FEMA’s Hazard Mitigation
Assistance Grant Programs
Jeff Ward, JSWA
![Page 2: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/2.jpg)
Hazard Mitigation Grant
Program (HMGP)
Overview
![Page 3: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/3.jpg)
HMGP Introduction and Summary
• Section 404 of the Stafford Act
• Administered by FEMA
• Funding: Total Federal assistance, subject to sliding scale formula:
–Up to 15% of the first $2 billion
–Up to 10% for amounts $2B and $10B
–Up to 7.5% for amounts between $10B and $35.33B
–These grants are 75% federally funded/25% local
![Page 4: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/4.jpg)
HAZARD MITIGATION GRANT PROGRAM
Projects must:
Solve a problem
Have a beneficial impact
Be cost effective
Substantially reduce future risk
Be environmentally sound
![Page 5: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/5.jpg)
Benefit Cost Analysis
(BCA)
![Page 6: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/6.jpg)
“Calculated using the Net Present Value”
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
now $50k $50k $50k $50k
$25.4
$18.1
$12.9
$92k
$35.6
Present value of 20 years of losses is $92k not $200k
BEHIND THE CURTAIN
![Page 7: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/7.jpg)
Benefit Cost Analysis
Benefit Cost Analysis:
• Avoided future losses > Cost
• FEMA software - BCA done on each individual home
• For buyouts - Substantial Damage Waiver or
$276,000 waiver
– MUST BE IN FEMAs SFHA
• For Elevations - $175,000 waiver – MUST BE IN FEMAs SFHA
![Page 8: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/8.jpg)
Benefit Cost Analysis
• No waiver for Mitigation/Reconstruction
• It the property does not meet above waivers (In
SFHA)
– Elevation Certificate and Flood Insurance Study
– At least three prior known flood losses to complete the
required BCA
• If outside SFHA – At least three prior known flood losses to complete the required BCA
![Page 9: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/9.jpg)
Mitigation of Flood
Damaged Homes
![Page 10: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/10.jpg)
Mitigation of Flood Damaged Homes
Primary Mitigation project types
•Home Acquisition and Demolition
•Home Elevation
![Page 11: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/11.jpg)
The acquisition of an existing at-risk structure and conversion of
the land to open space.
Property Acquisition and Structure Demolition
![Page 12: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/12.jpg)
Voluntary Participation
•FEMA Buyouts are strictly voluntary – No homeowners are ever forced to sell
– No owner relocation assistance
![Page 13: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/13.jpg)
The Typical Buyout Process
• Appraise
– Pre-Flood
– DOB
• Generate offer
• Appeal Process
– Owner paying for an independent appraisal
– State has final say in value
• Title search
![Page 14: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/14.jpg)
The Typical Buyout Process
• Closing
– Properties must be vacant at the time of closing
– Necessary paperwork to transfer clear title
– Owner receives net proceeds
• FEMA Deed Restrictions
• Demolish buildings and clear sites
![Page 15: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/15.jpg)
Timeframe
•From Appraisal to Closing
–Can be completed in 90 Days
•Assuming
–Seller is ready to sell
–No title issues
![Page 16: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/16.jpg)
Elevation
• One of the most common retrofitting methods is
elevating
• When a house is properly elevated, the living area
will be above all but the most severe floods (such as
the 500 year flood).
• Almost any home can be elevated
• Most elevations in TX are slab on grade
![Page 17: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/17.jpg)
• Raise existing structure two foot
above base flood elevation (BFE)
• Project must be cost-effective
• Elevation methods:
– Continuous foundation walls
– Piles, piers, posts, or columns
17
Elevation
![Page 18: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/18.jpg)
• Benefit
–Prior flood loss
–Depth in the floodplain
• Cost
–Method of elevation
–Lift height
–Vertical footprint 18
Elevation
![Page 19: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/19.jpg)
19
Architectural and engineering fees
Permitting
Clearing necessary vegetation
Excavation around the dwelling
Lifting or jacking building
Temporary support cribbing
Eligible Elevation Costs
![Page 20: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/20.jpg)
20
Disconnecting , extending, and reconnecting utilities
Constructing a compliant foundation
Cost associated with elevating the building to the
required height
Restoring the lawn, walks, driveways, and other
surfaces outside the perimeter exterior walls, if
damaged by the elevation process
Eligible Elevation Costs
![Page 21: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/21.jpg)
• Costs related to building additions or auxiliary structures
• Construction of new decks or porches
• Any improvements for purely aesthetic reasons, unless
required by the EHP compliance review
• Additional landscaping for ornamentation beyond what
existed on the site prior to construction of the project (e.g.,
trees, shrubs)
Ineligible Costs
![Page 22: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/22.jpg)
22
Understand who is interested
Acquisition or Elevation
Complete Benefit Cost Analysis
Aggregate BCR > 1.0
Obtain Council Approval based on interest/eligibility
Application for interested/cost effective homes
Submit application by Due date
Wait for results of review
What’s Next
![Page 23: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/23.jpg)
23
Elevations – Before and After
![Page 24: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/24.jpg)
![Page 25: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/25.jpg)
![Page 26: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/26.jpg)
![Page 27: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/27.jpg)
![Page 28: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/28.jpg)
![Page 29: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/29.jpg)
![Page 30: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/30.jpg)
![Page 31: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/31.jpg)
![Page 32: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/32.jpg)
![Page 33: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4](https://reader036.vdocuments.us/reader036/viewer/2022071010/5fc8a785ee53ff35cc7f31ca/html5/thumbnails/33.jpg)
Questions?
Prepared by Jeffery S. Ward and Associates, Inc.