribution
Rack
D2 Fiber Rack
Radio
MASCallbox
Network/Fiber Rack
DACCs& ChannelBank Rack
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigP1_Jacksonville As Built Floor Plan.vsd07/19/13
Page P4 of 6
New Passport
Rack
121
G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigP2_JacksonvilleFHP_-48VDCPowerDistributionRack_20130109.vsd
04/12/13
Figure P2
Jacksonville FHP
-48VDC Power Distribution Rack
Scale: 1 1/4" = 1'-0"
Page P5 of 6
BACS
WebManager
DC/DC Converter
122
Figure P3Jacksonville FHP
Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix\FigP3_Jacksonville_BatteryPlant.vsd
03/12/13
Vendor Shall install new battery on existing load spreading plate.
Positive Terminal Shall be at the top right in accordance with original installation
Negative Terminal
Shall be at the top left
in accordance
with original installation
Page P6 of 6 123
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Appendix Q – ITS Facility Management System Form
124
FLORIDA DEPARTMENT OF TRANSPORTATION
I-10 BATTERY PLANT REPLACEMENT
Appendix Q – Table of Contents – Figures and Drawings
Figure Q1 – ITS FM Electric DC Power Attribute Form ............................................ Q3 of 3
125
Items shown in ITALICS are considered optional information Page ____ of ____
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
ITS Facility Management System Electric DC Power Attribute Form
ITSFM054 Page 1 of 1 Rev. 11/12
Date:
Inspector:
Site Identification Name:
Information for DC Power Installed at this Site DC Power Distribution Equipment
Manufacturer:
Model:
Serial Number:
NIC Card Installed: Yes No
IP Address:
MAC Address:
Input Voltage: 12 VDC 24 VDC - 48 VDC
120 VAC POE Unknown
Output Voltage: 12 VDC 24 VDC - 48 VDC
120 VAC POE Unknown
Load/Draw (Amp):
Number of Rectifier Positions:
Number of Breaker Positions: Rectifier DC-DC Converter
Rectifier Type:
Number of Rectifier(s):
Manufacturer:
Model:
DC-DC Converter Shelf Installed: Yes No
Number of Converter(s):
Number of Converter Positions:
Manufacturer:
Model: Control Panel Battery
Manufacturer:
Model:
Serial Number:
Battery Pack Installed: Yes No
Battery Type: Flooded AGM Gel
Date Battery Installed / Replace:
Manufacturer:
Model/Size: Qty:
EXAM
PLE
126